CN202331551U - Risk management and review system for safety in production - Google Patents
Risk management and review system for safety in production Download PDFInfo
- Publication number
- CN202331551U CN202331551U CN2011203812506U CN201120381250U CN202331551U CN 202331551 U CN202331551 U CN 202331551U CN 2011203812506 U CN2011203812506 U CN 2011203812506U CN 201120381250 U CN201120381250 U CN 201120381250U CN 202331551 U CN202331551 U CN 202331551U
- Authority
- CN
- China
- Prior art keywords
- safety
- risk management
- production
- module
- review
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a risk management and review system for safety in production, comprising a central processing server, a data storage array and at least one review terminal phase, wherein each review terminal comprises a setting module, an auditing module, a report forms module as well as a standard and specification module; and the review terminal is further provided with a display device, an input device, an image acquisition device and an image and word output device. The system provides a perfect computerized automatic system used for risk management and review system for safety in production for enterprise, and the system can replace the previous business process of paper grading and integrate grading record, score and the descriptions of auditing problem and the like, so that user can conveniently create auditing and audit. Moreover, result can also be subjected to calculation and statistics. In this way, the working efficiency of grading experts is greatly increased, and continuous analysis for historical grading data can be conveniently, completely and accurately performed.
Description
Technical field
The utility model relates to a kind of management system of enterprise, particularly a kind of safety in production risk management estimating and examining system.
Background technology
In recent years, safety in production risk management system is risen in industries such as mine, power supplies gradually.The system building-up work comprises the formulation methods of risk assessment; Implement the requirement of system key element, integration management standard and job instruction.Carry out system application work, the utilization risk evaluation result proposes risk control measure, realizes risk control comprehensively; Carry out the application of administrative standard and job instruction, realize management and job standardization; Carry out task and observe, promote the realization of preventive management; Carry out hardware modifications and perfect such as on-site working, production environment, set up the environment of safety and Health; Carry out the system audit, discovery advantage and chance, the Continual Improvement that the promotion system is used.Through the system construction, foundation is the center with the risk management, is the modern safety production management system of means with the PDCA closed loop management.
Wherein, audit comprises internal check and eternal review.Purpose is the way of thinking of utilization system; Control systems content and system practical operation situation; Excavate the problem that exists in the production safety management, comprehensively, systematically assess adequacy, suitability and the validity of enterprise security production management, and " plan (scheme), carry out (execution), comply with (consistency), performance (performance) " from the SECP four processes; Comprehensive evaluation enterprise system operation performance is sought and is improved chance.
At present the scoring tissue is expert group's form, and will mark record, mark, audit problem description etc. of expert are recorded on the blank sheet of paper, and calculating, adding up also is pure manual mode.More than the scoring content, weight of task had a strong impact on expert's work efficiency, more very be historical score data continuity analysis can not make things convenient for, complete and carry out exactly.
The utility model content
In order to overcome the shortcoming of existing examination means, the utility model provides the complete computer network system of a cover, to safety and production risk management evaluation comprehensive support is provided.
The technical scheme that the utility model is taked is:
A kind of safety in production risk management estimating and examining system; Comprise central processing server that focuses on data and the data storage array that is connected with said central processing server; Said central processing server is connected with at least one evaluation terminal through telecommunication network; Each evaluation terminal all includes module, auditing module, Reports module and standards and norms module is set, and said evaluation terminal also all has display device, input media, image collection device and image character output unit.
As a kind of optimization of above technical scheme, be used to connect said central processing server and comprise wide area network and internet with the telecommunication network of evaluating the terminal.
As a kind of optimization of above technical scheme, said image collection device is any digital camera that can be connected with said evaluation terminal through USB interface.
As a kind of optimization of above technical scheme, said image character output unit is a printer.
The beneficial effect of the utility model is:
The utility model provides a kind of safety in production risk management estimating and examining system; Set up the computerize automatic system of the perfect safety in production risk management evaluation of a cover for enterprise; The operation flow of papery scoring before this system can substitute; The descriptions such as record, mark, audit problem of will marking are integrated in the system, and the user can create audit very easily and examine.Also can calculate and add up for the result.Improved scoring expert's work efficiency greatly, can be very convenient, complete and carry out historical score data continuity exactly and analyze.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further:
Fig. 1 is the theory diagram of the utility model.
Embodiment
As shown in Figure 1; The safety in production risk management estimating and examining system that the utility model proposed; Comprise the central processing server 1 that focuses on data; Its role as ftp server in an embodiment of the utility model exists, and this central processing server 1 also is connected with data storage array 2, realizes the storage backup services to data.
Said central processing server 1 is connected with a plurality of evaluations terminal 3 through telecommunication network, and the scoring that this system provided, statistical function can be realized on evaluation terminal 3.Like this; Each evaluation terminal 3 all includes module 31, auditing module 32, Reports module 33 and standards and norms module 34 is set; In addition, said evaluation terminal 1 also all has display device 35, input media 36, image collection device 37 and image character output unit 38.Wherein, auditing module 32 is nucleus modules of system, and it mainly comprises the establishment audit, examines scoring, marks, derives function points such as examining, import audit, merging audit and comprehensive inquiry fast.The user can select the corresponding button of any function point to get into corresponding interface, the line operate of going forward side by side.Scoring needs corresponding audit data, therefore before to the specific factor scoring, needs to create earlier audit, perhaps imports audit.Can examine scoring, scoring fast, derive audit it on this basis.Can also a plurality of audits be merged and obtain a new audit.System can also go out the scoring situation of concrete audit and corresponding chapters and sections according to audit name, chapters and sections name, score number percent interval query.
Standards and norms module 34 is modules that the standard of marking is managed, and has comprised to open standard and download two function points of standard.Opening standard can check the existing standard of current standard, can see all the elements that this standard comprises.Download standard and can download new standard from ftp server, promptly can be according to new specification creation audit, the work of giving a mark accordingly.
Concretely, said evaluation terminal 3 can be the desk-top computer commonly used with network function, and its keyboard is that input media 36 its displays then are display device 35, realizes the input and the demonstration of data, and realizes above-described scoring statistical function.
Be used to connect said central processing server 1 and comprise wide area network and internet with the telecommunication network of evaluating terminal 3, the system of being convenient to is with all data centralization management and make things convenient for client call.
In addition, the image collection device 37 that had of evaluation terminal 3 can be for any digital camera that can be connected with said evaluation terminal through USB interface, to realize importing to system the purpose of image data; And the image character output unit 38 that said evaluation terminal 3 is had is printer.
The client computer of native system (promptly evaluating terminal 3) through software can and ftp server (being central processing server 1) between mutual file, realized information sharing and data backup.Consideration based on factors such as practicality, easy care rate, cost of development and search speeds; In addition, native system adopts the carrier of XML file as data storage, and the interface towards microsoft office is provided; Can form be exported to the WORD document, convenient user's operation.
In sum; The utility model provides a kind of safety in production risk management estimating and examining system; The computerize automatic system that provides perfect being used to of a cover to keep the safety in production the risk management evaluation for enterprise; The operation flow of papery scoring before this system can substitute, descriptions such as the record of will marking, mark, audit problem are integrated in the system, and the user can create audit very easily and examine.Also can calculate and add up for the result.Improved scoring expert's work efficiency greatly, can be very convenient, complete and carry out historical score data continuity exactly and analyze.
The above be the utility model preferred embodiment, it does not constitute the restriction to the utility model protection domain, so long as realize that with essentially identical means the purpose of the utility model all should belong to the protection domain of the utility model.
Claims (4)
1. safety in production risk management estimating and examining system; It is characterized in that: comprise central processing server (1) that focuses on data and the data storage array (2) that is connected with said central processing server (1); Said central processing server (1) is connected with at least one evaluation terminal (3) through telecommunication network, and said evaluation terminal (3) also all has display device (35), input media (36), image collection device (37) and image character output unit (38).
2. safety in production risk management estimating and examining system according to claim 1 is characterized in that: the telecommunication network that is used to connect said central processing server (1) and evaluate terminal (3) comprises wide area network and internet.
3. safety in production risk management estimating and examining system according to claim 1 is characterized in that: said image collection device (37) is any digital camera that can be connected with said evaluation terminal through USB interface.
4. safety in production risk management estimating and examining system according to claim 1 is characterized in that: said image character output unit (38) is a printer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203812506U CN202331551U (en) | 2011-10-10 | 2011-10-10 | Risk management and review system for safety in production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203812506U CN202331551U (en) | 2011-10-10 | 2011-10-10 | Risk management and review system for safety in production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202331551U true CN202331551U (en) | 2012-07-11 |
Family
ID=46443523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203812506U Expired - Fee Related CN202331551U (en) | 2011-10-10 | 2011-10-10 | Risk management and review system for safety in production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202331551U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015137970A1 (en) * | 2014-03-14 | 2015-09-17 | Mun Johnathan | Qualitative and quantitative modeling of enterprise risk management and risk registers |
CN105207746A (en) * | 2015-10-08 | 2015-12-30 | 江苏天智互联科技股份有限公司 | Communication system and method based on PDCA model |
CN108664563A (en) * | 2018-04-11 | 2018-10-16 | 莱茵技术(上海)有限公司 | A kind of digitized management system checking method |
CN109471497A (en) * | 2018-11-24 | 2019-03-15 | 深圳市安富消防安全技术有限公司 | Safety standardization establishment and review system |
CN111222734A (en) * | 2018-11-27 | 2020-06-02 | 中国石油天然气股份有限公司 | Emergency management auditing method and system |
-
2011
- 2011-10-10 CN CN2011203812506U patent/CN202331551U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015137970A1 (en) * | 2014-03-14 | 2015-09-17 | Mun Johnathan | Qualitative and quantitative modeling of enterprise risk management and risk registers |
CN105207746A (en) * | 2015-10-08 | 2015-12-30 | 江苏天智互联科技股份有限公司 | Communication system and method based on PDCA model |
CN105207746B (en) * | 2015-10-08 | 2018-06-26 | 江苏天智互联科技股份有限公司 | Communication system and its communication means based on PDCA models |
CN108664563A (en) * | 2018-04-11 | 2018-10-16 | 莱茵技术(上海)有限公司 | A kind of digitized management system checking method |
CN109471497A (en) * | 2018-11-24 | 2019-03-15 | 深圳市安富消防安全技术有限公司 | Safety standardization establishment and review system |
CN109471497B (en) * | 2018-11-24 | 2024-02-02 | 深圳市安富消防安全技术有限公司 | Safety standardized compiling and reviewing system |
CN111222734A (en) * | 2018-11-27 | 2020-06-02 | 中国石油天然气股份有限公司 | Emergency management auditing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202331551U (en) | Risk management and review system for safety in production | |
CN106296445A (en) | A kind of power customer label construction method | |
CN103679384A (en) | Method for workflow cooperative office work | |
Mendes Calo et al. | Information sharing | |
CN104361445A (en) | Real-time labor management system and management method | |
CN104463439A (en) | Highway engineering project managing system and method | |
CN105184886A (en) | Cloud data center intelligence inspection system and cloud data center intelligence inspection method | |
CN105528337A (en) | Method for exporting PPT reports from performance management system through data conversion | |
CN108195423A (en) | A kind of data integrated system and method for engineering monitoring | |
CN109284981A (en) | A kind of employee satisfaction survey questionnaire information system and method | |
CN104796282A (en) | Evaluating system and evaluating method for deep packet inspection product | |
CN105761004A (en) | Patrol process management system | |
Stade et al. | Providing a user forum is not enough: First experiences of a software company with CrowdRE | |
TW200421139A (en) | System and method for employee performance assessing | |
CN103077426A (en) | Method and system for assisted assessment of information security capacity maturity | |
CN206363382U (en) | A kind of staff attendance management system based on WIFI probes and Bluetooth technology | |
WO2012009901A1 (en) | Data acquisition method in network resource estimation and system thereof | |
CN101231515B (en) | Wireless monitoring management system for group vibrator | |
CN101741666B (en) | Method to realize multi-instances in the workflow by network structure division | |
CN201601832U (en) | Wireless communication network working condition monitoring device | |
CN104240029A (en) | Service point managing system and method based on engine scanning | |
CN104035856A (en) | Virtual desktop monitoring method and device | |
CN205103865U (en) | Work of developing a party developments information management of basic unit device | |
CN108009793A (en) | A kind of student's communication system | |
CN101763530A (en) | B/S architecture based general cadre assessment system research and implementation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20161010 |
|
CF01 | Termination of patent right due to non-payment of annual fee |