CN202325382U - Blowout prevention tool assembly for underground operation - Google Patents

Blowout prevention tool assembly for underground operation Download PDF

Info

Publication number
CN202325382U
CN202325382U CN2011204893500U CN201120489350U CN202325382U CN 202325382 U CN202325382 U CN 202325382U CN 2011204893500 U CN2011204893500 U CN 2011204893500U CN 201120489350 U CN201120489350 U CN 201120489350U CN 202325382 U CN202325382 U CN 202325382U
Authority
CN
China
Prior art keywords
leading screw
top connection
screw
cone
blowout prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204893500U
Other languages
Chinese (zh)
Inventor
杨福军
李振军
崔志强
贺文付
毛伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUXIN CHIYU PETROLEUM MACHINERY Co Ltd
Original Assignee
FUXIN CHIYU PETROLEUM MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUXIN CHIYU PETROLEUM MACHINERY Co Ltd filed Critical FUXIN CHIYU PETROLEUM MACHINERY Co Ltd
Priority to CN2011204893500U priority Critical patent/CN202325382U/en
Application granted granted Critical
Publication of CN202325382U publication Critical patent/CN202325382U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model belongs to an underground tool of an oil and gas field and in particular relates to a blowout prevention tool assembly for underground operation. An upper joint (1) is in threaded connection with a tension rod (7); a jacket (2) is in threaded connection with an upper screw (9); the upper screw (9) and a lower joint (24) are fixed by an unsetting shear pin (20); a clamping block (3) is arranged in a key sleeve (5), the lower part of the clamping block (3) is supported by the upper joint (1) and the key sleeve (5), and the upper part of the clamping block (3) is limited by a pressing sleeve (6); the upper screw (9) and a lower screw (16) are limited in the radial direction in a groove of the upper joint (1) through a key block (4); an upper cone (10) is connected with the upper screw (9) through leftward-rotation trapezoidal threads; a lower cone (15) is connected with the lower screw (16) through rightward-rotation trapezoidal threads; the upper end of the tension rod (7) is in threaded connection with the upper joint (1), and the lower end of the tension rod (7) is in threaded connection with the lower joint (24) through a tension stick (25). The blowout prevention tool assembly is simple and effective in setting, firm in anchoring, and safe and reliable in unclamping, and a slip is forcedly reset during unclamping.

Description

Underground work blowout prevention instrument assembly
Technical field
The utility model belongs to the oil gas field downhole tool, particularly a kind of underground work blowout prevention instrument assembly.
Background technology
After work measure such as oil field compression fracture, short covering, during lift pipe string, there is pressure in the shaft bottom; Liquid will spray well head in the well, not only pollutes the well site, and when the spray gesture is very big, also hurts sb.'s feelings easily; Behind pressing crack construction, common first blowout prevention could play lift pipe string then; So not only job execution is constant, and the loss stratum energy, in the oil recovery process in later stage, will influence fuel-displaced effect.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned technical deficiency, and the underground work blowout prevention instrument assembly of a kind of blowout prevention, environmental protection, assurance oil recovery is provided.
The technical scheme that the utility model technical solution problem adopts is: underground work blowout prevention instrument assembly comprises top connection, separates big envelope, upper cone, back of the body cap, slips cover, slips, slips spring, lower cone, snap one, snap seat, sealing shroud, deblocking shear pin, snap two, packing element, lower back cap, lower contact; Be characterized in the top connection stayed mast that is threaded; Sheath is threaded and goes up leading screw; Fix with the deblocking shear pin between last leading screw and the lower contact, fixture block is installed in the key cover, and the fixture block bottom is supported by top connection and key cover; Top is spacing by gland; Last leading screw is radially spacing in the groove of top connection by the key piece with following leading screw, and upper cone is connected with the left-handed trapezoidal thread of last leading screw, and lower cone is connected with following leading screw dextrorotation trapezoidal thread; Stayed mast upper end is threaded with top connection, being threaded through chest-developing bar between stayed mast lower end and the lower contact.
The beneficial effect of the utility model is: underground work blowout prevention instrument assembly is sat card through both forward and reverse directions trapezoidal thread transfer torque mode, make set simple effectively, grappling is firm, slips forced resetting during unfreezing; Unfreezing is safe and reliable; Have the anti-resistance of fixture block mechanism, instrument shear pin before not sitting card is not stressed, have the key piece; The ability transfer torque makes slips can sit card.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is a underground work blowout prevention instrument assembly structure sectional view.
Among the figure, the 1-top connection; The 2-sheath; The 3-fixture block; 4-key piece; 5-key cover; The 6-gland; The 7-stayed mast; 8-separates big envelope; The last leading screw of 9-; The 10-upper cone; 11-carries on the back cap; 12-slips cover; The 13-slips; 14-slips spring; The 15-lower cone; Leading screw under the 16-; 17-snap one; 18-snap seat; The 19-sealing shroud; 20-deblocking shear pin; 21-snap two; The 22-packing element; 23-lower back cap; The 24-lower contact; The 25-chest-developing bar.
The specific embodiment
Embodiment, with reference to accompanying drawing 1, the top connection 1 of the underground work blowout prevention instrument assembly stayed mast 7 that is threaded; Last leading screw 9 sheath 2 that is threaded; Fixing with deblocking shear pin 20 between last leading screw 9 and the lower contact 24, it is fixing with lower contact 24 to separate big envelope 8 usefulness deblocking shear pins 20, and fixture block 3 is installed in the key cover 5; Fixture block 3 bottoms are supported by top connection 1 and key cover 5, and top is spacing by gland 6.Last leading screw 9 is radially spacing in the groove of top connection 1 by key piece 4 with following leading screw 16, locks with snap 1 between following leading screw 16 and the snap seat 18, and upper cone 10, slips 13, slips spring 14 are packed in the slips cover 12 successively, and fixes with carrying on the back cap 11.Upper cone 10 is connected with last leading screw 9 left-handed trapezoidal threads; Be connected by pin with slips cover 12; Lower cone 15 is connected with following leading screw 16 dextrorotation trapezoidal threads, is connected by pin with slips cover 12, is threaded through chest-developing bar 25 between stayed mast 7 lower ends and the lower contact 24; In lower contact 24 and separate and establish sealing shroud 19 and snap 2 21 between the big envelope 8, fix at lower contact 24 peripheral hardware packing elements 22 and with lower back cap 23.
The underground work blowout prevention instrument assembly course of work is: top connection 1 about upper lifting pipe post 100mm, stopped 5 ~ 10 minutes after connecting pump arrival design attitude; And then turn clockwise about tubing string 10 circles; The lower cone 15 that following leading screw 16 dextrorotation trapezoidal threads connect is up, slips 13 is ejected be anchored on the well inwall upper lifting pipe post; Stayed mast 7 passes to lower contact 24 drive packing elements 22 with upper lifting force through chest-developing bar 25 and sets; And the state that will set is locked in down on the leading screw 16 through snap 1, snap 2 21, snap seat 18, finally passes on the slips 13.When the cycle of finishing the work, following special-purpose fishing tool is pulled following operation blowout prevention instrument assembly out in well, and fishing tool drags for when separating big envelope 8; The upper lifting pipe post, when upper lifting force during greater than 70 ~ 100KN, deblocking shear pin 20 is cut off; Separate that big envelope 8 articulates key piece 4 successively, goes up leading screw 9, back of the body cap 11, upper cone 10 be up, last leading screw 9 lower ends open the lobe thread failure, last leading screw 9 separates with following leading screw 16; Slips 13 is radially reclaimed remove grappling, sealing shroud 19 will be crossed the liquid passage in the time of up and open, and make pressure balance on the instrument; On carry oil pipe, screw pump blowout prevention anchor is proposed outside the well.

Claims (1)

1. underground work blowout prevention instrument assembly; Comprise top connection (1), separate big envelope (8), upper cone (10), back of the body cap (11), slips cover (12), slips (13), slips spring (14), lower cone (15), snap one (17), snap seat (18), sealing shroud (19), deblocking shear pin (20), snap two (21), packing element (22), lower back cap (23), lower contact (24); It is characterized in that top connection (1) stayed mast (7) that is threaded; Sheath (2) is threaded and goes up leading screw (9); Fixing between last leading screw (9) and the lower contact (24) with deblocking shear pin (20); Fixture block (3) is installed in the key cover (5); Fixture block (3) bottom is supported by top connection (1) and key cover (5), and top is spacing by gland (6), and last leading screw (9) is radially spacing in the groove of top connection (1) by key piece (4) with following leading screw (16); Upper cone (10) is connected with the left-handed trapezoidal thread of last leading screw (9); Lower cone (15) is connected with following leading screw (16) dextrorotation trapezoidal thread, and stayed mast (7) upper end is threaded with top connection (1), being threaded through chest-developing bar (25) between stayed mast (7) lower end and the lower contact (24).
CN2011204893500U 2011-12-01 2011-12-01 Blowout prevention tool assembly for underground operation Expired - Lifetime CN202325382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204893500U CN202325382U (en) 2011-12-01 2011-12-01 Blowout prevention tool assembly for underground operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204893500U CN202325382U (en) 2011-12-01 2011-12-01 Blowout prevention tool assembly for underground operation

Publications (1)

Publication Number Publication Date
CN202325382U true CN202325382U (en) 2012-07-11

Family

ID=46437364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204893500U Expired - Lifetime CN202325382U (en) 2011-12-01 2011-12-01 Blowout prevention tool assembly for underground operation

Country Status (1)

Country Link
CN (1) CN202325382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115263229A (en) * 2022-09-19 2022-11-01 山东普瑞思德石油技术有限公司 Back-insertable sealing packer and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115263229A (en) * 2022-09-19 2022-11-01 山东普瑞思德石油技术有限公司 Back-insertable sealing packer and using method thereof

Similar Documents

Publication Publication Date Title
CN102337860B (en) Packer
CN105840126B (en) A kind of hanger running tool given up that links
CN206830123U (en) A kind of HTHP packer of band elasticity deblocking ratchet and balance bypass
CN104120998A (en) Suspension packer for gas well layered exploitation
CN101781977A (en) Bidirectional high-pressure detachable bridge plug
CN202325382U (en) Blowout prevention tool assembly for underground operation
CN203905888U (en) Mechanical retrievable packer
CN106761538A (en) A kind of oil field is every using long packing element packer
CN201794552U (en) Large-diameter fracturing packer
CN102134977A (en) Secondary plugging valve
CN102561988B (en) Small-diameter water-swelling setting plug
CN202325386U (en) Stepped setting fracture packer
CN201474656U (en) Retrievable water shutoff pipe column tool
CN204782916U (en) Sleeve pipe is bridging plug for fracturing
CN202731830U (en) Removable and drillable type packer for oil well
CN202117602U (en) Hydraulic anchor for continuous oil pipe
CN201802321U (en) Safe joint for testing tubular column tail tube
CN202866701U (en) Releasing tool used for releasing tubular column
CN202882843U (en) Self-seal-examining fracturing bridge plug
CN201129161Y (en) Small diameter compressing packer
CN106089144A (en) A kind of permanent packer given up
CN202348212U (en) Annular hydraulic compression type packer
RU2702041C1 (en) Device for oriented rupture of rocks
CN202866702U (en) Safe release tool for horizontal well
CN201620784U (en) Novel safe releasing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120711

CX01 Expiry of patent term