CN202324636U CN2011204579161U CN201120457916U CN202324636U CN 202324636 U CN202324636 U CN 202324636U CN 2011204579161 U CN2011204579161 U CN 2011204579161U CN 201120457916 U CN201120457916 U CN 201120457916U CN 202324636 U CN202324636 U CN 202324636U
Authority
CN
China
Prior art keywords
fixedly connected
construction
standpipe
job site
building waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204579161U
Other languages
Chinese (zh)
Inventor
楼永良
蒋金生
皮朝阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2011204579161U priority Critical patent/CN202324636U/en
Application granted granted Critical
Publication of CN202324636U publication Critical patent/CN202324636U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a construction site construction waste transporting device. The construction site construction waste transporting device comprises a vertical pipe, wherein the vertical pipe is fixedly connected to a constructed vertical surface; an inclined pipe obliquely extends outward from the vertical pipe; the top of the inclined pipe is a feeding opening; the vertical pipe is fixedly connected with an angle iron bracket; the angle iron bracket is fixedly connected to the vertical surface so that the vertical pipe is fixedly connected with the vertical surface; the vertical pipe is fixedly connected with the angle iron bracket by a hoop bolt; and the angle iron bracket is fixedly connected with the vertical surface by an opposite-pull screw rod. By using the construction site construction waste transporting device disclosed by the utility model, the cleaning and transporting problem of the construction site construction waste can be effectively solved; civilization standardization and green construction levels of the site are increased; the technical difficulty of dust prevention in the site waste transporting process is solved; the improvements on occupational health and safety, environmental management as well as overall efficiency of the construction enterprises are promoted; and the green construction progress is indeed propelled. The construction site construction waste transporting device disclosed by the utility model has the advantages of firmness, reliability, economic efficiency, applicability, flexibility, convenience and capability of being transferred in multiple projects.

Description

Job site building waste conveying arrangement
Technical field
The utility model relates to a kind of job site building waste conveying arrangement.
Background technology
The device system of job site building waste transportation also formation regularization, tool, along with the development of building construction technology, the while advocates energetically and carries out under the background of green construction; Original form of construction work does not satisfy the requirement of green construction; For making the maximization of economy of resources, prevent the wasting of resources, improve resource utilization; Making some fixed assets of job site repeat turnover uses; Alleviate operating personnel's labour intensity, satisfy the dust control and noise absorption requirement of construction site, carry out green construction.The cleaning of job site building waste all is to be transported to ground by the operating personnel of construction enterprises through modes such as trolley or packed or people's goods elevators disposing at present; The waste great amount of manpower and material resources; Be unfavorable for the green construction and the environmental protection of construction site; Cause the waste of ample resources simultaneously, construction cost is high, benefit is low and the civilized construction level is totally lower.
The utility model content
The purpose of the utility model is to provide job site building waste conveying arrangement, and can solve the building waste processing of existing job site effectively wastes time and energy, waste resource, the problem that construction cost is high.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme:
Job site building waste conveying arrangement is characterized in that: comprise standpipe, standpipe is fixedly connected on the vertical facade of accomplishing of constructing, the oblique inclined tube that is outward extended with of standpipe, and the top of inclined tube is a charging aperture.
Further, standpipe is fixedly connected with angle bar frame, and angle bar frame is fixedly connected on the vertical facade, and the realization standpipe is fixedly connected with vertical facade.
Further, be connected through the hoop bolt between standpipe and the angle bar frame.
Preferably, the diameter of hoop bolt is 10mm.
Further, angle bar frame with vertically be fixedly connected through Screw arbor with nut at both-ends between the facade.
Preferably, the diameter of Screw arbor with nut at both-ends is 16mm.
Further, charging aperture is funnel-form.
Preferably, the angle of inclined tube and standpipe is 45 degree.
Preferably, the connecting portion of inclined tube and standpipe is apart from flooring absolute altitude 150mm.
Further, be welded to connect between inclined tube and the standpipe.
The utility model has following beneficial effect owing to adopted technique scheme:
Can solve the cleaning and the transportation of job site building waste effectively; Promote on-the-spot civilization markization and green construction level; Solve dustproof technical barrier in the on-the-spot rubbish transportation; Promote the raising of occupational health safety, environmental management and the comprehensive benefit of enterprise in charge of construction, the process of practical propelling green construction.This job site building waste conveying arrangement is solid and reliable, economic and practical, flexible, can in a plurality of engineerings, have enough to meet the need use, is convenient to enterprise in charge of construction and applies widely.The utility model is simple in structure, manufacturing is easy, cost is low, practical.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described further:
Fig. 1 is the structural representation of the utility model job site building waste conveying arrangement;
Fig. 2 is the syndeton vertical view of the utility model neutral tube and vertical facade.
The specific embodiment
As depicted in figs. 1 and 2; Be the utility model job site building waste conveying arrangement; Comprise that internal diameter is the standpipe 1 of 150mm, standpipe 1 is fixedly connected on the vertical facade of accomplishing 6 of constructing, and standpipe 1 is oblique to be outward extended with the inclined tube 2 that internal diameter is 150mm; Inclined tube 2 exceeds flooring absolute altitude 150mm with the connecting portion of standpipe 1, is welded to connect between inclined tube 2 and the standpipe 1.The length of inclined tube 2 is 340mm; Inclined tube 2 is 45 degree with the angle of standpipe 1, and the top of inclined tube 2 is a charging aperture 21, and charging aperture 21 is funnel-form; Use internal diameter to be welded into upper base as the steel plate of 3mm and be 381mm as the steel pipe of 150mm and thickness; Going to the bottom is 150mm, and height is the funnel-form charging aperture 21 of 200mm, one of every storey setting.Standpipe 1 is fixedly connected with angle bar frame 3; Be fixedly connected through hoop bolt 4 between standpipe 1 and the angle bar frame 3; Angle bar frame 3 adopts the equal leg angle welding of 50mm * 50mm to grow into 300mm, and height is 200mm, the screw of two 12mm of Xian in the middle part of the length of angle bar frame 3; Spacing is 160mm, adopts the hoop bolt 4 usefulness nuts of 10mm that standpipe 1 is fixing with angle bar frame 3.Angle bar frame 3 is fixedly connected on the vertical facade 6; Angle bar frame 3 with vertically be fixedly connected through Screw arbor with nut at both-ends 5 between the facade 6; The screw of two 18mm of Xian in the middle part of the height of angle bar frame 3; The Screw arbor with nut at both-ends 5 that adopts 16mm is with on the angle bar frame 3 and the vertical facade of accomplishing 6 of having constructed, and spacing is 90mm; Realization standpipe 1 is fixedly connected with vertical facade 6.During cleaning floor building waste, pour rubbish into funnel, rubbish is transported to the ground assigned address through funnel → inclined tube 2 → standpipe 1.
More than be merely the specific embodiment of the utility model, but the technical characterictic of the utility model is not limited thereto.Any is the basis with the utility model, for realizing essentially identical technique effect, has done the ground simple change, has been equal to replacement or modification etc., all is covered by among the protection domain of the utility model.

Claims (10)

1. job site building waste conveying arrangement; It is characterized in that: comprise standpipe (1); Said standpipe (1) is fixedly connected on the vertical facade of accomplishing (6) of constructing, the oblique inclined tube (2) that is outward extended with of said standpipe (1), and the top of said inclined tube (2) is charging aperture (21).
2. job site according to claim 1 building waste conveying arrangement; It is characterized in that: said standpipe (1) is fixedly connected with angle bar frame (3); Said angle bar frame (3) is fixedly connected on the vertical facade (6), and realization standpipe (1) is fixedly connected with vertical facade (6).
3. job site according to claim 2 building waste conveying arrangement is characterized in that: be fixedly connected through hoop bolt (4) between said standpipe (1) and the angle bar frame (3).
4. job site according to claim 3 building waste conveying arrangement is characterized in that: the diameter of said hoop bolt (4) is 10mm.
5. job site according to claim 2 building waste conveying arrangement is characterized in that: said angle bar frame (3) with vertically be fixedly connected through Screw arbor with nut at both-ends (5) between the facade (6).
6. job site according to claim 5 building waste conveying arrangement is characterized in that: the diameter of said Screw arbor with nut at both-ends (5) is 16mm.
7. job site according to claim 1 building waste conveying arrangement is characterized in that: said charging aperture (21) is funnel-form.
8. job site according to claim 1 building waste conveying arrangement is characterized in that: said inclined tube (2) is 45 degree with the angle of standpipe (1).
9. job site according to claim 1 building waste conveying arrangement is characterized in that: the connecting portion of said inclined tube (2) and standpipe (1) is apart from flooring absolute altitude 150mm.
10. job site according to claim 1 building waste conveying arrangement is characterized in that: be welded to connect between said inclined tube (2) and the standpipe (1).
CN2011204579161U 2011-11-17 2011-11-17 Construction site construction waste transporting device Expired - Fee Related CN202324636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204579161U CN202324636U (en) 2011-11-17 2011-11-17 Construction site construction waste transporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204579161U CN202324636U (en) 2011-11-17 2011-11-17 Construction site construction waste transporting device

Publications (1)

Publication Number Publication Date
CN202324636U true CN202324636U (en) 2012-07-11

Family

ID=46436616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204579161U Expired - Fee Related CN202324636U (en) 2011-11-17 2011-11-17 Construction site construction waste transporting device

Country Status (1)

Country Link
CN (1) CN202324636U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383602A (en) * 2011-11-17 2012-03-21 中天建设集团有限公司 Construction site construction waste transport device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383602A (en) * 2011-11-17 2012-03-21 中天建设集团有限公司 Construction site construction waste transport device

Similar Documents

Publication Publication Date Title
CN206233102U (en) A kind of packaged type faces side operation work platform
CN204979713U (en) Double -deck storage rack of precast floor plank
CN202441119U (en) Tool type retaining board foundation pit edge enclosure structure
CN202324636U (en) Construction site construction waste transporting device
CN202864274U (en) Belt material stopper
CN204040479U (en) Building waste clears device
CN203034808U (en) Amphibious pipe for floor garbage transportation and pump pipe cleaning
CN113565326A (en) Garbage recycling channel for building construction and using method thereof
CN206827417U (en) Can turnover type refuse collector
CN206158105U (en) Perpendicular transport corridor of high -rise building rubbish
CN102383602A (en) Construction site construction waste transport device
CN101733834B (en) Pipe pile spreader
CN102287193A (en) Special hanging scaffold for sleeve-building inner shaft wall in shaft sinking of vertical shaft
CN208131118U (en) A kind of storing unit stacked for building waste
CN204754177U (en) Detachable flier
CN202181898U (en) Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction
CN211949407U (en) Garbage channel for building construction
CN207245099U (en) The interim rubbish blanking system of Core Walls Structure
CN202483183U (en) Planar shock absorber for vertical mixture conveying pipeline
CN201942116U (en) Fixing and supporting device used for transporting precast concrete plank
CN203160513U (en) Floorboard
CN218466982U (en) Construction waste recovery system
CN206823976U (en) A kind of high-rise obsolete material vertically reclaims reducing mechanism
CN201942296U (en) Recovery device of cement clinker conveyor
CN204112687U (en) Packaged type steel bar meter operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121117