CN202323986U - Synchronous re-checking correction mold for strut anchor bolt - Google Patents

Synchronous re-checking correction mold for strut anchor bolt Download PDF

Info

Publication number
CN202323986U
CN202323986U CN2011204723374U CN201120472337U CN202323986U CN 202323986 U CN202323986 U CN 202323986U CN 2011204723374 U CN2011204723374 U CN 2011204723374U CN 201120472337 U CN201120472337 U CN 201120472337U CN 202323986 U CN202323986 U CN 202323986U
Authority
CN
China
Prior art keywords
module
anchor bolt
bolt
mold
synchronous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204723374U
Other languages
Chinese (zh)
Inventor
陈再红
曾力勇
吴昊
宋新南
曹希晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN2011204723374U priority Critical patent/CN202323986U/en
Application granted granted Critical
Publication of CN202323986U publication Critical patent/CN202323986U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a synchronous re-checking correction mold for a strut anchor bolt, and aims to provide the synchronous re-checking correction mold for the strut anchor bolt. The synchronous re-checking correction mold for the strut anchor bolt comprises a main mold plate, a locating mold plate and a fixed mold block and is characterized in that the main mold plate is provided with a concentric round hole corresponding to the anchor bolt; the locating mold plate is provided with a slot hole and a scale; the main mold plate, the locating mold plate and the fixed mold block are successively sheathed with the anchor bolt from bottom to top; the locating mold plate is positioned between the main mold plate and the fixed mold block; and the fixed mold block is in a two-semicircular spreadable mode. The synchronous re-checking correction mold for the strut anchor bolt is mainly used for re-checking and correcting the position of the strut anchor bolt.

Description

A kind of stanchion base bolt is checked Correction Die synchronously
Technical field
The utility model relates to a kind of mould, more particularly, relates to a kind of stanchion base bolt and checks Correction Die synchronously.
Background technology
Check for the stanchion base bolt at present; Correction work, traditional method are to measure the bolt distance or use one and the measure-alike template cover of pillar flange with invar tape, and the bolt that does not meet installation requirement for the position applies the external force correction; And the process of constantly duplicate measurements, correction; Reach the installation site requirement up to foundation bolt, this process efficiency is low, and is just poorer for the basic applicability that bolt quantity is many.
The structure that pillar uses flange to be connected with foundation bolt has been used very long a period of time; Often owing to the influence of each item technology in the process of basis making, pitch of bolts can produce deviation unavoidably, therefore; Pillar is installed in before basic the going up; Must check, carry out position correction, make it reach the installation site requirement for the foundation bolt that does not meet installation requirement.
The present every profession and trade basis of using, part bolt quantity reach more than 10 or are more, and the error requirements of relative spacing is below 1mm, and efficient is extremely low so conventional method seems, and effect is also unsatisfactory.
Summary of the invention:
The purpose of the utility model is to provide a kind of stanchion base bolt to check Correction Die synchronously, to solve the above-mentioned problem that exists.
For realizing above-mentioned purpose, the technical solution of the utility model is: a kind of stanchion base bolt is checked Correction Die synchronously, comprises master module, locating template and stuck-module; It is characterized in that: on the described master module 1; Have the concentric circle holes 8 corresponding, on the locating template 2, be provided with slotted hole 7 and scale 4 with foundation bolt 6; Master module 1, locating template 2 and stuck-module 3 successively from bottom to top with foundation bolt 6 sockets, locating template 2 is between master module 1 and stuck-module 3.
Described stuck-module 3 is two semicircles can deciliter shape.
The beneficial effect of the utility model is: 1. after mould is installed, can directly read the deviation data of foundation bolt through the scale on slotted hole limit on the locating template, be convenient to next step correction.2. during calibration bolt, can control the direction of the bolt application of force through the slotted hole of locating template.3. can watch the overall process of correction in real time, can not occur than positive direction not to or the problem of excessive correction.4. whole trimming process is once accomplished, and need not repeat to check, proofread and correct, and has solved the problem of conventional method inefficiency.
Description of drawings:
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the utility model master module, locating template, stuck-module structural representation.
Among the figure: 1---master module, 2---locating template, 3---stuck-module, 4-scale, 5---the basis.6---foundation bolt, 7---slotted hole, 8---circular hole.
The specific embodiment
Below in conjunction with accompanying drawing the utility model and the specific embodiment thereof are done further explain.Referring to accompanying drawing 1-2; The utility model comprises master module, locating template and stuck-module, it is characterized in that: on the described master module 1, have the concentric circle holes 8 corresponding with foundation bolt 6; On the locating template 2; Be provided with slotted hole 7 and scale 4, master module 1, locating template 2 and stuck-module 3 successively from bottom to top with foundation bolt 6 sockets, locating template 2 is between master module 1 and stuck-module 3.
Described stuck-module 3 is two semicircles can deciliter shape.
The utility model mould is made up of master module 1, locating template 2 and stuck-module 3; The quantity of the circular hole 8 that is provided with on the master module 1 should be equal to the quantity of foundation bolt 6; And circular hole is corresponding with bolt and concentric; The diameter of circular hole should be identical with the locating template lower diameter, makes locating template 2 can just pack in the circular hole and guarantee that it freely rotates; The diameter of slotted hole two ends semicircle should be slightly larger than the diameter of bolt and (generally be no more than 2mm on the locating template; To guarantee the requirement of alignment error ± 1mm); The scope that slotted hole length covers according to actual needs confirms that the slotted hole interposition is equipped with scale 4, is used to read the bolt deviation data.Stuck-module 3 is used for fixing bolt and locating template.Slotted hole 7 can arbitrarily rotate in master module 1, and this slotted hole can covering diameter be the scope of slotted hole length+both sides semicircle diameter in theory, and master module 1 is used to guarantee that the slotted hole center of locating template 2 overlaps with the foundation bolt center.
The operating sequence of the utility model is following:
1. master module 1 cover is pressed (laying) on foundation bolt 6;
2. locating template 2 is positioned on the foundation bolt 6, makes this bolt be positioned at the slotted hole 7 of locating template 2, on the scale 4 of this locating template, read the bolt deviate;
3. for the satisfactory bolt in installation site, install and fix module 3, bolt and locating template are fixed;
4. for the undesirable bolt in installation site, the stuck-module of semicircle is installed, along the direction of slotted hole (major axis to) bolt is applied external force, its mounted stuck-module of fitting is got final product, the stuck-module of another semicircle is installed then;
5. when treating that all foundation bolts all are positioned at the center of locating module 2 slotted holes, the stuck-module of two semicircles of packing into explains that all bolt positions all reach installation requirement.

Claims (2)

1. a stanchion base bolt is checked Correction Die synchronously; Comprise master module, locating template and stuck-module, it is characterized in that: on the described master module (1), have the concentric circle holes (8) corresponding with foundation bolt (6); On the locating template (2); Be provided with slotted hole (7) and scale (4), master module (1), locating template (2) and stuck-module (3) successively from bottom to top with foundation bolt (6) socket, locating template (2) is positioned between master module (1) and the stuck-module (3).
2. by the described mould of claim 1, it is characterized in that described stuck-module (3) is two semicircles can deciliter shape.
CN2011204723374U 2011-11-17 2011-11-17 Synchronous re-checking correction mold for strut anchor bolt Expired - Lifetime CN202323986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204723374U CN202323986U (en) 2011-11-17 2011-11-17 Synchronous re-checking correction mold for strut anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204723374U CN202323986U (en) 2011-11-17 2011-11-17 Synchronous re-checking correction mold for strut anchor bolt

Publications (1)

Publication Number Publication Date
CN202323986U true CN202323986U (en) 2012-07-11

Family

ID=46435969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204723374U Expired - Lifetime CN202323986U (en) 2011-11-17 2011-11-17 Synchronous re-checking correction mold for strut anchor bolt

Country Status (1)

Country Link
CN (1) CN202323986U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold
CN104314100A (en) * 2014-11-24 2015-01-28 广西壮族自治区冶金建设公司 Construction method for installing steel column at a time through reserved hole mold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold
CN104314100A (en) * 2014-11-24 2015-01-28 广西壮族自治区冶金建设公司 Construction method for installing steel column at a time through reserved hole mold

Similar Documents

Publication Publication Date Title
CN106207370B (en) A kind of reflector antenna adjustment positioning device and method
CN202323986U (en) Synchronous re-checking correction mold for strut anchor bolt
CN202364531U (en) Component pin adjusting device
CN203792244U (en) Novel glass fiber-reinforced plastic vane web combined tool
CN206278631U (en) A kind of positioning and transmitting device
CN105587128A (en) Special fixture for mounting wallboard with heat insulation structure and mounting method for first-layer wallboard with heat insulation structure
CN202117170U (en) Support structure capable of sliding freely
CN102903773B (en) Solar photovoltaic assembly mounting system
CN202783216U (en) Mounting beam structure of kitchen top plate and equipment of high speed electric multiple unit
CN201635936U (en) Internal flange reinforcing device of wind-driven generator tower
CN202591859U (en) Flange plate splicing operating platform
CN202594597U (en) Positioning device of inclined handrail supports of moving pavement
CN202639707U (en) Welding fixture for assembly of C-shaped beam
CN205753733U (en) A kind of blower fan and the fixing device of air curtain motor
CN202155676U (en) Positioning die for installing bent pipe on powder concentrator
CN205194667U (en) Chip former
CN204471230U (en) A kind of elevator door head installs auxiliary fixture
CN203390772U (en) Positioning clamp for semi-arc-surface end cover
CN108386303B (en) A kind of energy by ocean current generating set root of blade connector and attaching method thereof
CN202363502U (en) Photovoltaic cell integrated with fixed grating
CN205451807U (en) Stepped ramp type copper bar and stepped ramp type copper bar verifying attachment
CN203086904U (en) Display device fixing device
CN202922154U (en) Correcting device for hub hole groove
CN202944964U (en) Adjusting and fixing device of external elevator for wind tower barrel
CN204590319U (en) Precast shear wall secured adjusted bar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120711