CN202323762U - Ink marker for bridge construction - Google Patents

Ink marker for bridge construction Download PDF

Info

Publication number
CN202323762U
CN202323762U CN2011204873348U CN201120487334U CN202323762U CN 202323762 U CN202323762 U CN 202323762U CN 2011204873348 U CN2011204873348 U CN 2011204873348U CN 201120487334 U CN201120487334 U CN 201120487334U CN 202323762 U CN202323762 U CN 202323762U
Authority
CN
China
Prior art keywords
ink
ink fountain
bridge
cartridge
line wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204873348U
Other languages
Chinese (zh)
Inventor
谭强
曾维亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Original Assignee
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd filed Critical CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority to CN2011204873348U priority Critical patent/CN202323762U/en
Application granted granted Critical
Publication of CN202323762U publication Critical patent/CN202323762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an ink marker for bridge construction, which comprises an ink marker body. An ink chamber is reserved in the ink marker body. A reel capable of rotating in the ink chamber is disposed in the ink chamber. A thread is wound on the reel. The ink marker is small in size, low in manufacturing cost and portable. Ink in the ink maker can be used for marking lines effectively. The ink marker is long in storage time and convenient for checking and enables constructors to construct according to marks so as to avoid construction errors, and accordingly construction period is shortened and construction quality of bridges is improved.

Description

The ink fountain that is used for bridge construction process
Technical field
The utility model relates to a kind of ink fountain, especially relates to a kind of ink fountain that is used for bridge construction process, is used for the line marker at work progress.
Background technology
Human at protohistory age, cross over water channel and valley, be the trees that utilize nature to fall down, the stone beam or the stone arch that form naturally, the stone that the mountain stream is outstanding, the Chinese wistaria of paddy bank growth etc.The mankind on purpose lumber to bridge or enrockment, frame stone are when bridge starts from, and have been difficult to textual criticism.According to the historical data record, beam bridge and pontoon bridge have been had in the Zhou Dynasty (B.C. 11st century~preceding 256 years) in China, and as B.C. about 1134, the Western Zhou Dynasty, the water frame had pontoon bridge in Weihe.Ancient babylonia is at the B.C. wooden bridge of building multispan in 1800, and bridge reaches 183 meters.Ancient Roman built the wooden bridge of crossing over the Tiber at B.C. 621 years, erected the pontoon bridge of crossing over these other straits of haler at B.C. 481 years.Mesopotamia area was built up when B.C. 4th century and was chosen stone arch bridge (soffit is a step) ancient times.Ancient times, bridge was before the 17th century, generally was to build with wood, stone material, and was divided into stone bridge and wooden bridge to bridge by the bridge construction material.
18th century iron production and casting, for bridge provides new construction material.But the cast iron shock resistance is poor, and tensile property is also low, and easy fracture is not good bridging material.After the fifties in 19th century, along with the development of acid converter steel-making and open hearth steel-smelting technology, steel become important bridging material.The tensile strength of steel is big, and shock resistance is good, the seventies in 19th century especially occurs steel plate and the rolling section steel of rectangle, in factory, assembles the condition of having created for the parts of bridge, and it is increasingly extensive that steel are used.18 beginnings of the century, invented the cement that forms with lime, clay, bloodstone mixed calcining.The fifties in 19th century, begin to be employed in and place reinforcing bar in the concrete to remedy the shortcoming of cement tensile property difference.After this, built up reinforced concrete bridge the seventies in 19th century.
Modern age, bridge construction promoted the rise and the development of bridge scientific theory.1857 by Sheng Wonan on the basis of theory, statics and mechanics of materials research of forefathers to arch, proposed more complete beam theory and reversed theory.This, theory of continuous beam and semi girder was also set up in period.Bridge truss is analyzed (like the analytical method of Warren girder and Howe truss) and also is resolved.The seventies in 19th century, structural mechanics obtained very big development, can analyze the stress that each member of bridge takes place under load action after people's such as German K. Coleman, British W.J.M. Rankine and J.C. Maxwell effort.The development that these are theoretical has promoted the development of truss, continuous beam and semi girder.In 19 end of the centurys, elastic arch theory is more perfect, has promoted the arch bridge development.The twenties in 20th century soil mechanics rise, promoted the theoretical research of bridge foundation.
In the work progress of bridge, at the predefined circuit of mark, traditional mode is to adopt chalk to make marks, but chalk rain or artificial factor under, wiped out easily, inconvenient constructor checks, influences work progress.
The utility model content
The purpose of the utility model is to overcome the shortcoming and defect of above-mentioned prior art, and a kind of ink fountain that is used for bridge construction process is provided, and this ink fountain volume is little, low cost of manufacture; Be easy to carry, the mark to circuit of the middle prepared Chinese ink through ink fountain, effective; Holding time is long, checks conveniently, makes the constructor to construct according to mark; Avoid occurring the construction mistake, shortened the duration, improved the construction quality of bridge.
The purpose of the utility model realizes through following technical proposals: the ink fountain that is used for bridge construction process; Comprise the ink fountain body; Be provided with cartridge in the said ink fountain body, be provided with the line wheel that can in cartridge, rotate in the said cartridge, be wound with silk thread on the said line wheel.
Said ink fountain body is provided with the through hole that communicates with cartridge, and said silk thread passes through hole.
The outer wall of said ink fountain body is provided with turning handle, and said turning handle is connected with the line wheel.
The sidewall of said cartridge is provided with through hole, and said line wheel two ends are arranged in the through hole, and wherein an end is connected with turning handle.
The two ends of said line wheel are provided with block plate, and the size of said block plate is greater than the size of line wheel, and block plate is arranged on cartridge inside.
In sum, the beneficial effect of the utility model is: this ink fountain volume is little, low cost of manufacture; Be easy to carry, the mark to circuit of the middle prepared Chinese ink through ink fountain, effective; Holding time is long, checks conveniently, makes the constructor to construct according to mark; Avoid occurring the construction mistake, shortened the duration, improved the construction quality of bridge.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Mark and corresponding component title in the accompanying drawing: 1-ink fountain body; 2-cartridge; 3-silk thread; 4-block plate; 5-line wheel; 6-turning handle; 7-through hole.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is done further to specify, but the embodiment of the utility model is not limited only to this.
Embodiment:
As shown in Figure 1, be used for the ink fountain of bridge construction process, comprise ink fountain body 1, be provided with cartridge 2 in the said ink fountain body 1, be provided with the line wheel 5 that can in cartridge 2, rotate in the said cartridge 2, be wound with silk thread 3 on the said line wheel 5.Splendid attire prepared Chinese ink in the cartridge 2, when line wheel 5 rotated in cartridge 2, twining online the wheel on 5 was that silk thread 3 just is stained with prepared Chinese ink, uses silk thread 3 is pulled out along through hole, the spy silk thread gently in the place that needs mark just is marked at this place with prepared Chinese ink.
Said ink fountain body 1 is provided with the through hole 7 that communicates with cartridge 2, and said silk thread 3 passes through hole 7.Silk thread 3 one ends that moisten behind the China ink are fixed, and pull out silk thread 3 and lead vertical pulling tightly in the position of needs, mention under the bullet of stage casing to get final product again.
The outer wall of said ink fountain body 1 is provided with turning handle 6, and said turning handle 6 is connected with line wheel 3.Through shaking turning handle 6, drive the rotation of line wheel 5, can realize collecting apace to silk thread 3.The fine rule that silk thread 3 is generally made with silk also can be used cotton thread, is characterized in, can keep the prepared Chinese ink of some during its process cartridge 2.
The sidewall of said cartridge 2 is provided with through hole, and said line is taken turns 5 two ends and is arranged in the through hole, and wherein an end is connected with turning handle 6.
The two ends of said line wheel 5 are provided with block plate 4, and the size of said block plate 4 is greater than the size of line wheel 5, and block plate 4 is arranged on cartridge 2 inside.Block plate 4 is set can prevents silk thread 3 landing from the line wheel 5, in cartridge 2 around knot.
Ink fountain has three effects: one, do long straight line, method is that silk thread 3 one ends that moisten behind the China ink are fixed, and pulls out silk thread 3 and leads vertical pulling tightly in the position of needs, mentions under the bullet of stage casing to get final product again.Two, cartridge 2 holds China ink, cooperates China ink to sign and turn chi in order to draw short lines or to mark; Three, draw vertical curve (when plummet uses).
Generally be furnished with China ink in the ink fountain and sign, it is the paintbrush made from bamboo chip that China ink is signed, and the broom shape is made in its lower end; With its line ball (making silk thread 3 moisten China ink), work as pen when drawing short lines or mark and use when playing straight line.
Take aforesaid way, just can realize the utility model preferably.

Claims (5)

1. the ink fountain that is used for bridge construction process; It is characterized in that: comprise ink fountain body (1); Be provided with cartridge (2) in the said ink fountain body (1), be provided with the line wheel (5) that can in cartridge (2), rotate in the said cartridge (2), be wound with silk thread (3) on the said line wheel (5).
2. the ink fountain that is used for bridge construction process as claimed in claim 1 is characterized in that: said ink fountain body (1) is provided with the through hole (7) that communicates with cartridge (2), and said silk thread (3) passes through hole (7).
3. the ink fountain that is used for bridge construction process as claimed in claim 1 is characterized in that: the outer wall of said ink fountain body (1) is provided with turning handle (6), and said turning handle (6) is connected with line wheel (5).
4. the ink fountain that is used for bridge construction process as claimed in claim 3 is characterized in that: the sidewall of said cartridge (2) is provided with through hole, and said line wheel (5) two ends are arranged in the through hole, and wherein an end is connected with turning handle (6).
5. the ink fountain that is used for bridge construction process as claimed in claim 1; It is characterized in that: the two ends of said line wheel (5) are provided with block plate (4); The size of said block plate (4) is greater than the size of line wheel (5), and block plate (4) is arranged on cartridge (2) inside.
CN2011204873348U 2011-11-30 2011-11-30 Ink marker for bridge construction Expired - Fee Related CN202323762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204873348U CN202323762U (en) 2011-11-30 2011-11-30 Ink marker for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204873348U CN202323762U (en) 2011-11-30 2011-11-30 Ink marker for bridge construction

Publications (1)

Publication Number Publication Date
CN202323762U true CN202323762U (en) 2012-07-11

Family

ID=46435746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204873348U Expired - Fee Related CN202323762U (en) 2011-11-30 2011-11-30 Ink marker for bridge construction

Country Status (1)

Country Link
CN (1) CN202323762U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276660A (en) * 2013-05-15 2013-09-04 朱劲荣 Bidirectional reciprocating pulling-type scriber for screw adjustment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276660A (en) * 2013-05-15 2013-09-04 朱劲荣 Bidirectional reciprocating pulling-type scriber for screw adjustment
CN103276660B (en) * 2013-05-15 2015-06-24 朱劲荣 Bidirectional reciprocating pulling-type scriber for screw adjustment

Similar Documents

Publication Publication Date Title
CN202323762U (en) Ink marker for bridge construction
CN101696589A (en) Novel combined stone beam
CN202316866U (en) Cutting machine for steel bars in bridge construction process
CN204255361U (en) Building operation line falls
CN201198624Y (en) Bent component of embedded type composite stone structure
CN202323756U (en) Hollow grouting anchor rod used in bridge construction process
CN201507067U (en) Novel combined stone beam
CN209277004U (en) The hyperbola abnormal shape pier steel form of speed of application can be improved
CN202323680U (en) Device used for fixedly connecting steel column
CN205861061U (en) A kind of construction dip stick
CN206220559U (en) A kind of use fiber cloth carries out the pin of prestressed reinforcement
CN209277331U (en) A kind of green cob brick wall with porous brick
CN202323758U (en) Movable supporting frame in construction process of bridge
CN202323681U (en) Shear force piece used during bridge construction
CN204609429U (en) A kind of for the windproof electric pole of power system
CN206514741U (en) A kind of direct-reading slab thickness measuring scale
CN208173220U (en) It is a kind of convenient for fixed Plectra on finger for playing zheng
CN202323755U (en) Multi-functional supporting device used in construction process of bridge
CN207469788U (en) Benchmark crossbeam of the wall-building machine with scale
CN202323653U (en) Pavement tamper for bridge construction process
CN202323765U (en) Device for tightly screwing steel wires in bridge construction
CN209225215U (en) A kind of template transfer device of real estate project construction
CN205501792U (en) Continuous steel purlin of third -class bridging of high -speed railway sliding roadway arch
CN202323947U (en) Anchor rod piling structure used for bridge construction
CN202227338U (en) Template device for casting pile heads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121130