CN202309981U - 3G and distributed storage monitoring system of construction site - Google Patents

3G and distributed storage monitoring system of construction site Download PDF

Info

Publication number
CN202309981U
CN202309981U CN 201120429988 CN201120429988U CN202309981U CN 202309981 U CN202309981 U CN 202309981U CN 201120429988 CN201120429988 CN 201120429988 CN 201120429988 U CN201120429988 U CN 201120429988U CN 202309981 U CN202309981 U CN 202309981U
Authority
CN
China
Prior art keywords
construction site
signal
wireless
distributed storage
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120429988
Other languages
Chinese (zh)
Inventor
喻皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang College of Construction
Original Assignee
Zhejiang College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang College of Construction filed Critical Zhejiang College of Construction
Priority to CN 201120429988 priority Critical patent/CN202309981U/en
Application granted granted Critical
Publication of CN202309981U publication Critical patent/CN202309981U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Closed-Circuit Television Systems (AREA)

Abstract

The utility model relates to a 3G and distributed storage monitoring system of a construction site. The 3G and distributed storage monitoring system of the construction site includes digital cameras. Each of the digital cameras is connected to a signal emission wireless access point. One or more signal emission wireless access points connect with a signal receiving wireless access point through wireless transmission. The signal receiving wireless access point connects with a wireless switchboard. The switchboard connects with one or more storage servers, a monitoring center and a video server respectively. The 3G and distributed storage monitoring system of the construction site in the utility model has beneficial effects. Since signals transmitted by the cameras are digital cameras, the signal loss is little in a transmission process. Since the signals of the cameras are transmitted by adopting wireless technology, the selection of locations of the cameras does not need to consider too much about the wire arrangement. After the signals are transmitted to the wireless switchboard, the signals are distributed to the storage servers respectively through network. Thus, image data is not easy to damage.

Description

The construction site supervisory control system of a kind of 3G and distributed storage
Technical field
The utility model relates to a kind of construction site supervisory control system, especially a kind of construction site supervisory control system of utilizing wireless 3G and network distribution type memory technology.
Background technology
The camera that existing monitoring technique video section uses is the simulation camera, and the transmission line of use also is wired analog line, and store video content is also used special-purpose storage hard disk.In the construction site, carry out video acquisition because of using the simulation camera, it is unfavorable that the post-digital of image is handled; Because of transmission line is a Wireline, putting of camera receives very big influence again, and what in transmission line, transmit is analog signal; If camera and control point hypertelorism, then the loss of signal is very big, can cause image blurring unclear; Video storage is point-to-point the storage; Do not carry out redundancy backup, if the storage hard disk is if damage may cause losing of video data.
Summary of the invention
The utility model will solve the shortcoming of above-mentioned prior art, and not loss of a kind of image transmission is provided, and that camera is put is not affected by environment, information stores is preserved the construction site supervisory control system of 3G and distributed storage preferably.
The utility model solves the technical scheme that its technical problem adopts: the construction site supervisory control system of this 3G and distributed storage; Comprise digital camera; Each digital camera is connected with a signal emission WAP; One or more signal emission WAPs are connected with same signal through wireless transmission and receive WAP, and signal receives WAP and is connected with wireless exchange board, and wireless exchange board is connected with one or more storage servers, Surveillance center and video server respectively.
As preferably, video server is connected with 3G mobile.
The effect that utility model is useful is: what camera transmitted is digital signal; So loss is less in the process of transmission, it is clear that picture still can keep after long Distance Transmission, and the signal of camera transmits through wireless technology; So the place of camera setting does not need the problem of too much consideration wiring; Directly manage each WAP MP by wireless exchange board MX, the wireless transmission management is very easy to, safeguard simple.Signal passes to behind the wireless exchange board one the tunnel can issue a plurality of storage servers respectively through network; Make view data be difficult for being destroyed; Another road signal can directly pass to Surveillance center, supplies staff's real time inspection, and the leader can visit special video server through 3G mobile and see on-the-spot scene.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Description of reference numerals: digital camera 1, signal emission WAP 2, signal receives WAP 3, wireless exchange board 4, video server 5, storage server 6, Surveillance center 7,3G mobile 8.
Embodiment
Below in conjunction with accompanying drawing the utility model is described further:
Embodiment: like Fig. 1; The construction site supervisory control system of this 3G and distributed storage; Comprise digital camera 1; Each digital camera 1 is connected with a signal emission WAP 2, and one or more signal emission WAPs 2 are connected with same signal through wireless transmission and receive WAP 3, and signal receives WAP 3 and is connected with wireless exchange board 4; Wireless exchange board 4 is connected with one or more storage server 6, Surveillance center 7 and video server 5 respectively, and video server 5 is connected with 3G mobile 8 or other network intelligence equipment.
During work; Digital camera 1 sends to signal emission WAP 2 after the image that collects is become digital signal; By signal emission WAP 2 it is become wireless signal again and send to signal reception WAP 3; Signal receives WAP 3 and again wireless signal is become digital electric signal and pass to wireless exchange board 4, and wireless exchange board 4 is issued a plurality of storage servers 6 on network after receiving signal, Surveillance center 7 and video server 5; Administrative staff can see realtime graphic in Surveillance center 7, also can receive the building site realtime graphic through 3G mobile 8 or other network intelligence equipment.
Except that the foregoing description, the utility model can also have other execution modes.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection range of the utility model requirement.

Claims (2)

1. the construction site supervisory control system of 3G and distributed storage; Comprise digital camera (1); It is characterized in that: each digital camera (1) is connected with a signal emission WAP (2); One or more signal emission WAPs (2) are connected with same signal through wireless transmission and receive WAP (3); Signal receives WAP (3) and is connected with wireless exchange board (4), and wireless exchange board (4) is connected with one or more storage servers (6), Surveillance center (7) and video server (5) respectively.
2. the construction site supervisory control system of 3G according to claim 1 and distributed storage is characterized in that: video server (5) is connected with 3G mobile (8).
CN 201120429988 2011-11-03 2011-11-03 3G and distributed storage monitoring system of construction site Expired - Fee Related CN202309981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120429988 CN202309981U (en) 2011-11-03 2011-11-03 3G and distributed storage monitoring system of construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120429988 CN202309981U (en) 2011-11-03 2011-11-03 3G and distributed storage monitoring system of construction site

Publications (1)

Publication Number Publication Date
CN202309981U true CN202309981U (en) 2012-07-04

Family

ID=46378788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120429988 Expired - Fee Related CN202309981U (en) 2011-11-03 2011-11-03 3G and distributed storage monitoring system of construction site

Country Status (1)

Country Link
CN (1) CN202309981U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103108167A (en) * 2013-02-26 2013-05-15 深圳市高斯贝尔家居智能电子有限公司 Method for camera connecting to local wireless network and monitoring method of wireless network
CN103327301A (en) * 2013-06-06 2013-09-25 四川艾普视达数码科技有限公司 Monitoring system used in construction sites
CN103365962A (en) * 2013-06-19 2013-10-23 山东润谱通信工程有限公司 Building and calibrating method for construction material wireless propagation loss parameter database

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103108167A (en) * 2013-02-26 2013-05-15 深圳市高斯贝尔家居智能电子有限公司 Method for camera connecting to local wireless network and monitoring method of wireless network
CN103327301A (en) * 2013-06-06 2013-09-25 四川艾普视达数码科技有限公司 Monitoring system used in construction sites
CN103365962A (en) * 2013-06-19 2013-10-23 山东润谱通信工程有限公司 Building and calibrating method for construction material wireless propagation loss parameter database

Similar Documents

Publication Publication Date Title
CN202085266U (en) Digital video monitoring system
CN202261389U (en) Power transmission line operation and maintenance routing inspection management information system
CN105447766A (en) Three-dimensional power-grid weather-information panoramic display method based on GIS and system thereof
CN204119396U (en) The large online data monitor and early warning system of a kind of power transmission network
CN202309981U (en) 3G and distributed storage monitoring system of construction site
CN101986704B (en) Monitoring system
CN102404559A (en) Video monitoring system and method
CN105554458A (en) Method for implementing intelligent child custody and child behavior pattern analysis system
CN109038813A (en) Power transmission line intelligent managing and control system
CN202663505U (en) Intelligent traffic video collecting and monitoring system based on third generation (3G) network transmission
CN105469324A (en) Data acquisition and entering and operation and maintenance management system and data entering method of power distribution network
CN205071221U (en) Wearable job site situation record appearance
CN105323555A (en) Wearable recorder for recording construction site conditions
CN103702070A (en) Corridor pattern monitoring method based on digital monitoring platform system
CN103093579B (en) Debris flow or landslide alarm system based on videos
CN202663506U (en) Panoramic visualization system of transformer substation
CN207968074U (en) A kind of self-powered electric transmission line channel visualization cruising inspection system
CN110933369A (en) Security monitoring system based on wireless communication network
CN110232643A (en) A kind of full life monitoring device and method of building castoff
CN108134793A (en) A kind of encrypted 4G Active Eyes
CN105635647A (en) Monitoring system
CN204856817U (en) Bridge limit for height protection frame real time monitoring and alarm system
CN205320196U (en) Long -range centralized, all -round monitor control system
CN103780878A (en) Portable monitoring equipment
CN203554599U (en) Network camera collecting-distributing redundancy storage system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20141103

EXPY Termination of patent right or utility model