CN202309212U - Power dispatching integration early warning control system - Google Patents
Power dispatching integration early warning control system Download PDFInfo
- Publication number
- CN202309212U CN202309212U CN 201120227686 CN201120227686U CN202309212U CN 202309212 U CN202309212 U CN 202309212U CN 201120227686 CN201120227686 CN 201120227686 CN 201120227686 U CN201120227686 U CN 201120227686U CN 202309212 U CN202309212 U CN 202309212U
- Authority
- CN
- China
- Prior art keywords
- center
- data
- model
- data center
- management maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Provided is a power dispatching integration early warning control system, comprising a management maintenance tool, a logic analysis center, and a foreground application, wherein the management maintenance tool comprises a data center used for storing real-time database information of a power grid application system, a model center used for completing the description of the properties of the power grid device, and a figure center used for obtaining figure interfaces from every application system to convert into vector graphic mode and transmitting the vector graphics into the data center for storage; and the logic analysis center is used for obtaining various types of data and figures from the data center; making analysis and logic verification according to a predetermined model and outputting the data required by business analysis to the foreground application.
Description
Technical field
The utility model belongs to power domain, relates in particular to a kind of dispatching of power netwoks comprehensive pre-warning control system.
Background technology
Dispatching of power netwoks is the core of operation of power networks and accident treatment, is related to safe, the stable and economic operation of electrical network.
At present, the construction of power network schedule automation has obtained significant progress, and sorts of systems such as dispatch automated system, distribution management system, production management system come into operation in succession.The dispatcher needs to pay close attention to different information, for example information such as SCADA data, power network wiring information, scheduling rule, facility information, protection configuration information and production procedure in the day-to-day operation of electrical network and accident treatment process.These information often come from the different systems or the disparate modules of same system.This information gathering and management from decentralized system restricted fast, efficient, stable and make a strategic decision reliably and command.And in management and running and accident treatment processing procedure, need the operator to check a plurality of systems, and consult numerous data, wherein also may receive the adverse effect of subjective consciousness.
The utility model content
In view of this, the purpose of the utility model is to provide a kind of dispatching of power netwoks comprehensive pre-warning control system, can concentrate and carry out dispatching of power netwoks.
For realizing above-mentioned purpose; An embodiment of the utility model provides a kind of dispatching of power netwoks comprehensive pre-warning control system; Comprise management maintenance instrument, logic analysis center and foreground application, said management maintenance instrument comprises data center, model center, centre of figure;
Said data center is used to store the real time data library information of electrical network application system;
Said model center is used to accomplish the complete description to whole attributes of grid equipment;
Said picture centre is used for obtaining graphical interfaces from each application system, and converts vector graphics format to, imports in the data center and stores;
Said logic analysis center is used for obtaining Various types of data and figure from said data center, analyzes and logic verify according to predetermined model, and outgoing traffic is analyzed required data to foreground application.
Preferably, also comprise note transmission platform, be used for sending the note that comprises the business diagnosis data to the external world.
Preferably, the real-time data base information of said data center storage comprises the database that comes from PSMS system, Pi database and SCADA system.
Preferably, said management maintenance instrument also has external interface.
Preferably, said model center specifically be used to obtain and integrate various application systems about electrical network once with all descriptors of electrical secondary system model, thereby accomplish complete description to whole attributes of grid equipment.
Preferably, said vector graphics format is the SVG graphical format.
According to the utility model embodiment, all required in management and running and accident treatment process system datas are carried out unified management, stop the possibility that sporadic factor causes electric network fault to take place.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the Organization Chart of the dispatching of power netwoks comprehensive pre-warning control system that provides of the utility model embodiment;
Fig. 2 is the real network Organization Chart that system relied in the utility model.
Embodiment
For the purpose, technical scheme and the advantage that make the utility model embodiment clearer; To combine the accompanying drawing among the utility model embodiment below; Technical scheme among the utility model embodiment is carried out clear, intactly description; Obviously, described embodiment is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 shows the Organization Chart of the dispatching of power netwoks comprehensive pre-warning control system that the utility model embodiment provides.This system is total comprises management maintenance instrument 101, logic analysis center 102 and foreground application 103.Management maintenance instrument 101 comprises data center 1011, model center 1012 and centre of figure 1013.
Above-mentioned vector graphics format can be the SVG graphical format.
Here the model of analyzing can be with reference to operation rules, principle and the business need of electrical network.
System architecture can adopt the SOA software architecture in the present embodiment, to improve the flexibility of operation flow.
System in the utility model is that dispatching of power netwoks provides the intelligent decision support.In addition, this system can also merge functions such as graphics management, dangerous spot prediction, facility information, electric network information, management system, operation rule, electrical network figure, production procedure and anti-accident maneuver, electronics be on duty, improves dispatch environment.
System in the utility model carries out unified management with all required in management and running and accident treatment process system datas, stops the possibility that sporadic factor causes electric network fault to take place.
Fig. 2 shows the real network Organization Chart that system relied in the utility model.As shown in Figure 2, be provided with equipment such as intelligent scheduling Platform Server through the backbone network communication, scheduling value machine.Wherein server need dispose two 100M network interfaces, considers the ease for operation of the processing speed of server simultaneously, can select performance Windows server preferably.Department server is deployed in safe II district, is the non-control production area that Da Qu is produced in control.
Need to prove that in order to make the responsible person in time know important information, the system in the utility model can also be provided with note and send platform, be used for sending the note that comprises the business diagnosis data to the corresponding personnel in the external world.
The above only is the preferred implementation of the utility model; Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model principle; Can also make some improvement and retouching, these improvement and retouching also should be regarded as the protection range of the utility model.
Claims (3)
1. a dispatching of power netwoks comprehensive pre-warning control system is characterized in that, comprises management maintenance instrument, logic analysis center and foreground application, and said management maintenance instrument comprises data center, model center, centre of figure;
Said data center is used to store the real time data library information of electrical network application system;
Said model center is used to accomplish the complete description to whole attributes of grid equipment;
Said picture centre is used for obtaining graphical interfaces from each application system, and converts vector graphics format to, imports in the data center and stores;
Said logic analysis center is used for obtaining Various types of data and figure from said data center, analyzes and logic verify according to predetermined model, and outgoing traffic is analyzed required data to foreground application.
2. system according to claim 1 is characterized in that, also comprises note transmission platform, is used for sending the note that comprises the business diagnosis data to the external world.
3. system according to claim 1 is characterized in that, said management maintenance instrument also has external interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120227686 CN202309212U (en) | 2011-06-24 | 2011-06-24 | Power dispatching integration early warning control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120227686 CN202309212U (en) | 2011-06-24 | 2011-06-24 | Power dispatching integration early warning control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202309212U true CN202309212U (en) | 2012-07-04 |
Family
ID=46378025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120227686 Expired - Lifetime CN202309212U (en) | 2011-06-24 | 2011-06-24 | Power dispatching integration early warning control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202309212U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104852473A (en) * | 2015-06-01 | 2015-08-19 | 国网上海市电力公司 | Monitoring method based on transformer station digital model |
-
2011
- 2011-06-24 CN CN 201120227686 patent/CN202309212U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104852473A (en) * | 2015-06-01 | 2015-08-19 | 国网上海市电力公司 | Monitoring method based on transformer station digital model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2546320C2 (en) | Intelligent network | |
CN106026405B (en) | Relay protection in-service monitoring based on EMS system and analysis system | |
CN111131480A (en) | Cloud edge cooperative service system for smart power plant | |
CN201608541U (en) | Solar-energy photovoltaic intelligent power station based on Ethernet | |
CN102289727A (en) | Comprehensive early-warning control system for grid scheduling | |
CN110020967A (en) | The information processing method and device of a kind of dispatching of power netwoks end substation intelligent alarm | |
CN107171293A (en) | The system and method for relay protection O&M information multidimensional issue is realized in intelligent grid | |
CN102324788A (en) | Power dispatching integrated anti-misoperation simulation comprehensive management platform | |
CN112765258A (en) | Power distribution network graph model checking management system and method thereof | |
CN107958019A (en) | Graphical application process based on Regulation system | |
CN103700210A (en) | Web GIS (geographical information system)-based comprehensive alarm display method | |
CN108520163A (en) | Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures | |
CN109214639A (en) | Operation scheduling on transmission net of electric power intelligent generation method and equipment | |
CN102571436A (en) | Comprehensive monitoring device for SNMP (Simple Network Management Protocol) and management method thereof | |
CN111327468A (en) | Operation method and system for edge computing platform of power system | |
CN110276516A (en) | Distribution monitoring analysis and repairing command methods based on power grid GIS | |
CN109934730A (en) | A kind of real-time control analysis system of visualization | |
CN106789194B (en) | The energy communication service automatic fault diagnosis localization method of multi-disciplinary collaboration | |
CN106530112A (en) | Distribution management system | |
CN110322112A (en) | A kind of electrical network parameter management method and system based on smart grid | |
CN202309212U (en) | Power dispatching integration early warning control system | |
CN104377831A (en) | Intelligent substation automatic monitoring system and implementation method | |
CN103279110B (en) | A kind of inspection control device of locomotive stand-by motor overhaul of the equipments line | |
CN104484831A (en) | Graph dispatching operation order system and generation method for distribution network operation order graphs in graph dispatching operation order system | |
CN104333131A (en) | Method for establishing prefecture and county power grid regulation data integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120704 |