CN202303790U - Air collecting pipe component and air-conditioner system thereof - Google Patents

Air collecting pipe component and air-conditioner system thereof Download PDF

Info

Publication number
CN202303790U
CN202303790U CN2011203801380U CN201120380138U CN202303790U CN 202303790 U CN202303790 U CN 202303790U CN 2011203801380 U CN2011203801380 U CN 2011203801380U CN 201120380138 U CN201120380138 U CN 201120380138U CN 202303790 U CN202303790 U CN 202303790U
Authority
CN
China
Prior art keywords
collecting pipe
discharge
air
main discharge
air collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203801380U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang four link electromechanical Co., Ltd.
Original Assignee
Zhejiang Sanhua Refrigeration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sanhua Refrigeration Group Co Ltd filed Critical Zhejiang Sanhua Refrigeration Group Co Ltd
Priority to CN2011203801380U priority Critical patent/CN202303790U/en
Application granted granted Critical
Publication of CN202303790U publication Critical patent/CN202303790U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model relates to an air collecting pipe component, an assembling method thereof and an air-conditioner system using the air collecting pipe component. The air collecting pipe component comprises a main air collecting pipe (1), a plurality of branch pipes (2) communicated with the main air collecting pipe (1), and an extraction tube (3) and a plug (4) which are respectively soldered on the main air collecting pipe (1). The air collecting pipe component is characterized in that the plug (4) is soldered at the end part of the main air collecting pipe (1), and matched with the inner wall of the main air collecting pipe (1). The air collecting pipe component provided by the utility model has reliable air tightness and simplified process, does not require acid pickling, is suitable for environment-friendly requirement, and is particularly suitable for large air conditioning equipment, such as a commercial air conditioner.

Description

A kind of discharge assembly and air-conditioning system thereof
Technical field
The invention belongs to refrigeration technology field, relate generally to a kind of discharge assembly and the air-conditioning system of using this discharge assembly.
Background technology
The air-conditioning of prior art or other forms of pump type heat refrigeration system; As shown in Figure 8; Mainly comprise functional parts such as compressor 101, first heat exchanger 102 and second heat exchanger 103, restricting element 104; And the airtight connection of each functional part formed the pipeline connecting parts 105 of medium distribution channel, medium through the variation of pressure and the conversion of vapour/liquid form, reaches and carries out heat exchange with surrounding environment and regulate the environment action of temperature in distribution channel.In the general structure, also be connected with flow path distributor 106, be connected with discharge assembly 107,, reach the purpose of fully carrying out heat exchange to optimize flow passage structure at the port of export of heat exchanger at the arrival end of heat exchanger (like first heat exchanger 102 among the figure).
Because the discharge assembly all combines for each tubular member welding, for the assurance refrigerant does not leak, thus need to guarantee welding quality, to reach the seal requirement of discharge assembly chamber; Because it is refrigeration plants such as air-conditioning are placed on the place of outdoor or circumstance complication for a long time, also very high simultaneously to the Corrosion Protection requirement of discharge assembly.
The general copper materials that adopt of the discharge assembly of prior art are processed more, and are promptly as shown in Figure 7.By the main discharge 1 ' of copper material machine-shaping as the body junction member, on the tube wall of main discharge welding some equally by the arms 2 ' of copper material machine-shaping, each arm 2 ' is connected with the port of export of heat exchanger.One end of main discharge 1 ' and the pipeline fitting of air-conditioning system are welded to connect, and the relative other end is made encapsulation process.Between main discharge 1 ' and each arm 2 ', and main discharge 1 ' and pipeline connecting parts between generally adopt the flame brazing method combination because the part pad is many, heat affecting is bigger each other, air-tightness control is difficult.Surface quality is relatively poor after the gas brazing simultaneously, need carry out necessary pickling, and is big to ambient influnence.
Simultaneously, along with the continuous development of industrial technology, the use that requirement has the business air conditioner of big standard ton ability also continued to increase in recent years; As the air-conditioning system of big standard ton, the pressure of medium circulation system is higher, requires airtight pressure to improve; Be that main discharge assembly volume is huge with the copper material, it is more to consume copper material, and this can be in any more at current copper valency; Under the rare day by day situation of copper material resource, also be unfavorable for the control and the sustainable development of cost.
Summary of the invention
The utility model is through providing a kind of new discharge assembly and the air-conditioning system of using this discharge assembly; Replace copper material with carbon steel or stainless steel material; Reduce material cost, improve the airtight reliability and simplification technology of product, this technology reduces pickling process environmental pollution.The discharge assembly of the utility model is fit to the use of large-size air conditioning such as business air conditioner more.Its discharge assembly comprises main discharge, the some arms that are communicated with said main discharge and the fairlead and the blocking that are welded on said main discharge two ends respectively; It is characterized in that; Said blocking is welded on the end of said main discharge, and cooperates with the inwall of said main discharge.
Further, like the discharge assembly of above-mentioned structure, the pipe portion of said main discharge has the stage portion that cooperates with said arm;
Further, like the discharge assembly of above-mentioned structure, an end of said main discharge has the expansion mouth that is connected cooperation with said fairlead;
Further, like the discharge assembly of above-mentioned structure, the end of said expansion mouth is provided with the scolder accommodation section.
Preferably, like the discharge assembly of above-mentioned structure, said main discharge is stainless steel material or carbon steel material.
Simultaneously; The utility model also provides a kind of air-conditioning system; This air-conditioning system comprises compressor, first heat exchanger and second heat exchanger, throttle part, it is characterized in that, also comprises the discharge assembly like above-mentioned architectural feature that at least one is connected with said heat exchanger.
Description of drawings
Fig. 1: the structural representation of the discharge assembly that the present invention provides;
Fig. 2: the structural representation of the main discharge among Fig. 1;
Fig. 3: the structural representation of the blocking among Fig. 1;
Fig. 4: blocking and main discharge syndeton sketch map;
Fig. 5: the assembling flow path figure of the discharge assembly that the utility model provides;
Fig. 6: the putting position figure after the discharge assembly pre-determined bit;
Fig. 6 A/6B: among Fig. 6 respectively at the enlarged diagram of A and B position;
Fig. 7: the structural representation of prior art discharge assembly;
Fig. 8: the sketch map in discharge component application and the air-conditioning system;
Fig. 9: the another kind of putting position figure after the discharge assembly pre-determined bit.
Symbol description among the figure:
1-master's discharge,
11-stage portion, 12-expansion mouth;
The 13-accommodation section;
2-arm, 3-fairlead;
The 4-blocking
The 101-compressor;
102-first heat exchanger;
103-second heat exchanger 103;
104-restricting element, 105-pipeline connecting parts;
106-flow path distributor, 107-discharge assembly
201-machine frame, 202-weld-ring.
The specific embodiment
Below in conjunction with specific embodiment, the technology of the utility model is described.
The structural representation of the discharge assembly that Fig. 1 provides for the utility model, Fig. 2 is the structural representation of main discharge, Fig. 3 is the structural representation of blocking.
Like Fig. 1, Fig. 2 and shown in Figure 3.Discharge assembly 107 as agent structure, is processed with several steps 11 by main discharge 1 on the tube wall of main discharge 1, main discharge 1 can be like illustrated employing straight tube structure, also can be according to the connection needs at one end or the two ends bend pipe.
According to the needs that air-conditioning system connects, the arm 2 of Design and Machining different spaces structure, as in the present embodiment, arm 2 is the different bent tube type (also can be straight pipe type certainly) of angle of bend.One end of arm 2 is deep into and implements welding affixed (such structure is convenient to welding procedure in the disposable stove of each parts, then will introduce in detail) in the step 11 of this main discharge 1.
End at main discharge 1 has expansion mouth 12, constitutes scolder accommodation section 13 at the end of expansion mouth 12 through the chamfering form.Fairlead 3 extend into and implements welding affixed (such structure is convenient to welding procedure in the disposable stove of each parts, then will introduce in detail) in this expansion mouth 12.
Fig. 4 is blocking and main discharge syndeton sketch map.Tubular blocking 4 is welded on the end of main discharge 1; And cooperate (such structure setting with the inwall of said main discharge; Be convenient to after main discharge 1 and arm 2 and fairlead 3 form weld assembly through furnace brazing; When making up with blocking 4 gas brazings again, can reduce the heat affecting of secondary welding).
In the present embodiment, main discharge preferably adopts the stainless steel material, and under identical wall thickness condition, the chamber pressure that can bear is bigger like this, and corrosion-resistant reliable.Certainly, main discharge also can adopt carbon steel material to process, and improves its corrosion resistance through electro-plating method; Same arm can adopt steel to process, and improves its corrosion resistance through methods such as electroplating surfaces.
The fairlead of the utility model preferably adopts the material consistent with air-conditioning duct spare to process, and is convenient to follow-up and the convenience that is welded to connect air-conditioning duct spare like this, fairlead can adopt straight tube also with the structure of bend pipe.Blocking of the present invention preferably adopts the material consistent with main discharge to be convenient to be welded to connect reliability.
Fig. 5 is the discharge assembly assembling flow chart of the utility model.
As shown in Figure 5.The preferred combined method of discharge assembly of the utility model is following:
Step 1: use stainless pipe tubing to process main discharge 1; Be included in stretch on the tube wall (flange) and go out several boss 11, the endoporus aperture of boss 11 and the cylindrical aperture of arm 2 be (main discharge also can carry out bend pipe and handle according to the assembling needs) quite; End processing enlarging 12 at main discharge 1; The endoporus aperture of its enlarging 12 is suitable with the cylindrical aperture of fairlead 3, and forms accommodation section (certainly, also can not process the accommodation section) in the end of enlarging 12 through chamfering or flared method.
Process some arms 2 of given shape on request; The material of arm 2 preferably uses carbon steel material and carries out copper plating treatment to be convenient to weld with the main discharge 1 of stainless steel material like this; Can certainly use copper material (as using copper material, just need not electroplating processes).
Use stainless steel or carbon steel material processing tubular blocking 4.
Adopt the materials processing fairlead 3 consistent with air-conditioning duct spare.Certainly, fairlead 3 can promptly adopt straight tube also with the structure of bend pipe.
Step 2: each arm 2 is inserted in the boss 11 of main discharge 1 through interference or interference fits mode; Fairlead 3 is inserted in the enlarging 12 of main discharge 1 through interference or interference fits mode, main like this discharge 1, arm 2 and fairlead 3 have been accomplished the pre-determined bit combination.
Step 3: referring to Fig. 6, the pre-determined bit sub-assembly is roughly lain on the machine frame 201, put into the weld-ring 202 of high temperature melting material respectively at the main discharge 1 and the connecting portion of arm 2 and fairlead 3.Promptly, on the arm of vertically placing 2, be inserted in weld-ring 202, and weld-ring 202 is inserted in the accommodation section 13 of the main discharge of laterally placing 1 respectively referring to Fig. 6 A and Fig. 6 B.Because the accommodation section effect makes weld-ring 202 be difficult for moving, and is convenient to follow-up delivering to through the driving-chain mode and carries out soldering in the stove.
Need to prove that main discharge 1 also can not process the accommodation section, that kind is as shown in Figure 9, and tilting frock can be set, and makes weld-ring 202 be difficult for moving, and is convenient to follow-up delivering to through the driving-chain mode and carries out soldering in the stove.
Step 4: deliver to through the discharge sub-assembly of driving-chain mode after and to carry out soldering in the stove, form weld assembly with pre-determined bit.
Step 5: sealing cap 4 is inserted on the inside pipe wall of main discharge 1 through interference or interference fits mode, forms the discharge assembly of gas collection chamber through gas brazing with airtight connection.
In this operation, because the tubular blocking is welded on the end of main discharge, and cooperates with the inwall of main discharge, certain distance is arranged apart from main discharge and Zhi Guanlu weldering link position, can reduce the heat affecting of secondary welding, improve the airtight reliability of welding.
Step 6:, the discharge assembly is charged into detection gas carry out leak detection at the terminal welding procedure sealing cap of fairlead 3.
In said structure and combined method; Because main discharge, arm and blocking all adopt carbon steel or stainless steel material; And the weld-ring of high temperature melting material adopts copper or silver-based material; Both molten temperature regions are different, are convenient in the stove weldering, control temperature range, can realize the disposable stove weldering of discharge assembly critical piece.
It below only is the preferred implementation of giving an example for the technical scheme that can better set forth the utility model; Should be understood that; For those skilled in the art; Under the prerequisite that does not break away from the principle of the invention, can also make some improvement and retouching, all these improvement and retouching also should be regarded as the protection domain of the utility model.

Claims (6)

1. discharge assembly; Comprise main discharge (1), the some arms (2) that are communicated with said main discharge (1) and the fairlead (3) and the blocking (4) that are welded on said main discharge (1) two ends respectively; It is characterized in that; Said blocking (4) is welded on the end of said main discharge (1), and cooperates with the inwall of said main discharge (1).
2. discharge assembly as claimed in claim 1 is characterized in that, the pipe portion of said main discharge (1) has the stage portion (11) that cooperates with said arm (2).
3. discharge assembly as claimed in claim 2 is characterized in that, an end of said main discharge (1) has the expansion mouth (12) that is connected cooperation with said fairlead (3).
4. discharge assembly as claimed in claim 3 is characterized in that, the end of said expansion mouth (12) is provided with the scolder accommodation section.
5. like the described arbitrary discharge assembly of claim 1-4, it is characterized in that said main discharge (1) is stainless steel material or carbon steel material.
6. air-conditioning system; Comprise compressor (101), first heat exchanger (102) and second heat exchanger (103), throttle part (104); It is characterized in that, comprise also that at least one is connected with said heat exchanger like the described arbitrary discharge assembly of claim 1-5.
CN2011203801380U 2011-10-09 2011-10-09 Air collecting pipe component and air-conditioner system thereof Expired - Lifetime CN202303790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203801380U CN202303790U (en) 2011-10-09 2011-10-09 Air collecting pipe component and air-conditioner system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203801380U CN202303790U (en) 2011-10-09 2011-10-09 Air collecting pipe component and air-conditioner system thereof

Publications (1)

Publication Number Publication Date
CN202303790U true CN202303790U (en) 2012-07-04

Family

ID=46372675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203801380U Expired - Lifetime CN202303790U (en) 2011-10-09 2011-10-09 Air collecting pipe component and air-conditioner system thereof

Country Status (1)

Country Link
CN (1) CN202303790U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102853513A (en) * 2012-06-08 2013-01-02 浙江三花制冷集团有限公司 Gas collecting tube component and manufacturing method of gas collecting tube component
CN104723048A (en) * 2015-01-22 2015-06-24 新昌县华亿机械有限公司 Novel welding method for air collecting pipes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102853513A (en) * 2012-06-08 2013-01-02 浙江三花制冷集团有限公司 Gas collecting tube component and manufacturing method of gas collecting tube component
CN104723048A (en) * 2015-01-22 2015-06-24 新昌县华亿机械有限公司 Novel welding method for air collecting pipes

Similar Documents

Publication Publication Date Title
CN102848137A (en) Method for manufacturing gas collecting tube component and air-conditioning system
CN102848139A (en) Connection pipe, production method thereof and gas collection tube assembly
CN104806824A (en) Novel copper and steel composite pipe, manufacture method and application
CN205064214U (en) Pump breathing pipe, compressor breathing pipe subassembly and compressor
CN201926224U (en) Valve component and multi-connected air-conditioning system
CN201191112Y (en) Refrigeration facilities tubing for air-conditioner
CN103542644A (en) Connection structure of cooling system of refrigerating plant
CN203869386U (en) Gas collecting tube component
CN104015019A (en) Air header component manufacturing method and heat exchanger using air header component
CN102848138A (en) Air collecting tube component producing method and air-conditioning system
CN202303790U (en) Air collecting pipe component and air-conditioner system thereof
CN102873508A (en) Method for manufacturing gas collecting tube assembly and air-conditioning system
CN103089586B (en) The manufacture method of a kind of compressor and pipe fitting thereof and application
CN102853511A (en) Air header assembly, assembly method thereof and air-conditioning system with same
CN102853512A (en) Gas collecting tube assembly, combination method thereof and air conditioning system
CN205118325U (en) Electromagnetic four -way reversing valve
CN202328660U (en) Air collecting pipe assembly and air conditioner system of air collecting pipe assembly
CN217713980U (en) Pipeline assembly and air conditioner
CN201934817U (en) Connecting structure of aluminum clad copper tubes and copper tubes
CN205615004U (en) Fluoroplastics heat exchange pipe and pipe plate's welding set
CN202018164U (en) Air return pipe for air conditioner
CN204321422U (en) Novel welding structure body
CN213685372U (en) Piping subassembly, cross valve subassembly and air conditioning system
CN107476958A (en) A kind of compressor air suction structure
CN207935596U (en) A kind of novel bourdon's tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171103

Address after: 312500 Zhejiang province Xinchang County chengtan town Mu Shao Tan

Patentee after: Xinchang four link electromechanical Co., Ltd.

Address before: 312500 Xinchang, Zhejiang province Qixing street under the village of Liquan

Patentee before: Sanhua Refrigeration Group Co., Ltd., Zhejang

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20120704

CX01 Expiry of patent term