CN202300427U - Heat-preservation shockproof door for tunnel - Google Patents

Heat-preservation shockproof door for tunnel Download PDF

Info

Publication number
CN202300427U
CN202300427U CN2011203354090U CN201120335409U CN202300427U CN 202300427 U CN202300427 U CN 202300427U CN 2011203354090 U CN2011203354090 U CN 2011203354090U CN 201120335409 U CN201120335409 U CN 201120335409U CN 202300427 U CN202300427 U CN 202300427U
Authority
CN
China
Prior art keywords
door
tunnel
insulation
shockproof
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203354090U
Other languages
Chinese (zh)
Inventor
方向春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN2011203354090U priority Critical patent/CN202300427U/en
Application granted granted Critical
Publication of CN202300427U publication Critical patent/CN202300427U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a heat-preservation shockproof door for a tunnel. The heat-preservation shockproof door is characterized by structurally comprising a main frame, a longitudinal piece, a large door, a small door, a vent hole and an exhaust hole. The heat-preservation shockproof door is simple in structural assembly, is light in weight, is durable and has good heat-preservation effect under the condition that passability, smoke discharge and ventilation are ensured completely, thereby providing a good working environment for tunnel construction in winter.

Description

The shockproof door of a kind of tunnel insulation
Technical field
The utility model relates to the constructing tunnel field, particularly the shockproof door of a kind of tunnel insulation.
Background technology
Cold and stern winter the constructing tunnel condition relatively harsher, how to guarantee that in the constructing tunnel process vehicle crew is normally current, discharges fume effectively and timely, ventilate, can realize the insulation in tunnel again shockproof, a kind of tunnel insulation vibration abatement of needs usually.
The utility model content
The purpose of the utility model is: shockproof of a kind of tunnel insulation is provided, is guaranteeing that fully high insulating effect is for the tunnel winter construction provides good working environment under the condition of passing through, discharge fume, ventilating.The shockproof door of said tunnel insulation has characteristics such as simple in structure, in light weight, durable in use, practical.
The main door of the shockproof door of the tunnel insulation that the utility model provides is characterized in that: the structure of the shockproof door of said insulation comprises, main body frame 1, vertical part 2, gate 3, wicket 4, ventilation opening 5, exhaust opening 6, fixture 8, steel mesh reinforcement, insulation filling materials, the tarpaulin of joining; Double member connects through vertical couplet part 2 welding or flange, and main body frame 1 bottom is fixed in the inverted arch backfill 7 through fixture 8;
Said main body frame 1 is made up of double member, and said double member connects through vertical couplet part 2 welding or flange, and said main body frame 1 bottom adopts anchor bolt or anchor bar to be fixed in the inverted arch backfill 7 through flange;
Said gate 3 is the double door double-decker, is connected with main body frame 1 through Xiao's bolt, forms swivel structure; Said wicket 4 is the single open-door double-decker, is connected with main body frame 1 through Xiao's bolt, forms swivel structure;
Said ventilation opening 5 adopts reinforcing bar to be welded, and is connected with steel mesh reinforcement and fixes, and its diameter is the ventilating bag diameter, i.e. Φ=180cm or Φ=150cm; Said exhaust opening 6 adopts reinforcing bar to be welded, and is connected with steel mesh reinforcement and fixes, and its diameter is Φ=100cm or Φ=120cm; Said steel mesh reinforcement is Φ=8mm reinforcing bar for adopting diameter, and size of mesh opening is 10cm * 10cm, is welded in main body frame 1 outside, and insulation filling materials is played the effect that retaining protects;
Be incubated shockproof door and also comprise net, insulation filling materials, shelter, insulation filling materials is clogged between two layers of mesh, and shelter is fixed on the net closely;
Said insulation filling materials adopts compositions such as straw or maize straw, clogs between two-layer steel mesh reinforcement, and the filling compactness should be moderate, and is too not closely knit or loose, has insulation, cushioning effect; Said tarpaulin is fixed on the steel mesh reinforcement closely, plays the modification insulation effect.
The shockproof Men Cimen of the tunnel insulation that the utility model provides is characterized in that: the structure of the shockproof door of said insulation comprises skeleton reinforcing steel bar 01, suspension hook 02, tarpaulin 03; Said suspension hook 02 is fixed in skeleton reinforcing steel bar 01; Said tarpaulin 03 is linked in suspension hook 02; Tarpaulin 03 is that separation becomes two parts to break off with the tunnel center line.
Description of drawings
Fig. 1 is the main door of the shockproof door of a utility model tunnel insulation sketch map;
Fig. 2 is the shockproof Men Cimen sketch map of the utility model tunnel insulation.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done and to be further described: be as shown in Figure 1; In the utility model preferred embodiment, be main body frame 1 with double steel pipe frame, 1 of main body frame adopts steel pipe to be welded to connect; 1 liang of lateral surface of main body frame adopts diameter of phi=8mm steel mesh reinforcement welding; Insulation filling materials such as filling straw and sawdust between the reinforced mesh are incubated shockproof door and are provided with the twice inlet/outlet, are that vehicle pass-through Men Rutu gate 3 adopts double door together; Another road is that walk Men Rutu wicket 4 adopts single open-door, is incubated shockproof door and all is provided with gravity vent 5 and steam vent 6 on top.
The processing and the installation process of the main door of the shockproof door of said tunnel insulation: at first the welding assembly main body frame 1, in assembling, the welding process, for guaranteeing the precision of each member, can delimit scantling figure prior to ground, and accurate location; In the welding assembly, carry out the horizontal vertical member earlier, carry out fan-shaped component again and install, carry out crossing members at last and install; After treating main body frame 1 assembled, hole inner side main body framework 1 is lifted fixing, top and side adopt anchor bolt and " U " shaped steel muscle to fix; Footing adopts expansion bolt to be fixed in inverted arch and fills 7 end faces; After hole inner side main body framework 1 installs, carry out 1 lifting of hole outside main body framework, and adopt the vertical part 2 that joins to be welded to connect; Behind to be welded the finishing; Also adopt anchor bolt and " U " shaped steel muscle to fix to outside main body frame, gate 3 and wicket 4 direct machine-shaping in ground carry out integral hoisting and install; Steel mesh reinforcement 7 adopt shaping nettings or field machining all can, colligation or be welded in the outside of main body frame 1, size of mesh opening adopts 10cm * 10 cm to be advisable; Ventilation opening 5 adopts reinforcing bar to be welded, and is fixed on the reinforced mesh, is used for the ventilating bag inlet port, and its diameter is ventilating bag diameter 1.8m or 1.5m; Exhaust opening 6 is prone to adopt reinforcing bar to be welded, and is fixed on the reinforced mesh, and its diameter can be confirmed according to tunnel advanced depth, smoke evacuation, exhaust situation; Insulation filling materials can be selected straw or maize straw etc. for use, clogs between two-layer steel mesh reinforcement, and the filling compactness should be moderate, and is too not closely knit or loose, so that play the effect of anti-gas shock insulation the time; Tarpaulin is close to the steel mesh reinforcement outside, plays insulation, decoration function.
Shockproof Men Cimen is as shown in Figure 2 for said tunnel insulation; The installation and processing process is: apart from the about 40m of main door place time door is being set; Prior to suspension hook 02 of every interval 50~100cm welding on the skeleton reinforcing steel bar 01, skeleton reinforcing steel bar 01 adopts expansion bolt to weld fixing to skeleton reinforcing steel bar 01 after in the hole, circularizing state naturally along lining; During suspension tarpaulin 03, be that separation becomes two parts to break off with the tunnel center line.
Between promptly main door of the shockproof door of twice insulation and inferior door, be provided with stove; Homonymy stove spacing is 10m, and being incubated shockproof door also is 10m apart from stove, and the stove burning smoke is discharged outside the hole through chimney; Notice that chimney passes heat proof materials such as adopting asbestos shingle when being incubated shockproof and protects isolation, in case fire.
The tarpaulin 03 of the shockproof Men Cimen of insulation is in open mode to lifting in the work progress, so that the heating installation that heating is provided with transmits inwardly; Guarantee the construction temperature in the tunnel, during vehicle pass-through, make time door be in closed condition earlier; Gate on the open main door treats that vehicle passes through main door; Close main door and open time door again, thereby prevent that cold air from transmitting in the tunnel, the construction walk is accomplished to shut the door after you in the wicket of main door.
The preferred embodiment that the above is merely the utility model is not in order to limit the application range of the utility model; All other do not break away from the equivalence of being accomplished under the essence that the utility model discloses and change or modify, and all should be included in following claims scope.

Claims (2)

1. the shockproof door of a tunnel insulation, it is characterized in that: the structure of the shockproof door of said insulation comprises, main body frame (1), vertical part (2), gate (3), wicket (4), ventilation opening (5), the exhaust opening (6) of joining; Said main body frame (1) is made up of double member, and said double member connects through the vertical part (2) that joins, and said main body frame (1) bottom is fixed in the inverted arch backfill (7) through fixture (8).
2. the shockproof door of tunnel insulation according to claim 1 is characterized in that: the shockproof door of said insulation also comprises net, insulation filling materials, shelter; Said insulation filling materials is clogged between two layers of mesh, and said shelter is fixed on closely on the net.
CN2011203354090U 2011-09-08 2011-09-08 Heat-preservation shockproof door for tunnel Expired - Fee Related CN202300427U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203354090U CN202300427U (en) 2011-09-08 2011-09-08 Heat-preservation shockproof door for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203354090U CN202300427U (en) 2011-09-08 2011-09-08 Heat-preservation shockproof door for tunnel

Publications (1)

Publication Number Publication Date
CN202300427U true CN202300427U (en) 2012-07-04

Family

ID=46369349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203354090U Expired - Fee Related CN202300427U (en) 2011-09-08 2011-09-08 Heat-preservation shockproof door for tunnel

Country Status (1)

Country Link
CN (1) CN202300427U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566104A (en) * 2019-09-24 2019-12-13 武汉开得利门业有限公司 Light high-strength corrosion-resistant tunnel protection door or cavern door

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566104A (en) * 2019-09-24 2019-12-13 武汉开得利门业有限公司 Light high-strength corrosion-resistant tunnel protection door or cavern door

Similar Documents

Publication Publication Date Title
CN105714963B (en) A kind of inorganic light weight combined heat-insulating integral exterior wall cladding system and its installation method
CN103669905B (en) Lightweight compound prefabricated panel modular house and construction method thereof
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN109944335A (en) Frame and the combination assembled structural system of shear wall Core Walls Structure
CN202300522U (en) Tunnel heat preservation door
CN103669707A (en) Light composite prefabricated wallboard for house and preparation method thereof
CN206070838U (en) A kind of new cast-in-situ hollow building roof that the filling of cage type Cavity structural member is expanded with steel plate
CN202300427U (en) Heat-preservation shockproof door for tunnel
CN201649341U (en) Environment-friendly and energy-saving fireproof light roof plate and floor slab
CN205475901U (en) Inorganic light compound incubation integration exterior wall cladding system
CN201850673U (en) No-fines concrete sandwich wall structure
CN107379224A (en) A kind of Combined type reinforced truss concrete structure heat-preserving wall component
CN203834716U (en) Fireproof steel structure unit and system for building
CN207538277U (en) A kind of steel frame construction on roof
CN208934169U (en) A kind of firewall
CN105696812A (en) Thermal insulation fireproof removable house
CN207160393U (en) A kind of plug-in energy-saving wall board of precast light
CN102587547A (en) Composite curtain wall for multifunctional building
CN206220303U (en) A kind of assembled architecture outer wall light insulating wall
CN214531426U (en) New-type outdoor top cap of full package assembly
CN102587623B (en) Variable-pressure main-branch type fireproof smoke exhaust pipeline
CN105220549B (en) A kind of maintaining steel wire rope immersion oil and smoke removing device
CN206160080U (en) Integrate into vertical exhaust -heat boiler's building structure
CN201687178U (en) House fume concentrated discharge device
CN207140032U (en) A kind of Combined type reinforced truss concrete structure heat-preserving wall component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131202

Address after: 130033 No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee after: CHINA RAILWAY 13TH BUREAU GROUP 6TH ENGINEERING COMPANY LIMITED

Address before: Fang Lan Road in Dongling District of Shenyang city of Liaoning Province, No. 60 110043

Patentee before: China Railway 13th Bureau Group The 3rd Enginnering Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY BRIDGE ENGINEERING BUREAU GROUP SIXT

Free format text: FORMER OWNER: CHINA RAILWAY NO. 13 ENGINEERING GROUP NO. 6 ENGINEERING CO., LTD.

Effective date: 20140801

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140801

Address after: 130033 No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee after: CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO.6 ENGINEERING CO., LTD.

Address before: 130033 No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee before: CHINA RAILWAY 13TH BUREAU GROUP 6TH ENGINEERING COMPANY LIMITED

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20170908