CN202299578U - Transmission line video monitoring system bracket for installation of angle steel tower main material - Google Patents

Transmission line video monitoring system bracket for installation of angle steel tower main material Download PDF

Info

Publication number
CN202299578U
CN202299578U CN2011201339310U CN201120133931U CN202299578U CN 202299578 U CN202299578 U CN 202299578U CN 2011201339310 U CN2011201339310 U CN 2011201339310U CN 201120133931 U CN201120133931 U CN 201120133931U CN 202299578 U CN202299578 U CN 202299578U
Authority
CN
China
Prior art keywords
pedestal
angle steel
transmission line
steel tower
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201339310U
Other languages
Chinese (zh)
Inventor
李桥梁
杨忠
黄宵宁
吴怀群
高廉洁
顾元政
唐蓉
顾允龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University of Aeronautics and Astronautics
Original Assignee
Nanjing University of Aeronautics and Astronautics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University of Aeronautics and Astronautics filed Critical Nanjing University of Aeronautics and Astronautics
Priority to CN2011201339310U priority Critical patent/CN202299578U/en
Application granted granted Critical
Publication of CN202299578U publication Critical patent/CN202299578U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model provides a transmission line video monitoring system bracket for the installation of an angle steel tower main material, which comprises a horizontal beam, a base and a base fixing splint, wherein the base is fixedly arranged on the angle steel tower main material by bolts through the base fixing splint. The transmission line video monitoring system bracket is characterized in that screw holes for installing a monitoring box body are arranged in the two side surfaces of the horizontal beam; U-shaped seats for installing a ball machine stem are respectively welded at the two sides of the base; one end of the horizontal beam is welded with the base, and a circular pipe for installing a solar energy module or a wind-driven generator is welded on the upper surface of the other end of the horizontal beam. The transmission line video monitoring system bracket has the beneficial effects that the installation of the monitoring box body for a transmission line video monitoring system component, the solar energy module/a fan and a camera is satisfied; the installation is simple and solid; the transmission line video monitoring system bracket can adapt to typhoon and other open-air extreme abnormal weather; and the disassembly and the assembly are simple; any type of structural change on the existing angle steel tower is not required, and the angle steel tower can also not be damaged.

Description

A kind of transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material
Technical field
The utility model relates to transmission line of electricity video monitoring engineering, especially a kind of the transmission line of electricity video monitoring system is installed in the mounting bracket on the transmission line of electricity angle steel tower master material.
Background technology
Video monitoring has very strong application potential owing to comprise abundant information in the transmission line of electricity monitoring.Yet, to compare with the video monitoring of routine, the transmission line of electricity video monitoring has following characteristics installing:
1) generally, supervising device can only be installed on the electric power line pole tower (angle steel tower or steel tube tower);
2) installation of supervising device on shaft tower can not be done any change to tower structure, more can not damage shaft tower;
3) the transmission line of electricity video monitoring does not have to supply the directly AC power of use.The power supply supply can only by solar components with (or) wind energy.Therefore the installation on the shaft tower of transmission line of electricity video monitoring system is except that the installation of considering the monitoring casing, also must consider solar components with (or) installation of wind-driven generator;
4) for satisfying various monitoring needs, the installation site of rig camera should be able to extend to outside the tower body;
5) installing must be firm, can resist the weather conditions of field complicacy, like typhoon etc.;
6) because the installation of transmission line of electricity video monitoring system on shaft tower belongs to the high-altitude dangerous operation usually, so installation process should be simple and convenient as far as possible.
The angle steel tower is the principal mode of domestic and international mesohigh electric power line pole tower.The angle steel tower all is made up of the angle steel of different size, on form of structure with four thicker angle steel as column (promptly main material), other is horizontal corner steel (being horizontal material) and tilting angle steel (being oblique material).Horizontal material is installed in monitoring box and solar components on horizontal material or the oblique material with tiltedly material is relatively thin, can't adapt to extreme climates such as open-air typhoon.
The utility model content
The technical problem to be solved of the utility model is to propose a kind of monitoring front end of video monitoring system mounting bracket, satisfies the installation of transmission line of electricity video monitoring system parts (monitoring casing, solar energy/blower fan, video camera); Simple rigid is installed, can adapts to open-air extreme extreme climates such as typhoon; Dismounting is simple, need not former angle steel tower is done any type of structural modification, also can not cause damage by the diagonal angle head tower.
The utility model is for realizing that above-mentioned utility model purpose adopts following technical scheme:
A kind of transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material; Comprise horizontal beam, pedestal, pedestal strap; Pedestal through the pedestal strap by being bolted on the angle steel tower master material; Be provided with the screw that is used to install the monitoring casing in the two sides of said horizontal beam; Said pedestal both sides respectively are welded with a U type seat that is used to pacify the pulping apparatus bar, an end of said horizontal beam and pedestal welding, and the other end upper surface welding of horizontal beam is used to install the round tube of solar components or wind-driven generator.
Further, the said transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material also is provided with the reinforcement gusset that is used to strengthen horizontal beam and pedestal bonding strength between horizontal beam and pedestal.
Further, the said transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material, the angle between horizontal beam and the pedestal equals the angle on angle steel tower master's material and ground.
Further, the said transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material, pedestal, pedestal strap are right angle type.
The utility model adopts technique scheme to have following beneficial effect:
A kind of transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material satisfies the installation of transmission line of electricity video monitoring system parts (monitoring casing, solar energy/blower fan, video camera); Simple rigid is installed, can adapts to open-air extreme extreme climates such as typhoon; Dismounting is simple, need not former angle steel tower is done any type of structural modification, also can not cause damage by the diagonal angle head tower.
Description of drawings:
The front view of Fig. 1 main support.
The vertical view of Fig. 2 main support.
Fig. 3 main support extends the part vertical view of support bar.
The front view of Fig. 4 right angle splint.
Fig. 5 is the vertical view of right angle splint.
Label declaration among the figure: 1-horizontal beam, 2-pedestal, 3-assembly/blower fan mount pad, 4-locking nut; The 5-casing mounts screw, 6-ball machine bar mount pad, 7-ball machine bar fixing hole; 8-pedestal fixing hole, 9-strengthens gusset, the angle of 10-horizontal beam and pedestal; The 11-waist-shaped hole, 12-pedestal strap, 13-strengthens gusset.
Specific embodiments:
Below in conjunction with accompanying drawing the enforcement of technical scheme is done further to describe in detail:
A kind of transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material; Comprise horizontal beam 1, pedestal 2, pedestal strap 12; Wherein, Horizontal beam 1 adopts C shaped steel and both sides that screw is all arranged, and pedestal 2 both sides respectively are welded with a U type seat, and an end of horizontal beam 1 is welded on the perpendicular type pedestal 2 and the bonding strength of horizontal beam 1 and pedestal 2 is strengthened with strengthening gusset 9 in the below; The other end upper surface of horizontal beam 1 welding round tube, pedestal 2 through perpendicular type pedestal strap by being bolted on the angle steel tower master material; Angle between horizontal beam 1 and the pedestal 2 equals the angle on angle steel tower master's material and ground.
The embodiment that the utility model adopted is:
As shown in Figure 1: horizontal beam is welded on the pedestal, since the main material and the ground out of plumb of angle steel tower, about 87 degree of angle, so out of plumb between horizontal beam and the pedestal therebetween, and angle is 87 degree; Horizontal beam adopts C shaped steel.Strengthen gusset and be used for the bonding strength of enhanced level beam and pedestal, be weight reduction, the reinforcement gusset is hollow out suitably; The horizontal beam both sides respectively have 6 casings to mount screw, and the monitoring casing can be mounted on the either side of horizontal beam as required; Assembly/blower fan mount pad is welded on an end of horizontal beam upper surface, is used for installing solar components or wind-driven generator; Assembly/blower fan mount pad integral body is a pipe vertically upward, so that the angle of any adjusting part of horizontal direction or blower fan, this angle is fixed through 6 locking nuts on assembly/blower fan mount pad after confirming; 6 locking nuts are two-layer up and down, and 3 every layer, be circumference uniform distribution, two-layer up and down 60 degree that stagger, as shown in Figure 3.
As shown in Figure 2: a ball machine bar mount pad is respectively welded in the pedestal both sides, as required ball machine bar is installed in either side; Ball machine bar mount pad is the U type and two ball machine bar fixing holes is arranged up and down, can adjust and with bolton ball machine bar.
Front view and vertical view like Fig. 4 and right angle splint shown in Figure 5: pedestal is fixed on the angle steel tower master material through the pedestal strap; Respectively there are 3 pedestal installing holes the pedestal both sides; Respectively there are 3 waist-shaped holes relative in pedestal strap both sides, to adapt to the installation needs of different size angle steel tower with the pedestal installing hole; Through pedestal installing hole and waist-shaped hole angle steel tower master material is clamped the installation of realization entire bracket on the angle steel tower with bolt, be weight reduction, strengthen gusset can for two of pedestal strap welding.
According to the above, just can realize the utility model.

Claims (4)

1. one kind is used for the transmission line of electricity video monitoring system support that angle steel tower master material is installed; Comprise horizontal beam, pedestal, pedestal strap; Pedestal through the pedestal strap by being bolted on the angle steel tower master material; It is characterized in that: be provided with the screw that is used to install the monitoring casing in the two sides of said horizontal beam; Said pedestal both sides respectively are welded with a U type seat that is used to pacify the pulping apparatus bar, an end of said horizontal beam and pedestal welding, and the other end upper surface welding of horizontal beam is used to install the round tube of solar components or wind-driven generator.
2. the transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material according to claim 1 is characterized in that: between horizontal beam and pedestal, also be provided with the reinforcement gusset that is used to strengthen horizontal beam and pedestal bonding strength.
3. the transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material according to claim 1, it is characterized in that: the angle between horizontal beam and the pedestal equals the angle on angle steel tower master's material and ground.
4. the transmission line of electricity video monitoring system support that is used for the installation of angle steel tower master material according to claim 1, it is characterized in that: said pedestal, pedestal strap are right angle type.
CN2011201339310U 2011-04-29 2011-04-29 Transmission line video monitoring system bracket for installation of angle steel tower main material Expired - Fee Related CN202299578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201339310U CN202299578U (en) 2011-04-29 2011-04-29 Transmission line video monitoring system bracket for installation of angle steel tower main material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201339310U CN202299578U (en) 2011-04-29 2011-04-29 Transmission line video monitoring system bracket for installation of angle steel tower main material

Publications (1)

Publication Number Publication Date
CN202299578U true CN202299578U (en) 2012-07-04

Family

ID=46368503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201339310U Expired - Fee Related CN202299578U (en) 2011-04-29 2011-04-29 Transmission line video monitoring system bracket for installation of angle steel tower main material

Country Status (1)

Country Link
CN (1) CN202299578U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216718A (en) * 2013-03-26 2013-07-24 国家电网公司 Anemoscope
CN110080594A (en) * 2019-04-19 2019-08-02 闽江学院 A kind of power transmission tower equipped with the quick mounting structure of monitoring device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216718A (en) * 2013-03-26 2013-07-24 国家电网公司 Anemoscope
CN103216718B (en) * 2013-03-26 2015-10-28 国家电网公司 A kind of anemoscope
CN110080594A (en) * 2019-04-19 2019-08-02 闽江学院 A kind of power transmission tower equipped with the quick mounting structure of monitoring device

Similar Documents

Publication Publication Date Title
CN201874761U (en) Levelling device for foundation ring of wind generating set
CN206890038U (en) Transmission line of electricity video on-line monitoring device steel tube tower special stand
CN204425246U (en) A kind of adjustable photovoltaic support
CN201608671U (en) Fixed solar generator
CN204042187U (en) A kind of flexible pipeline support bracket
CN202299578U (en) Transmission line video monitoring system bracket for installation of angle steel tower main material
CN204440173U (en) A kind of coupling structure and sun power single-shaft tracking system
CN202298645U (en) Installation support device for megawatt fan base ring
CN205081747U (en) Pole of mountable photovoltaic power generation support
CN204243992U (en) Wind power generation bus supporting mechanism
CN206759374U (en) A kind of novel foundation stake adjustable photovoltaic support
CN204733123U (en) A kind of uniaxial tracking bracket
CN201964295U (en) Rectangular flower-shaped solar energy street lamp
CN205779487U (en) A kind of cabin assembling base frock being applicable to polytypic blower fan
CN104699123B (en) A kind of coupling structure and solar energy single-shaft tracking system
CN205064188U (en) Solar cell panel fixing device and including its aerogenerator pylon
CN108054983A (en) Photovoltaic module support and its mounting process
CN203176643U (en) Water-wheel generator lower rack
CN202977456U (en) Solar photovoltaic generation windproof adjustable fixing support
CN205689363U (en) Novel vertical axis wind power generation pylon
CN206472086U (en) One kind is collapsible to use solar photovoltaic bracket temporarily
CN204592803U (en) The fixed structure of power transmission tower video surveillance devices
CN101259896B (en) Assembly for transporting windmill generator vane and using method thereof
CN204179997U (en) Adjustable photovoltaic assembly support
CN204290825U (en) The photovoltaic lightningproof header box mounting structure utilizing anchor ear to install

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20160429