CN202299522U - Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same - Google Patents

Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same Download PDF

Info

Publication number
CN202299522U
CN202299522U CN201120363402XU CN201120363402U CN202299522U CN 202299522 U CN202299522 U CN 202299522U CN 201120363402X U CN201120363402X U CN 201120363402XU CN 201120363402 U CN201120363402 U CN 201120363402U CN 202299522 U CN202299522 U CN 202299522U
Authority
CN
China
Prior art keywords
steel
production
roof
auxiliary equipment
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120363402XU
Other languages
Chinese (zh)
Inventor
叶正林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Honglu Steel Structure Group Co Ltd
Original Assignee
Anhui Honglu Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Honglu Steel Structure Group Co Ltd filed Critical Anhui Honglu Steel Structure Group Co Ltd
Priority to CN201120363402XU priority Critical patent/CN202299522U/en
Application granted granted Critical
Publication of CN202299522U publication Critical patent/CN202299522U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model provides a production mechanism for the steel-structural roof of a factory building and auxiliary equipment for assembly for the same, wherein a colour plate moulding press is disposed on a high production platform, and the produced colour steel plate is drawn and extended to the whole roof by the auxiliary equipment for assembly. In the production mechanism for the steel-structural roof of a factory building and the auxiliary equipment for assembly for the same provided by the utility model, the production mode of 'firstly producing and then assembling' in the prior art is changed into a novel production mode of 'assembling while producing', colour plate moulding press is ascended to a certain height by high production platform, and the produced colour steel plate is immediately used for roof assembly. The production mechanism is less in the time consumption of production process, fast in moulding for steel-structural roof, and highly suitable for fast-paced production mode.

Description

Steel-structure factory building roof production mechanism and assembly unit auxiliary equipment thereof
Technical field
The utility model relates to steel work production and assembly unit field, is specifically related to a kind of steel-structure factory building roof production mechanism, and the steel-structure factory building roof is carried out the auxiliary equipment of assembly unit.
Background technology
At present; Steel-structure factory building is used widely in industries such as iron and steel, building materials, coal, electric power, food; For the assembly unit of steel-structure factory building roof parts, the main employing " produce earlier, assembly unit again ", promptly earlier in the surface production environment of routine with steel construction piece output in advance; Form plate steel construction piece or spool formed steel construction spare, by hanging device the steel construction piece lifting is carried out the assembly unit moulding to the position, roof again.Whole production and assembly unit flow process length consuming time, manpower use frequent, the current allegro mode of production of incompatibility.
The utility model content
To the problem that exists in the above prior art, the utility model provides the production limit assembly unit of a kind of limit, the steel-structure factory building roof production mechanism of quickness and high efficiency, and a kind of assembly unit auxiliary equipment.
The utility model is realized through following technical scheme:
First scheme of the utility model provides a kind of steel-structure factory building roof production mechanism.
Steel-structure factory building roof production mechanism comprises the colored steel forming press, and said production mechanism comprises that also one produces high platform, institute
Stating the colored steel forming press is arranged on the high platform of production.
The high platform of said production is the height Collapsible structure.
The height of the high platform of said production is suitable with the eaves height.
The alternative plan of the utility model provides the auxiliary equipment of a kind of steel-structure factory building roof assembly unit.
The assembly unit auxiliary equipment of steel-structure factory building roof production mechanism, said auxiliary equipment is the color steel carriage, is laid on the steel extension circuit on roof.
Said color steel carriage be two with the suitable pulley of colored steel forming press exit width.
Said color steel carriage be two with the suitable pulley track of colored steel forming press exit width.
The beneficial effect of the utility model is: the novel production model that the production model of " production, assembly unit more earlier " in the prior art is changed to " limit production, limit assembly unit "; Utilize the high platform of production that the colored steel forming press is risen to certain altitude; The color steel of producing carries out the roof assembly unit immediately; Production procedure weak point consuming time, the moulding of steel work roof is quick, adapts to very much the allegro mode of production.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1 is the colored steel forming press; 2 for producing high platform; 3 is eaves; 4 is pulley; 5 is pulley track; 6 is steel extension circuit.
The specific embodiment
Explain further details below in conjunction with accompanying drawing and specific embodiment ground the utility model.
The utility model provides a kind of steel-structure factory building roof production mechanism, and original directly ornaments through producing high platform 2, are increased to the position suitable with the height of eaves 3 at the colored steel forming press 1 on ground, is convenient to carry out the operation of " limit production, limit assembly unit ".In the utility model, producing high platform 2 is the setting of height Collapsible structure, so just can make colored steel forming press 1 cooperate any height in controlled range to carry out the operation of " limit production, limit assembly unit ".
When using the utility model scheme; After producing the large-scale steel that are suitable for assembly unit on the high platform 2 of production; But also exist in the practical operation invar material amount huge; The problem of the difficulty that stretch to extend especially stretches steel when extending into the other end and laying, very effort from the end on roof along steel extension circuit 6.
Therefore; The utility model also provides the auxiliary equipment of a kind of steel-structure factory building roof assembly unit; Refer to a kind of color steel carriage; The utility model is laid in it on steel extension circuit 6 on roof, and general steel-structure factory building roof adopts the architecture mode of purlin as steel extension circuit 6 more.The color steel carriage can adopt two with the suitable pulley 4 of colored steel forming press 1 exit width, or two with the suitable pulley track 5 of colored steel forming press 1 exit width.Utilize the color steel carriage easily effortlessly the color steel of producing to be stretched and extend into whole roof surface.For the installation quantity and the mounting means of color steel carriage, can be configured according to different roof installation requirements.
The utility model changes to the production model of " production, assembly unit more earlier " in the prior art the novel production model of " limit production, limit assembly unit "; Utilize the high platform 2 of production that colored steel forming press 1 is risen to certain altitude; The color steel of producing carries out the roof assembly unit immediately; Production procedure weak point consuming time, the moulding of steel work roof is quick, adapts to very much the allegro mode of production.

Claims (6)

1. production mechanism in steel-structure factory building roof comprises the colored steel forming press, it is characterized in that said production mechanism comprises that also one produces high platform, and said colored steel forming press is arranged to be produced on the high platform.
2. steel-structure factory building according to claim 1 roof production mechanism is characterized in that the high platform of said production is the height Collapsible structure.
3. steel-structure factory building according to claim 1 and 2 roof production mechanism is characterized in that the height of the high platform of said production is suitable with the eaves height.
4. the assembly unit auxiliary equipment that is used for the described steel-structure factory building of claim 1 roof production mechanism is characterized in that said auxiliary equipment is the color steel carriage, is laid on the steel extension circuit on roof.
5. assembly unit auxiliary equipment according to claim 4, it is characterized in that said color steel carriage be two with the suitable pulley of colored steel forming press exit width.
6. claim requires 4 described assembly unit auxiliary equipment, it is characterized in that said color steel carriage be two with the suitable pulley track of colored steel forming press exit width.
CN201120363402XU 2011-09-26 2011-09-26 Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same Expired - Fee Related CN202299522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120363402XU CN202299522U (en) 2011-09-26 2011-09-26 Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120363402XU CN202299522U (en) 2011-09-26 2011-09-26 Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same

Publications (1)

Publication Number Publication Date
CN202299522U true CN202299522U (en) 2012-07-04

Family

ID=46368448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120363402XU Expired - Fee Related CN202299522U (en) 2011-09-26 2011-09-26 Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same

Country Status (1)

Country Link
CN (1) CN202299522U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359291A (en) * 2011-09-26 2012-02-22 安徽鸿路钢结构(集团)股份有限公司 Roof production mechanism and assembling auxiliary equipment for steel structure plant
CN111561139A (en) * 2019-11-21 2020-08-21 江苏跃界装配式建筑科技有限公司 Method for constructing roof of fabricated building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359291A (en) * 2011-09-26 2012-02-22 安徽鸿路钢结构(集团)股份有限公司 Roof production mechanism and assembling auxiliary equipment for steel structure plant
CN111561139A (en) * 2019-11-21 2020-08-21 江苏跃界装配式建筑科技有限公司 Method for constructing roof of fabricated building

Similar Documents

Publication Publication Date Title
CN205184224U (en) Precious shower faucet case automatic assembly frock of pressure boost
CN202299522U (en) Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same
CN202879550U (en) Automatic unloading carrier for block maintenance
CN201826508U (en) Uneven-wall cement-based material equivalent-thickness spraying device
CN102359291A (en) Roof production mechanism and assembling auxiliary equipment for steel structure plant
CN203526909U (en) Special press fit device for skylight glass seal strips
CN204434064U (en) A kind of cell cathode carbon block turning device
CN204431486U (en) Novel small-sized concrete mixer
CN202299189U (en) Steel structural plant roof assembling auxiliary equipment
CN203610919U (en) Lock hanging mechanism of automatic door lock assembling mechanism
CN202527344U (en) Die for adhering sticking briquettes
CN202304430U (en) Automatic feeding device of aluminum smelting furnace
CN201893367U (en) Layout template of solar photovoltaic assembly
CN105464300A (en) Roof production mechanism
CN203565278U (en) Double-station efficient glue coating machine
CN203185473U (en) Die of prefabricated wall building body
CN202904312U (en) Raising and lowering control device for thermoplastic plate heating equipment
CN201998313U (en) Novel concrete curing device
CN204295848U (en) A kind of architectural prefab particular manufacturing craft
CN203270268U (en) Sewing machine base
CN203867149U (en) Cementing machine
CN201410694Y (en) Wood floor process switching rack
CN203919136U (en) The Fixed width edge-neatening apparatus of glass steel tile
CN202089552U (en) Trolley for transferring pole plates
CN204098328U (en) A kind of light insulating brick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20180926