CN102359291A - Roof production mechanism and assembling auxiliary equipment for steel structure plant - Google Patents
Roof production mechanism and assembling auxiliary equipment for steel structure plant Download PDFInfo
- Publication number
- CN102359291A CN102359291A CN2011102884520A CN201110288452A CN102359291A CN 102359291 A CN102359291 A CN 102359291A CN 2011102884520 A CN2011102884520 A CN 2011102884520A CN 201110288452 A CN201110288452 A CN 201110288452A CN 102359291 A CN102359291 A CN 102359291A
- Authority
- CN
- China
- Prior art keywords
- steel
- production
- roof
- auxiliary equipment
- forming press
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Instructional Devices (AREA)
Abstract
The invention provides a roof production mechanism and assembling auxiliary equipment for a steel structure plant. A colorful plate forming press is arranged on a production elevation stand. Produced colorful steel plates are stretched and extended to the whole roof by the assembling auxiliary equipment. A production mode of assembling after producing in the prior art is changed into a novel production mode of assembling while producing, the colorful plate forming press is lifted to certain height by the production elevation stand, the produced colorful steel plates are assembled into the roof immediately, production flow consumes short time, and the steel structure roof can be quickly shaped. Therefore the invention is very suitable for fast-paced production modes.
Description
Technical field
The present invention relates to steel work production and assembly unit field, be specifically related to a kind of steel-structure factory building roof production mechanism, and the steel-structure factory building roof is carried out the auxiliary equipment of assembly unit.
Background technology
At present; Steel-structure factory building is used widely in industries such as iron and steel, building materials, coal, electric power, food; For the assembly unit of steel-structure factory building roof parts, the main employing " produce earlier, assembly unit again ", promptly earlier in the surface production environment of routine with steel construction piece output in advance; Form plate steel construction piece or spool formed steel construction spare, by hanging device the steel construction piece lifting is carried out the assembly unit moulding to the position, roof again.Whole production and assembly unit flow process length consuming time, manpower use frequent, the current allegro mode of production of incompatibility.
Summary of the invention
To the problem that exists in the above prior art, the invention provides the production limit assembly unit of a kind of limit, the steel-structure factory building roof production mechanism of quickness and high efficiency, and a kind of assembly unit auxiliary equipment.
The present invention realizes through following technical scheme:
First scheme of the present invention provides a kind of steel-structure factory building roof production mechanism.
Steel-structure factory building roof production mechanism comprises the colored steel forming press, and said production mechanism comprises that also one produces high platform, and said colored steel forming press is arranged to be produced on the high platform.
The high platform of said production is the height Collapsible structure.
The height of the high platform of said production is suitable with the eaves height.
Alternative plan of the present invention provides the auxiliary equipment of a kind of steel-structure factory building roof assembly unit.
The assembly unit auxiliary equipment of steel-structure factory building roof production mechanism, said auxiliary equipment is the color steel carriage, is laid on the steel extension circuit on roof.
Said color steel carriage be two with the suitable pulley of colored steel forming press exit width.
Said color steel carriage be two with the suitable pulley track of colored steel forming press exit width.
Beneficial effect of the present invention is: the novel production model that the production model of " production, assembly unit more earlier " in the prior art is changed to " limit production, limit assembly unit "; Utilize the high platform of production that the colored steel forming press is risen to certain altitude; The color steel of producing carries out the roof assembly unit immediately; Production procedure weak point consuming time, the moulding of steel work roof is quick, adapts to very much the allegro mode of production.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Among the figure: 1 is the colored steel forming press; 2 for producing high platform; 3 is eaves; 4 is pulley; 5 is pulley track; 6 is steel extension circuit.
The specific embodiment
Explain further details below in conjunction with accompanying drawing and specific embodiment ground the present invention.
The present invention provides a kind of steel-structure factory building roof production mechanism, and original directly ornaments through producing high platform 2, are increased to the position suitable with the height of eaves 3 at the colored steel forming press 1 on ground, is convenient to carry out the operation of " limit production, limit assembly unit ".Produce high platform 2 in the present invention and be the setting of height Collapsible structure, so just can make colored steel forming press 1 cooperate any height in controlled range to carry out the operation of " limit production, limit assembly unit ".
When using the present invention program; After producing the large-scale steel that are suitable for assembly unit on the high platform 2 of production; But also exist in the practical operation invar material amount huge; The problem of the difficulty that stretch to extend especially stretches steel when extending into the other end and laying, very effort from the end on roof along steel extension circuit 6.
Therefore; The present invention also provides the auxiliary equipment of a kind of steel-structure factory building roof assembly unit; Refer to a kind of color steel carriage, the present invention is laid in it on steel extension circuit 6 on roof, and general steel-structure factory building roof adopts the architecture mode of purlin as steel extension circuit 6 more.The color steel carriage can adopt two with the suitable pulley 4 of colored steel forming press 1 exit width, or two with the suitable pulley track 5 of colored steel forming press 1 exit width.Utilize the color steel carriage easily effortlessly the color steel of producing to be stretched and extend into whole roof surface.For the installation quantity and the mounting means of color steel carriage, can be configured according to different roof installation requirements.
The present invention changes to the production model of " production, assembly unit more earlier " in the prior art the novel production model of " limit production, limit assembly unit "; Utilize the high platform 2 of production that colored steel forming press 1 is risen to certain altitude; The color steel of producing carries out the roof assembly unit immediately; Production procedure weak point consuming time, the moulding of steel work roof is quick, adapts to very much the allegro mode of production.
Claims (6)
1. production mechanism in steel-structure factory building roof comprises the colored steel forming press, it is characterized in that said production mechanism comprises that also one produces high platform, and said colored steel forming press is arranged to be produced on the high platform.
2. steel-structure factory building according to claim 1 roof production mechanism is characterized in that the high platform of said production is the height Collapsible structure.
3. steel-structure factory building according to claim 1 and 2 roof production mechanism is characterized in that the height of the high platform of said production is suitable with the eaves height.
4. the assembly unit auxiliary equipment that is used for the described steel-structure factory building of claim 1 roof production mechanism is characterized in that said auxiliary equipment is the color steel carriage, is laid on the steel extension circuit on roof.
5. assembly unit auxiliary equipment according to claim 4, it is characterized in that said color steel carriage be two with the suitable pulley of colored steel forming press exit width.
6. claim requires 4 described assembly unit auxiliary equipment, it is characterized in that said color steel carriage be two with the suitable pulley track of colored steel forming press exit width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102884520A CN102359291A (en) | 2011-09-26 | 2011-09-26 | Roof production mechanism and assembling auxiliary equipment for steel structure plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102884520A CN102359291A (en) | 2011-09-26 | 2011-09-26 | Roof production mechanism and assembling auxiliary equipment for steel structure plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102359291A true CN102359291A (en) | 2012-02-22 |
Family
ID=45584666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102884520A Pending CN102359291A (en) | 2011-09-26 | 2011-09-26 | Roof production mechanism and assembling auxiliary equipment for steel structure plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102359291A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828633A (en) * | 2012-09-25 | 2012-12-19 | 刘宪武 | Comprehensive building of urban water plant |
CN104831877A (en) * | 2015-05-08 | 2015-08-12 | 河南卫特汽车起重机有限公司 | Aerial tile making vehicle and connecting rod balancing mechanism thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5983568A (en) * | 1997-05-15 | 1999-11-16 | N.E.M. Nord Est Meccanica S.N.C | Opening system for sliding glass doors of counters and display units for the sale of food products |
CN2522509Y (en) * | 2001-12-12 | 2002-11-27 | 华胤(厦门)钢业有限公司 | Roof covering metal plate mounting apparatus |
CN202299522U (en) * | 2011-09-26 | 2012-07-04 | 安徽鸿路钢结构(集团)股份有限公司 | Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same |
-
2011
- 2011-09-26 CN CN2011102884520A patent/CN102359291A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5983568A (en) * | 1997-05-15 | 1999-11-16 | N.E.M. Nord Est Meccanica S.N.C | Opening system for sliding glass doors of counters and display units for the sale of food products |
CN2522509Y (en) * | 2001-12-12 | 2002-11-27 | 华胤(厦门)钢业有限公司 | Roof covering metal plate mounting apparatus |
CN202299522U (en) * | 2011-09-26 | 2012-07-04 | 安徽鸿路钢结构(集团)股份有限公司 | Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828633A (en) * | 2012-09-25 | 2012-12-19 | 刘宪武 | Comprehensive building of urban water plant |
CN102828633B (en) * | 2012-09-25 | 2014-06-25 | 刘宪武 | Comprehensive building of urban water plant |
CN104831877A (en) * | 2015-05-08 | 2015-08-12 | 河南卫特汽车起重机有限公司 | Aerial tile making vehicle and connecting rod balancing mechanism thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101974971A (en) | Full automatic wall facing concrete injection system | |
CN203665693U (en) | Magnesite tile turnover and demolding device | |
CN203919320U (en) | A kind of concrete equating plucking all-in-one | |
CN201826508U (en) | Uneven-wall cement-based material equivalent-thickness spraying device | |
CN202299522U (en) | Production mechanism for steel-structural roof of factory building and auxiliary equipment for assembly for same | |
CN102359291A (en) | Roof production mechanism and assembling auxiliary equipment for steel structure plant | |
CN203559531U (en) | Metal roof forming and transportation integrated construction device | |
CN203526909U (en) | Special press fit device for skylight glass seal strips | |
CN202945576U (en) | Overall movement template device for subgrade drainage ditch construction | |
CN202787307U (en) | Foundation bolt positioning template | |
CN202299189U (en) | Steel structural plant roof assembling auxiliary equipment | |
CN208054817U (en) | A kind of mobile lifting platform | |
CN105464300A (en) | Roof production mechanism | |
CN202304430U (en) | Automatic feeding device of aluminum smelting furnace | |
CN204414300U (en) | Assembling die erecting device | |
CN102873751B (en) | Method for manufacturing exhaust passage | |
CN201998313U (en) | Novel concrete curing device | |
CN204879048U (en) | Novel pipeline support | |
CN204098328U (en) | A kind of light insulating brick | |
CN203863803U (en) | Cement brick making machine | |
CN202904312U (en) | Raising and lowering control device for thermoplastic plate heating equipment | |
CN203867149U (en) | Cementing machine | |
CN204295848U (en) | A kind of architectural prefab particular manufacturing craft | |
CN206881987U (en) | A kind of Quick Changeover fixtures for painting | |
CN203919136U (en) | The Fixed width edge-neatening apparatus of glass steel tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120222 |