CN202299479U - Noise reduction building structure containing equipment motor room - Google Patents

Noise reduction building structure containing equipment motor room Download PDF

Info

Publication number
CN202299479U
CN202299479U CN 201120428285 CN201120428285U CN202299479U CN 202299479 U CN202299479 U CN 202299479U CN 201120428285 CN201120428285 CN 201120428285 CN 201120428285 U CN201120428285 U CN 201120428285U CN 202299479 U CN202299479 U CN 202299479U
Authority
CN
China
Prior art keywords
building structure
room
machine room
concrete floor
equipment machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120428285
Other languages
Chinese (zh)
Inventor
刘鲁齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Langte Construction Science & Technology Co ltd
Original Assignee
Shanghai Langte Construction Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Langte Construction Science & Technology Co ltd filed Critical Shanghai Langte Construction Science & Technology Co ltd
Priority to CN 201120428285 priority Critical patent/CN202299479U/en
Application granted granted Critical
Publication of CN202299479U publication Critical patent/CN202299479U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a noise reduction building structure containing an equipment motor room. The equipment motor room is arranged on the underground first floor of the building structure. The building structure further comprises a residential room arranged on the equipment motor room. The building structure further comprises a plurality of concrete floor boards arranged between the equipment motor room and the residential room, and air interlayers are arranged between adjacent concrete floor boards. Due to the fact that the plurality of concrete floor boards are arranged between the equipment motor room and the residential room, the air interlayers are arranged between concrete floor boards, the noise generated by the equipment motor room can be controlled in required range, and the residential room arranged close to the equipment motor room cannot be affected.

Description

A kind of noise reduction building structure that includes equipment machine room
Technical field
The utility model relates to the architectural construction technical field, relates in particular to a kind of noise reduction building structure that includes equipment machine room.
Background technology
The utilization of green energy resource has brought great superiority for society and people's life, particularly to environmental protection and people healthy best guarantee is provided.In the last few years; Human in the constantly utilization of the exploratory development renewable energy resource; Though we have found that like new forms of energy such as solar energy, nuclear fusion energy, biological energy source, wind power energy, water conservancy ability, great waves ability, tide energy, underground heat energies; But because these energy belong to low-grade energy, these energy of development and utilization all need different techniques and equipment.Low grade heat energy all is everywhere in our life, and utilization has a extensive future.Reclaiming and utilizing the most effective means of low grade heat energy is heat pump techniques, and research and extension using heat pump technology is extremely important for energy conservation, protection environment, alleviating energy crisis.At present, along with the development of central air-conditioning technology, geothermal heat pump air-conditioner has obtained using widely in civilian construction such as dwelling house, hotel because of advantages such as its energy-conserving and environment-protective.
The essence of ground source heat pump technology is to utilize trepan to hole at the earth; In the hole, bury the U type pipe of processing, be called on the specialty ground heat exchanger by the PE plastics then underground; In ground heat exchanger, inject heat transferring medium afterwards; Heat transferring medium is generally water; Absorb heat or cold through the interchange of heat between this heat transferring medium and the earth from the earth, heat transferring medium offers the refrigerant in the earth source heat pump unit with this heat or the cold mode through interchange of heat then, and the earth source heat pump unit will pass through and heat up after the interchange of heat or the refrigerant of cooling offers the air-conditioner that is installed in the interior space afterwards; This refrigerant will carry out interchange of heat with the air of the interior space in air-conditioner, thereby the interior space is remained under the suitable temperature.Because land supply is limited,, usually the earth source heat pump machine room is placed on the B1 of building monomer for saving floor space.Therefore resident family near machine room can receive interference of noise, in order to reduce vibration equipment to indoor influence of noise, in most cases adopts the measure of the vibration isolation efficiency that improves shock absorber, yet unsatisfactory to the control effect of noise like this.
The utility model content
The utility model technical problem to be solved has provided a kind of noise reduction building structure that includes equipment machine room, the interference problem that the noise that produces with the solution equipment machine room brings.
In order to solve the problems of the technologies described above; The technical scheme of the utility model is: a kind of noise reduction building structure that includes equipment machine room is provided; Equipment machine room is positioned at the B1 of building structure; Said building structure comprises that also dwelling house uses the room, and said dwelling house is positioned on the said equipment machine room with the room, and said building structure also comprises: the multi-layer concrete floor; Said multi-layer concrete floor is arranged on said equipment machine room and said dwelling house with between the room, has air blanketing between the adjacent said concrete floor.
Further, said multi-layer concrete floor is two-layer.
Further, the thickness of every layer of said concrete floor is 190mm~200mm.
Further, the thickness of said air blanketing is 80mm~100mm.
The noise reduction building structure that includes equipment machine room that the utility model provides; Between equipment machine room and dwelling house are with the room, the multi-layer concrete floor is set; And has air blanketing between every layer of said concrete floor; The multi-layer concrete floor and between the air blanketing that has, the noise control that can equipment machine room be produced makes its unlikely influence use the room near the dwelling house of equipment machine room setting in the scope that requires.
Description of drawings
Fig. 1 is the cross-sectional view of the noise reduction building structure that includes equipment machine room that provides of the utility model embodiment.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment further explain is done in a kind of noise reduction building structure that includes equipment machine room that the utility model proposes.According to following explanation and claims, advantage of the utility model and characteristic will be clearer.What need explanation is, accompanying drawing all adopts the form of simplifying very much and all uses non-ratio accurately, only is used for conveniently, the purpose of aid illustration the utility model embodiment lucidly.
The core concept of the utility model is; The noise reduction building structure that includes equipment machine room that provides; Between equipment machine room and dwelling house are with the room, the multi-layer concrete floor is set, and has air blanketing between every layer of said concrete floor, the multi-layer concrete floor and between the air blanketing that has; The noise control that can equipment machine room be produced makes its unlikely influence use the room near the dwelling house of equipment machine room setting in the scope that requires.
Fig. 1 is the cross-sectional view of the noise reduction building structure that includes equipment machine room that provides of the utility model embodiment.With reference to Fig. 1; A kind of noise reduction building structure that includes equipment machine room, equipment machine room 11 is positioned at the B1 of building structure, and said building structure comprises that also dwelling house is with room 12; Said dwelling house is positioned on the said equipment machine room 11 with room 12; Said building structure also comprises: multi-layer concrete floor 13, said multi-layer concrete floor 13 are arranged on said equipment machine room 11 and said dwelling house with between the room 12, have air blanketing 14 between the adjacent said concrete floor 13.
In the present embodiment; Multi-layer concrete floor 13 is two-layer; The thickness of concrete floor 13 is 190mm~200mm; The thickness of the air blanketing 14 that has between the two-layer concrete floor 13 is 80mm~100mm; Dwelling house with room 12 be positioned at said equipment machine room 11 directly over, the noise control that can equipment machine room 11 be produced through the air blanketing 14 that has between two-layer concrete floor 13 and the two-layer concrete floor 13 makes the dwelling house of its unlikely influence above equipment machine room 11 with room 12 in the scope that requires.
In addition; The top board arrangement design of equipment machine room 11 also needs beam (not shown) and post 15, relies on beam and column 15 as supporting, and to guarantee the air blanketing 14 between the concrete floor 13 certain thickness can be arranged; In the present embodiment, said equipment machine room 11 is the earth source heat pump machine room.
Obviously, those skilled in the art can carry out various changes and modification to utility model and not break away from the spirit and the scope of the utility model.Like this, belong within the scope of the utility model claim and equivalent technologies thereof if these of the utility model are revised with modification, then the utility model also is intended to comprise these changes and modification interior.

Claims (4)

1. noise reduction building structure that includes equipment machine room; Equipment machine room is positioned at the B1 of building structure, and said building structure comprises that also dwelling house uses the room, and said dwelling house is positioned on the said equipment machine room with the room; It is characterized in that; Also comprise: multi-layer concrete floor, said multi-layer concrete floor are arranged on said equipment machine room and said dwelling house with between the room, have air blanketing between the adjacent concrete floor.
2. the noise reduction building structure that includes equipment machine room according to claim 1 is characterized in that said multi-layer concrete floor is two-layer.
3. the noise reduction building structure that includes equipment machine room according to claim 1 is characterized in that the thickness of every layer of said concrete floor is 190mm~200mm.
4. the noise reduction building structure that includes equipment machine room according to claim 1 is characterized in that the thickness of said air blanketing is 80mm~100mm.
CN 201120428285 2011-11-02 2011-11-02 Noise reduction building structure containing equipment motor room Expired - Fee Related CN202299479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120428285 CN202299479U (en) 2011-11-02 2011-11-02 Noise reduction building structure containing equipment motor room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120428285 CN202299479U (en) 2011-11-02 2011-11-02 Noise reduction building structure containing equipment motor room

Publications (1)

Publication Number Publication Date
CN202299479U true CN202299479U (en) 2012-07-04

Family

ID=46368405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120428285 Expired - Fee Related CN202299479U (en) 2011-11-02 2011-11-02 Noise reduction building structure containing equipment motor room

Country Status (1)

Country Link
CN (1) CN202299479U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421638A (en) * 2015-12-03 2016-03-23 中国航空规划设计研究总院有限公司 Hung interlayer structure and construction method thereof
CN105972802A (en) * 2016-05-25 2016-09-28 上海市安装工程集团有限公司 Vibration isolation noise reduction type air conditioner system for floating building and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421638A (en) * 2015-12-03 2016-03-23 中国航空规划设计研究总院有限公司 Hung interlayer structure and construction method thereof
CN105421638B (en) * 2015-12-03 2017-07-04 中国航空规划设计研究总院有限公司 One kind suspension sandwich and its construction method
CN105972802A (en) * 2016-05-25 2016-09-28 上海市安装工程集团有限公司 Vibration isolation noise reduction type air conditioner system for floating building and installation method thereof

Similar Documents

Publication Publication Date Title
Soni et al. Ground coupled heat exchangers: A review and applications
Cheng et al. Application research on the closed-loop heat-source-tower heat pump air conditioning system in hot-summer and cold-winter zone
Zhai et al. Experimental investigation and performance analysis of a ground-coupled heat pump system
CN202304084U (en) Horizontal buried pipe type ground source heat pump water heating and air conditioning system
CN202299479U (en) Noise reduction building structure containing equipment motor room
CN201531964U (en) Water circulation ground-source air-conditioning system
CN202973660U (en) Energy storage circulating system of underground aquifer structural layer
CN206222570U (en) Earth-source hot-pump system based on drainage and anti-float basis
CN102692097A (en) Energy storage circulating system for underground water-containing structural layer
CN203669126U (en) Noise reduction building structure with equipment machine room
CN204240510U (en) The outdoor rectilinear pipe laying system of a kind of earth source heat pump
Ni et al. Groundwater heat pump with pumping and recharging in the same well in China
CN205783245U (en) A kind of solar energy, air can ground source heating cooling systems
CN205677537U (en) One well porous type deep geothermal heat energy heat exchanger mounting shaft room
Zhang et al. Comparative analysis of low-energy buildings to help achieve carbon neutrality technology
CN211523707U (en) Energy-saving heat-insulating roof
CN202008183U (en) Floor coil indoor floor radiant heating device
Lu et al. The analysis and simulation on operating characteristics of GSHP in summer
CN203454324U (en) House cooling device
Shi et al. Study on Thermal Behavior of an Experimental Low-energy Building in the Hot Summer and Cold Winter Zone of China
Sun et al. The application of renewable energy in the building energy efficiency
Man et al. Application Study of Novel Hybrid Source Heating Mode with Low Energy Consumption for China
Yafan et al. Building Energy System Based on Capillary Mats
Zhang et al. Influencing Factors on Ground Heat Balance of GSHP System
CN202755476U (en) Geothermal type civil building thermal insulation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20191102

CF01 Termination of patent right due to non-payment of annual fee