CN202297648U - Air dispensation control devices for blast furnace blower system - Google Patents

Air dispensation control devices for blast furnace blower system Download PDF

Info

Publication number
CN202297648U
CN202297648U CN2011204028544U CN201120402854U CN202297648U CN 202297648 U CN202297648 U CN 202297648U CN 2011204028544 U CN2011204028544 U CN 2011204028544U CN 201120402854 U CN201120402854 U CN 201120402854U CN 202297648 U CN202297648 U CN 202297648U
Authority
CN
China
Prior art keywords
blast furnace
wind turning
air
wind
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204028544U
Other languages
Chinese (zh)
Inventor
杨婷
阮祥志
赵航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN2011204028544U priority Critical patent/CN202297648U/en
Application granted granted Critical
Publication of CN202297648U publication Critical patent/CN202297648U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

The utility model discloses air dispensation control devices for a blast furnace blower system, which adopt that structure that a plurality of the air dispensation control devices are provided, and a blower (1) and an electric motor (2) which are used in conjunction with the blast furnace air supply are arranged on each air dispensation control device; a check valve (3), a muffler (4), a flowmeter (5) and an electric air supply butterfly valve (6) which are arranged in sequence are in tandem connection with an outlet pipeline of each blower (1); the muffler (4) supplies air to each blower; the electric air supply butterfly valve (6) is connected with cold air pipes of blast furnaces through branching pipelines; one communicating electric butterfly valve (7) is installed on each branching pipeline; and therefore, an air dispensation channel is formed. The air dispensation control devices are suitable for a system that adopts four blast furnace blowers to supply air to three blast furnaces, can control the mutual air dispensation when different systems operate, and have the advantages of effectively ensuring safety production of the blast furnaces, reducing the rate of accidents that slags enter the blast furnaces and so on.

Description

The wind turning gear of Blast Furnace Blower System
Technical field
The utility model relates to the system field, particularly the wind turning gear of Blast Furnace Blower System.
Background technology
In smelter, blast furnace blowing engine is a gas compression machinery from required cold wind to the supply of iron work blast furnace that smelt, is called as " heart " of blast furnace system.If to the cold wind of blast furnace supply because the catastrophic failure or the mishandle of air feed system; And take place sudden and unexpected interruption Unpredictability; With causing the air port to irritate the major accident of slag, also will cause the tremendous economic loss, and also can make the major injury of blast furnace own to enterprise.What is more, causes that blast furnace gas flows backwards and blast if shut down because of blower fan, will the direct threats person and the safety of equipment.Therefore, reliable and stable air dispensation system be guarantee that blast furnace is normal, the prerequisite of safety, stably manufactured.
Mostly existing blast furnace air dispensation system is 1 pair 1, and SF is not enough, sometimes because the system device action is untimely, still exists blast furnace to irritate danger such as slag.
Summary of the invention
The utility model technical problem to be solved is: the wind turning gear that a kind of Blast Furnace Blower System is provided; The control of mutual wind turning when this wind turning gear can be realized different blast furnace operation, and can guarantee the blast furnace safety in production effectively, reduce blast furnace and irritate the slag casualty ratio of accidents.
Technical scheme below its technical problem that solves the utility model adopts:
The wind turning gear of the Blast Furnace Blower System that the utility model provides, its structure is: this wind turning gear has a plurality of, and each wind turning gear is equipped with and blast furnace blow matching used gas blower and phonomoter; Be serially connected with the vacuum breaker that is arranged in order on the outlet conduit of every gas blower, be sourdine, under meter and the air-supply electric butterfly valve of blower fan air-supply; The air-supply electric butterfly valve connects the cold-air duct of each blast furnace through lateral; 1 connection electric butterfly valve is installed on the every lateral, constitutes the wind turning passage thus.
Said wind turning gear has 3, is used for the system of 4 blast furnace blowing engines to 3 blast furnace air feeds.
Described 3 wind turning gear, they are communicated with 3 cold blast pipelines in twos.
In the place that described lateral links to each other with cold-air duct, the bend pipe pressure balance loop expansion pipe can be installed.
Described bend pipe pressure balance loop expansion pipe adopts U type project organization, is equipped with in the bend of U type structure to be attached thereto 2 logical wind turnings and to cut off butterfly valves and 1 wind turning variable valve, and the wind turning variable valve cuts off between the butterfly valve 2 wind turnings.
The normally open that butterfly valve keeps certain valve position is cut off in described wind turning, and flow can be not excessive during with the restriction wind turning, in order to avoid the blast furnace that is about to wind turning is produced the movie star, when needing wind turning, the wind turning variable valve is got to full-gear rapidly on this pipeline.
Described wind turning variable valve can adopt and can keep the two-way full-shut position that sealed gas 0 leaks more than 7 grades at ordinary times, can get to the wind turning variable valve of full-gear when needing wind turning rapidly.
The utility model compared with prior art has following main beneficial effect:
1. under the limiting case,, can guarantee that an air dispensation system that is far more than can carry out the wind turning action simultaneously to two blast furnaces, farthest guarantees the blast furnace production safety if the air-blast system of two blast furnaces is out of order simultaneously;
2. can guarantee that any typhoon machine still also has a typhoon machine that the wind turning service can be provided at least in the system when maintenance;
3. all there are two trip valves to be in certain aperture (30%) limited flow in can be before and after the wind turning valve of each air dispensation system, are used for avoiding the too big and influence that the production of other blast furnaces self is caused of air quantity fluctuation when the wind turning valve is opened (standard-sized sheet) soon when wind turning.
4. the control of wind turning variable valve design adopts circuit and gas circuit d.a. to control, and the SV of this valve is in uncharged state at ordinary times, has effectively solved SV and has been in electriferous state for a long time and influences work-ing life.Valve is received action command, and SV gets electric, and system's gas circuit is connected; Valve cylinder inflation, valve reaches full-gear in 10s, if this moment suddenly dead electricity, when losing gas (emergency case); Lean on the pressurized air that is full of in the cylinder can make valve guarantee aperture at that time; This design has solved circuit or gas circuit control merely in the past, if the disadvantage of unexpected dead electricity, the mistake air valve unexpected standard-sized sheet of meeting or complete shut-down makes system safer.
In a word; The utility model is applicable to the system of 4 blast furnace blowing engines to 3 blast furnace air feeds; The control of mutual wind turning in the time of can realizing the different system operation has realized the operation of 1 pair of n air dispensation system, has farthest guaranteed advantages such as blast furnace safety in production, reduction blast furnace filling slag casualty ratio of accidents.
Description of drawings
Fig. 1 is the wind turning gear structural representation of the Blast Furnace Blower System of the utility model employing.
Fig. 2 is the layout synoptic diagram of wind turning gear equipment.
Fig. 3 be with 1# and 2# blast furnace blower break down simultaneously (3# blast furnace blower works better) be the schema of example.
Fig. 4 is the synoptic diagram of the utility model according to the layout of parallel cold air duct direction.
Fig. 5 is the synoptic diagram of the utility model according to the layout of vertical cold air duct direction.
Among the figure: 1. gas blower; 2. phonomoter; 3. vacuum breaker; 4. sourdine; 5. under meter; 6. air-supply electric butterfly valve; 7. connection electric butterfly valve; 8. butterfly valve is cut off in wind turning; 9. wind turning variable valve; 10. the cold air duct that connects the 1# blast furnace; 11. connect the cold air duct of 2# blast furnace; 12. connect the cold air duct of 3# blast furnace; 13. bend pipe pressure balance loop expansion pipe.
Embodiment
Below in conjunction with embodiment and accompanying drawing the utility model is described further.
The wind turning gear of the Blast Furnace Blower System that the utility model provides, its structure is as shown in Figure 1: air dispensation system is communicated with 3 blast furnaces, totally 4 gas blowers 1 and auxiliary motor 2.On every blower export pipeline vacuum breaker 3 is installed; Vacuum breaker 3 backs are the sourdine 4 of blower fan air-supply; Sourdine 4 back are equipped with under meter 5; Under meter 5 back are equipped with air-supply electric butterfly valve 6, owing to will realize that many typhoons machine send many blast furnaces, 3 connection electric butterfly valves 7 are housed respectively behind the air-supply electric butterfly valve 6 in each wind turning gear.Pipeline behind the connection electric butterfly valve 7 connects the cold air duct of each blast furnace respectively, and totally 3 is respectively cold air duct 10, the cold air duct 11 that connects the 2# blast furnace that connects the 1# blast furnace, the cold-air duct 12 that connects the 3# blast furnace.
Present embodiment adopts 3 wind turning gear, is communicated with 3 cold blast pipelines in twos, and the wind turning pipe diameter is DN600 (or decide according to practical situation); Have 2 wind turnings to cut off 8,1 wind turning variable valve 9 of butterfly valve on each air dispensation system, the normally open that butterfly valve keeps certain valve position (valve plate valve position 30%) is cut off in wind turning; Flow can be not excessive during with the restriction wind turning; In order to avoid the blast furnace production working of a furnace that is about to wind turning is exerted an influence, when needing wind turning, the wind turning variable valve is got to full-gear rapidly on this pipeline.
The place that the wind turning pipeline links to each other with cold air duct is equipped with bend pipe pressure balance loop expansion pipe 13, to satisfy the needs of pipe thermal compensation, adopts U type design (Fig. 2).
Said wind turning variable valve 9 should adopt to keep the two-way full-shut position that sealed gas 0 leaks more than 7 grades at ordinary times, in order to avoid the blast furnace ordinary production is exerted an influence; When needing wind turning, the wind turning variable valve 9 that is contained on the pipeline can be got to full-gear rapidly.For this reason, the control of this wind turning variable valve design adopts circuit and gas circuit d.a. to control, and the SV of this valve is in uncharged state at ordinary times, has effectively solved SV and has been in electriferous state for a long time and influences work-ing life.Valve is received action command, and SV gets electric, and system's gas circuit is connected; Valve cylinder inflation, valve reaches full-gear in 10s, if this moment suddenly dead electricity, when losing gas (emergency case); Lean on the pressurized air that is full of in the cylinder can make valve guarantee aperture at that time; This design has solved circuit or gas circuit control merely in the past, if the disadvantage of unexpected dead electricity, the mistake air valve unexpected standard-sized sheet of meeting or complete shut-down makes system safer.
The model that said wind turning variable valve 9 can adopt TYCO Influent Corp. to produce is a D643H-16P wind turning variable valve.
The wind turning gear of the Blast Furnace Blower System that the utility model provides, it is used for different Blast Furnace Blower System are carried out wind turning control.
When the utility model carried out wind turning control to different Blast Furnace Blower System, concrete steps comprised:
1. wind turning condition:
With 3 blast furnaces, 3 cold-air ducts, 4 typhoon machines (the 4# blower fan is subsequent use) and 3 supporting wind turning gear is example, when the needs wind turning, should detect the wind turning gear and whether satisfy following three conditions, if then carry out wind turning.
(1) vacuum breaker 3 of fault blower fan closes;
(2) side of wind turning variable valve 9 promptly by wind turning one wall pressure less than 150Kpa;
(3) the opposite side pressure of wind turning variable valve 9 is that wind turning one wall pressure is greater than 250Kpa.
2. concrete operations:
If the blower fan of 2 blast furnaces breaks down simultaneously, this moment, the vacuum breaker of this 2 typhoon machine outlet closed, and then other 1 cold-air duct is simultaneously to 2 blast furnace wind turnings, and concrete steps are following:
Referring to Fig. 3 to Fig. 5, during 3 blast furnace ordinary production, 3 vacuum breaker are opened in 4 vacuum breaker, at this moment:
Step 1: if 2 typhoon machines break down, then vacuum breaker 3 passes of 2 typhoon machines, and this vacuum breaker are not in manual state, have 3 closure of check ring, and this is first signal, detect the corresponding cold-air duct upward pressures of 2 blower fans this moment and whether are lower than 150Kpa;
Step 2: if first signal detecting result is lower than 150KPa, this is second signal, whether then detects other 1 cold-air duct pressure greater than 250Kpa;
Step 3: when detecting the 3rd signal, if other 1 cold-air duct pressure greater than 250KPa, the then blast furnace wind turning to breaking down simultaneously because of 2 typhoon machines.
The effect of above-mentioned first signal, second signal and the 3rd signal is ditto chatted.
3. handle during blast furnace staying:
Each wind turning gear all should be provided with manual and automatic two states; When certain blast furnace staying; 2 air dispensation systems are all got to manual state on 2 wind turning pipes that this blast furnace links to each other; This moment, the wind turning gear did not read the correlation parameter of this wind turning variable valve, thought that this blower fan normally cuts out, and it was not carried out the wind turning operation.
4. blast furnace is decided to handle when air quantity is decided blast production:
When the wind turning of wind turning gear, require to provide a wind turning signal fan system, this signal provides through hardwire, receive this signal blower fan automatically cancellation decide air quantity and decide the blast state.
The result of use of the utility model: show that according to tune-up data after receiving correct signal, wind turning variable valve 9 can be got to full-gear rapidly at 10s in the time, realize the wind turning operation; In the process of wind turning operation,, unexpected dead electricity all can keep aperture at that time if losing air valve.

Claims (6)

1. the wind turning gear of a Blast Furnace Blower System, it is a plurality of to it is characterized in that this wind turning gear has, and each wind turning gear is equipped with and blast furnace blow matching used gas blower (1) and phonomoter (2); Be serially connected with the vacuum breaker (3), sourdine (4), under meter (5) and the air-supply electric butterfly valve (6) that are arranged in order on the outlet conduit of every gas blower (1) for the blower fan air-supply; Air-supply electric butterfly valve (6) connects the cold-air duct of each blast furnace through lateral; 1 connection electric butterfly valve (7) is installed on the every lateral, constitutes the wind turning passage thus.
2. the wind turning gear of Blast Furnace Blower System according to claim 1 is characterized in that this wind turning gear has 3, is used for the system of 4 blast furnace blowing engines to 3 blast furnace air feeds.
3. the wind turning gear of Blast Furnace Blower System according to claim 2 is characterized in that described 3 wind turning gear, and they are communicated with 3 cold blast pipelines in twos.
4. the wind turning gear of Blast Furnace Blower System according to claim 1 is characterized in that the place that lateral links to each other with cold-air duct is equipped with bend pipe pressure balance loop expansion pipe (13).
5. the wind turning gear of Blast Furnace Blower System according to claim 4; It is characterized in that bend pipe pressure balance loop expansion pipe (13) adopts U type project organization; Be equipped with in the bend of U type structure and be attached thereto 2 logical wind turnings and cut off butterfly valve (8) and 1 wind turning variable valve (9), wind turning variable valve (9) is positioned between 2 wind turnings cut-out butterfly valves (8).
6. the wind turning gear of Blast Furnace Blower System according to claim 5; It is characterized in that wind turning variable valve (9) adopts the full-shut position that can keep two-way sealed gas 0 leakage more than 7 grades at ordinary times, can get to the wind turning variable valve of full-gear rapidly when needing wind turning.
CN2011204028544U 2011-10-21 2011-10-21 Air dispensation control devices for blast furnace blower system Expired - Fee Related CN202297648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204028544U CN202297648U (en) 2011-10-21 2011-10-21 Air dispensation control devices for blast furnace blower system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204028544U CN202297648U (en) 2011-10-21 2011-10-21 Air dispensation control devices for blast furnace blower system

Publications (1)

Publication Number Publication Date
CN202297648U true CN202297648U (en) 2012-07-04

Family

ID=46366584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204028544U Expired - Fee Related CN202297648U (en) 2011-10-21 2011-10-21 Air dispensation control devices for blast furnace blower system

Country Status (1)

Country Link
CN (1) CN202297648U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337368A (en) * 2011-10-21 2012-02-01 中冶南方工程技术有限公司 Air dispensation control systems for air blowing systems of blast furnaces

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337368A (en) * 2011-10-21 2012-02-01 中冶南方工程技术有限公司 Air dispensation control systems for air blowing systems of blast furnaces

Similar Documents

Publication Publication Date Title
CN102344980B (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN201971852U (en) Automatic fanning device for two blast furnaces having different volumes
CN204647852U (en) Compressor dry gas seals nitrogen gas supply system and there is its methanol device
CN202297637U (en) Control device for realizing mutual air distribution during operation of air supply systems of different blast furnaces
CN202297648U (en) Air dispensation control devices for blast furnace blower system
CN201990692U (en) Automatic air dispensation system of multiple blast furnace blowers
CN203756630U (en) Novel sliding nozzle hydraulic control system
CN202297647U (en) Air dispensation control device for supplying air to two-seat blast furnace
CN102344979A (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN102344978A (en) System for realizing control of mutual air dispensation in operation process of air supply systems of different blast furnaces
CN102337367B (en) Air distributing control method for blast furnace blower system
CN211367609U (en) Blast furnace fan system
CN103266193A (en) Wind transfer security system
CN202297638U (en) Air dispensation control device for blast furnace blast system in metallurgical enterprise
CN113090952B (en) Opening assisting device for check valve of large blast furnace blower unit and operation method
CN202201913U (en) Air volume coadjutant security slag-pouring preventing device for a plurality of blast furnaces
CN102337368A (en) Air dispensation control systems for air blowing systems of blast furnaces
CN207334244U (en) A kind of liquid ammonia ball tank safety interlock
CN201106056Y (en) Multifunctional multidirectional intelligent air supplying-dispensing device
CN216382098U (en) Furnace hydraulic system with standby function
CN215593102U (en) Automatic air distributing device of blast furnace fan
CN101658926B (en) Hydraulic control system of tundish water gap of continuous casting machine
CN207362271U (en) A kind of dial device for being used to improve blast furnace blower air feed reliability
CN207632830U (en) A kind of blast furnace control system of list main pipe
CN203322439U (en) Quick cutting-off control device of electrically operated valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20121021