CN202257990U - Combined table for transformer verification simulation training - Google Patents

Combined table for transformer verification simulation training Download PDF

Info

Publication number
CN202257990U
CN202257990U CN2011203524871U CN201120352487U CN202257990U CN 202257990 U CN202257990 U CN 202257990U CN 2011203524871 U CN2011203524871 U CN 2011203524871U CN 201120352487 U CN201120352487 U CN 201120352487U CN 202257990 U CN202257990 U CN 202257990U
Authority
CN
China
Prior art keywords
transformer
mutual inductor
cabinet
simulation training
installing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203524871U
Other languages
Chinese (zh)
Inventor
吴琦
黄永聪
李映辉
陈勇
宋天斌
钱进
张蓬鹤
沈杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Nari Co Ltd of State Grid Electric Power Research Institute
Training Center of State Grid Anhui Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Wuhan Nari Co Ltd of State Grid Electric Power Research Institute
Anhui Electrical Engineering Professional Technique College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Nari Co Ltd of State Grid Electric Power Research Institute, Anhui Electrical Engineering Professional Technique College filed Critical Wuhan Nari Co Ltd of State Grid Electric Power Research Institute
Priority to CN2011203524871U priority Critical patent/CN202257990U/en
Application granted granted Critical
Publication of CN202257990U publication Critical patent/CN202257990U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本实用新型公开了一种互感器检定仿真实训组合台,包括:电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器、试验变压器和内部为中空结构的柜体,所述电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器和试验变压器设置在柜体内,所述电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器和试验变压器的操作面板设置在所述柜体的台面上,所述台面上还设有标准互感器安装面和被试互感器安装面,所述标准互感器安装面和被试互感器安装面上设有用于连接互感器的互感器接线柱,所述互感器接线柱与所述柜体内设备相对应连接形成互感器检定线路。本实用新型具有结构简单,操作方便且使用安全等特点。适用于互感器检定仿真实训。

Figure 201120352487

The utility model discloses a transformer verification simulation training combined platform, which comprises: a voltage and current transformer load box, a transformer calibrator, a voltage regulation control box, a current booster, a test transformer and a cabinet with a hollow structure inside , the voltage and current transformer load box, transformer calibrator, voltage regulation control box, current booster and test transformer are arranged in the cabinet, the voltage and current transformer load box, transformer calibrator, voltage regulation control The operation panels of the box, the current booster and the test transformer are set on the table of the cabinet body, and the table is also equipped with a standard transformer installation surface and a tested transformer installation surface, and the standard transformer installation surface and the tested transformer are installed on the table. The installation surface of the test transformer is provided with a transformer terminal for connecting the transformer, and the transformer terminal is correspondingly connected with the equipment in the cabinet to form a transformer verification circuit. The utility model has the characteristics of simple structure, convenient operation and safe use. It is suitable for transformer verification simulation training.

Figure 201120352487

Description

互感器检定仿真实训组合台Transformer verification simulation training combination platform

技术领域 technical field

本实用新型涉及一种互感器检定仿真实训设备,特别涉及一种互感器检定仿真实训组合台。The utility model relates to a transformer verification simulation training equipment, in particular to a transformer verification simulation training combination platform.

背景技术 Background technique

在本实用新型提出之前,随着智能电网技术的投入以及计量监督管理制度的不断完善,对计量检定人员的专业技能有了更高、更具体的要求。近年来从事电能计量检定工作的人员不断增加,但是知识更新慢、检定人员专业知识和工作水平参差不齐,复合型人才偏少。为建设资源节约型社会提供良好的计量技术支撑,确保电能量值传递准确、一致、可靠,必须切实提高电能计量检定人员的业务素质和专业技能工作水平。Before the utility model was put forward, with the investment of smart grid technology and the continuous improvement of the measurement supervision and management system, there were higher and more specific requirements for the professional skills of the measurement and verification personnel. In recent years, the number of personnel engaged in the verification of electric energy measurement has been increasing, but the knowledge update is slow, the professional knowledge and work level of the verification personnel are uneven, and there are few interdisciplinary talents. To provide good measurement technical support for building a resource-saving society and ensure accurate, consistent, and reliable transmission of electric energy values, it is necessary to effectively improve the professional quality and professional skills of electric energy measurement and verification personnel.

目前,国内各个电力计量培训机构,在进行互感器检定培训时,大都在教室进行理论课教学,在试验室进行现场接线。在进行理论培训时无法进行边讲课边操作方式的培训,理论培训效果不佳。试验室的互感器检定仿真实训设备一般包括电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器、试验变压器、精密电压互感器、精密电流互感器和若干被试互感器;这些器件一般都是零散的放置在试验室内,在进行实践培训过程中,所有器件必须接入电力线路中进行接线和拆线,操作非常麻烦,且零散放置的器件占用空间较大;特别是,电流互感器接线时,必须将电流互感器穿入电力线路中,操作复杂。At present, most domestic electric power measurement training institutions carry out theoretical teaching in classrooms and on-site wiring in laboratories when conducting transformer verification training. During the theoretical training, it is impossible to carry out training in the way of teaching while operating, and the effect of theoretical training is not good. The transformer verification simulation training equipment in the laboratory generally includes voltage and current transformer load boxes, transformer calibrators, voltage regulation control boxes, current boosters, test transformers, precision voltage transformers, precision current transformers and several tested Transformer: These devices are generally scattered in the laboratory. During the practical training process, all devices must be connected to the power line for wiring and disconnection. The operation is very troublesome, and the scattered devices take up a lot of space; In particular, when wiring the current transformer, the current transformer must be inserted into the power line, and the operation is complicated.

发明内容 Contents of the invention

为了解决现有技术中由于所有器件均零散的放置在试验室内,导致实践培训操作非常复杂且占用空间大的问题,本实用新型提供了一种互感器检定仿真实训组合台。所述技术方案如下:In order to solve the problem in the prior art that the practice training operation is very complicated and takes up a lot of space because all the devices are placed scatteredly in the laboratory, the utility model provides a transformer verification simulation training combination platform. Described technical scheme is as follows:

一种互感器检定仿真实训组合台,包括:电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器、试验变压器和内部为中空结构的柜体,所述电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器和试验变压器设置在柜体内,所述电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器和试验变压器的操作面板设置在所述柜体的台面上,所述柜体的台面上还设置有标准互感器安装面和被试互感器安装面,所述标准互感器安装面和被试互感器安装面上设置有用于连接互感器的互感器接线柱,所述互感器接线柱与所述柜体内设备相对应连接形成互感器检定线路。A combination platform for transformer verification and simulation training, comprising: a voltage and current transformer load box, a transformer calibrator, a voltage regulation control box, a current booster, a test transformer and a cabinet with a hollow structure inside. Transformer load box, transformer calibrator, voltage regulation control box, current booster and test transformer are arranged in the cabinet, the voltage and current transformer load box, transformer calibrator, voltage regulation control box, current booster and the operation panel of the test transformer are set on the table top of the cabinet, and the table of the cabinet is also provided with a standard transformer installation surface and a tested transformer installation surface, and the standard transformer installation surface and the tested transformer The transformer installation surface is provided with a transformer terminal for connecting the transformer, and the transformer terminal is correspondingly connected with the equipment in the cabinet to form a transformer verification circuit.

上述方案中,所述标准互感器安装面的数量至少为一个,所述被试互感器安装面的数量至少为一个,该标准互感器安装面和被试互感器安装面的数量根据实际仿真实训需要设计。In the above scheme, the number of the standard transformer installation surface is at least one, and the number of the tested transformer installation surface is at least one, and the number of the standard transformer installation surface and the tested transformer installation surface is based on the actual simulation. Training needs to be designed.

上述方案中,所述标准互感器安装面为两个,每个标准互感器安装面上分别设置有一个精密互感器安装板,所述互感器接线柱布置在该精密互感器安装板上,该精密互感器安装板的数量根据实际仿真实训需要设计。In the above solution, there are two standard transformer mounting surfaces, and a precision transformer mounting plate is provided on each standard transformer mounting surface, and the transformer terminal is arranged on the precision transformer mounting plate. The number of precision transformer mounting plates is designed according to the actual simulation training needs.

上述方案中,所述被试互感器安装面为两个,每个被试互感器安装面上分别设置有至少一个被试互感器安装板,所述互感器接线柱布置在该被试互感器安装板上,该被试互感器安装板的数量根据实际仿真实训需要设计。In the above scheme, there are two mounting surfaces of the tested transformer, and each installed surface of the tested transformer is respectively provided with at least one tested transformer mounting plate, and the transformer terminal is arranged on the tested transformer. On the mounting plate, the number of mounting plates of the tested transformer is designed according to the actual simulation training needs.

上述方案中,所述精密互感器安装板为精密电压互感器安装板或/和精密电流互感器安装板,该精密互感器安装板的种类根据实际仿真实训需要设计。In the above solution, the precision transformer mounting plate is a precision voltage transformer mounting plate or/and a precision current transformer mounting plate, and the type of the precision transformer mounting plate is designed according to the actual simulation training needs.

上述方案中,所述被试互感器安装板为被试电压互感器安装板或/和被试电流互感器安装板,该被试互感器安装板的种类根据实际仿真实训需要设计。In the above solution, the tested transformer mounting board is the tested voltage transformer mounting board or/and the tested current transformer mounting board, and the type of the tested transformer mounting board is designed according to the actual simulation training needs.

上述方案中,所述柜体的台面上还设有总电源接线柱和接地接线柱,该总电源接线柱和接地接线柱接入所述互感器检定线路中,为本装置提供电源。In the above scheme, the main power terminal and the grounding terminal are also provided on the table of the cabinet, and the total power terminal and the grounding terminal are connected to the transformer verification circuit to provide power for the device.

上述方案中,所述柜体的台面上还设有电源空开,该电源空开接入所述互感器检定线路中。In the above solution, a power switch is also provided on the table of the cabinet, and the power switch is connected to the test circuit of the transformer.

上述方案中,所述柜体的台面上还设有报警器,该报警器接入所述互感器检定线路中起警示作用,以便一旦出现意外能尽早发现。In the above scheme, an alarm is also provided on the table of the cabinet, and the alarm is connected to the test circuit of the transformer to play a warning function, so that an accident can be found as soon as possible.

本实用新型提供的技术方案带来的有益效果是:将电压电流互感器负载箱、互感器校验仪、调压控制箱、升流器和试验变压器集成到一个中空结构的柜体内,并在所述柜体台面上加设标准互感器安装板和被试互感器安装板,接线非常方便,且占用空间较小;同时,互感器通过所述互感器接线柱接线,操作简单方便;而且,加设的报警器保证了一旦出现意外能尽早发现。The beneficial effect brought by the technical solution provided by the utility model is that the voltage and current transformer load box, the transformer calibrator, the voltage regulation control box, the current booster and the test transformer are integrated into a hollow structure cabinet, and the The standard transformer mounting plate and the tested transformer mounting plate are added on the table of the cabinet body, the wiring is very convenient, and the space occupied is small; at the same time, the transformer is connected through the transformer terminal, and the operation is simple and convenient; and, The added alarm ensures that once an accident occurs, it can be discovered as early as possible.

本实用新型具有结构简单,操作方便且使用安全等特点。The utility model has the characteristics of simple structure, convenient operation and safe use.

附图说明 Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是柜体的结构示意图。Figure 2 is a schematic structural view of the cabinet.

图中,电压电流互感器负载箱11,互感器校验仪12,调压控制箱13,升流器14,试验变压器15,柜体2,标准互感器安装面3,精密电压互感器安装板31,精密电流互感器安装板32,被试互感器安装面4,被试电压互感器安装板41,被试电流互感器安装板42,互感器接线柱5,总电源接线柱6,接地接线柱7,电源空开8,报警器9。In the figure, voltage and current transformer load box 11, transformer calibrator 12, voltage regulation control box 13, current booster 14, test transformer 15, cabinet body 2, standard transformer mounting surface 3, precision voltage transformer mounting plate 31. Precision current transformer mounting plate 32, tested transformer mounting surface 4, tested voltage transformer mounting plate 41, tested current transformer mounting plate 42, transformer terminal 5, main power terminal 6, grounding connection Column 7, power switch 8, alarm 9.

具体实施方式 Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings.

如图1所示,本实用新型提供的一种互感器检定仿真实训组合台,包括:电压电流互感器负载箱11、互感器校验仪12、调压控制箱13、升流器14、试验变压器15和内部为中空结构的柜体2,所述电压电流互感器负载箱11、互感器校验仪12、调压控制箱13、升流器14和试验变压器15设置在柜体2内,所述电压电流互感器负载箱11、互感器校验仪12、调压控制箱13、升流器14和试验变压器15的操作面板设置在所述柜体2的台面上,所述柜体2的台面上还设置有标准互感器安装面3和被试互感器安装面4,所述标准互感器安装面3和被试互感器安装面4上设置有用于连接互感器的互感器接线柱5,所述互感器接线柱5与所述柜体2内设备相对应连接形成互感器检定线路(参见图2)。As shown in Figure 1, a transformer verification simulation training combination platform provided by the utility model includes: a voltage and current transformer load box 11, a transformer calibrator 12, a voltage regulation control box 13, a current booster 14, The test transformer 15 and the cabinet 2 with a hollow structure inside, the voltage and current transformer load box 11, the transformer calibrator 12, the voltage regulation control box 13, the current booster 14 and the test transformer 15 are arranged in the cabinet 2 , the operation panels of the voltage and current transformer load box 11, the transformer calibrator 12, the voltage regulation control box 13, the current booster 14 and the test transformer 15 are arranged on the table top of the cabinet body 2, and the cabinet body 2 is also provided with a standard transformer installation surface 3 and a tested transformer installation surface 4, and the standard transformer installation surface 3 and the tested transformer installation surface 4 are provided with transformer terminals for connecting transformers 5. The transformer terminal 5 is correspondingly connected with the equipment in the cabinet 2 to form a transformer verification circuit (see FIG. 2 ).

如图2所示,所述述标准互感器安装面3的数量至少为一个,所述被试互感器安装面4的数量至少为一个,该标准互感器安装面和被试互感器安装面的数量根据实际仿真实训需要设计。所述标准互感器安装面3为两个,每个标准互感器安装面3上分别设置有一个精密互感器安装板,所述互感器接线柱5布置在该精密互感器安装板上,该精密互感器安装板的数量根据实际仿真实训需要设计。所述被试互感器安装面4为两个,每个被试互感器安装面4上分别设置有至少一个被试互感器安装板,所述互感器接线柱5布置在该被试互感器安装板上,该被试互感器安装板的数量根据实际仿真实训需要设计。所述精密互感器安装板为精密电压互感器安装板31或/和精密电流互感器安装板32,该精密互感器安装板的种类根据实际仿真实训需要设计。所述被试互感器安装板为被试电压互感器安装板41或/和被试电流互感器安装板42,该被试互感器安装板的种类根据实际仿真实训需要设计。在实际使用中,可将精密电流互感器安装板32和被试电流互感器安装板42上的主线路接线柱设置多个(如K1、K2、K3、K4),为电流互感器提供不同大小的电流,以满足仿真实训需要(参见图1)。As shown in Figure 2, the quantity of said standard transformer mounting surface 3 is at least one, and the quantity of said tested transformer mounting surface 4 is at least one, the standard transformer mounting surface and the tested transformer mounting surface The quantity is designed according to the actual simulation training needs. There are two standard transformer mounting surfaces 3, and each standard transformer mounting surface 3 is respectively provided with a precision transformer mounting plate, and the transformer terminal 5 is arranged on the precision transformer mounting plate. The number of transformer mounting plates is designed according to the actual simulation training needs. The tested transformer mounting surface 4 is two, and each tested transformer mounting surface 4 is respectively provided with at least one tested transformer mounting plate, and the transformer terminal 5 is arranged on the tested transformer installation surface. On the board, the number of the tested transformer mounting boards is designed according to the actual simulation training needs. The precision transformer mounting plate is a precision voltage transformer mounting plate 31 or/and a precision current transformer mounting plate 32, and the type of the precision transformer mounting plate is designed according to actual simulation training needs. The tested transformer mounting plate is the tested voltage transformer mounting plate 41 or/and the tested current transformer mounting plate 42, and the type of the tested transformer mounting plate is designed according to the actual simulation training needs. In actual use, multiple main line terminals (such as K1, K2, K3, K4) can be set on the precision current transformer mounting plate 32 and the tested current transformer mounting plate 42 to provide different sizes for the current transformers. current to meet the needs of simulation training (see Figure 1).

如图2所示,所述柜体2的台面上还设有总电源接线柱6和接地接线柱7,该总电源接线柱6和接地接线柱7接入所述互感器检定线路中,为本装置提供电源。所述柜体2的台面上还设有电源空开8,该电源空开8接入所述互感器检定线路中。所述柜体2的台面上还设有报警器9,该报警器9接入所述互感器检定线路中起警示作用,以便一旦出现意外能尽早发现。As shown in Figure 2, the table of the cabinet body 2 is also provided with a total power terminal 6 and a grounding terminal 7, the total power terminal 6 and the grounding terminal 7 are connected to the transformer verification circuit, for This unit provides power. A power switch 8 is also arranged on the table of the cabinet body 2, and the power switch 8 is connected to the testing circuit of the transformer. An alarm 9 is also arranged on the table of the cabinet body 2, and the alarm 9 is connected to the testing circuit of the transformer to play a warning function, so that it can be found as early as possible in case of an accident.

本实用新型将电压电流互感器负载箱11、互感器校验仪12、调压控制箱13、升流器14和试验变压器15集成到一个中空结构的柜体2内,并在所述柜体2台面上加设标准互感器安装板和被试互感器安装板,接线非常方便,且占用空间较小;同时,互感器通过所述互感器接线柱5接线,操作简单方便;而且,加设的报警器9保证了一旦出现意外能尽早发现。结构简单,操作方便且使用安全。The utility model integrates a voltage and current transformer load box 11, a transformer calibrator 12, a voltage regulation control box 13, a current booster 14 and a test transformer 15 into a hollow structure cabinet body 2, and in the cabinet body 2. A standard transformer mounting plate and a tested transformer mounting plate are added on the table, which is very convenient for wiring and takes up less space; at the same time, the transformer is connected through the transformer terminal 5, and the operation is simple and convenient; and, adding The alarm 9 has ensured that it can be found as early as possible in case of an accident. The structure is simple, the operation is convenient and the use is safe.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (9)

1. ct calibrating simulation training compound table; Comprise: voltage current transformer load box, mutual-inductor tester, Regulation Control case, current lifting device, testing transformer and inside are the cabinet of hollow structure; It is characterized in that; Said voltage current transformer load box, mutual-inductor tester, Regulation Control case, current lifting device and testing transformer are arranged in the cabinet; The guidance panel of said voltage current transformer load box, mutual-inductor tester, Regulation Control case, current lifting device and testing transformer is arranged on the table top of said cabinet; Also be provided with the standard mutual inductor installed surface on the table top of said cabinet and tried the mutual inductor installed surface; Said standard mutual inductor installed surface is provided with the mutual inductor binding post that is used to be connected mutual inductor, the corresponding ct calibrating circuit that is connected to form of equipment in said mutual inductor binding post and the said cabinet with quilt examination mutual inductor installed surface.
2. ct calibrating simulation training compound table according to claim 1 is characterized in that the quantity of said standard mutual inductor installed surface is at least one, and said quantity by examination mutual inductor installed surface is at least one.
3. ct calibrating simulation training compound table according to claim 1 and 2; It is characterized in that; Said standard mutual inductor installed surface is two; Be respectively arranged with an accurate mutual inductor installing plate on each standard mutual inductor installed surface, said mutual inductor binding post is arranged on this precision mutual inductor installing plate.
4. ct calibrating simulation training compound table according to claim 1 and 2; It is characterized in that; Said is two by examination mutual inductor installed surface; Each is tried to be respectively arranged with on the mutual inductor installed surface at least one and is tried the mutual inductor installing plate, and said mutual inductor binding post is arranged in this and is tried on the mutual inductor installing plate.
5. ct calibrating simulation training compound table according to claim 3 is characterized in that, said accurate mutual inductor installing plate is that the accurate voltage mutual inductor installing plate is or/and precision current mutual inductor installing plate.
6. ct calibrating simulation training compound table according to claim 4 is characterized in that, said is by examination voltage transformer (VT) installing plate or/and by examination current transformer installing plate by examination mutual inductor installing plate.
7. ct calibrating simulation training compound table according to claim 1 is characterized in that, also is provided with general supply binding post and ground connection binding post on the table top of said cabinet.
8. ct calibrating simulation training compound table according to claim 1 is characterized in that, also is provided with the power supply sky on the table top of said cabinet and opens, and this power supply sky is opened and inserted in the said ct calibrating circuit.
9. ct calibrating simulation training compound table according to claim 1 is characterized in that, also is provided with alarm on the table top of said cabinet.
CN2011203524871U 2011-09-20 2011-09-20 Combined table for transformer verification simulation training Expired - Fee Related CN202257990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203524871U CN202257990U (en) 2011-09-20 2011-09-20 Combined table for transformer verification simulation training

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203524871U CN202257990U (en) 2011-09-20 2011-09-20 Combined table for transformer verification simulation training

Publications (1)

Publication Number Publication Date
CN202257990U true CN202257990U (en) 2012-05-30

Family

ID=46119200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203524871U Expired - Fee Related CN202257990U (en) 2011-09-20 2011-09-20 Combined table for transformer verification simulation training

Country Status (1)

Country Link
CN (1) CN202257990U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324204A (en) * 2011-09-20 2012-01-18 安徽电气工程职业技术学院 Combined table for simulated training of verification of transformer
CN103217606A (en) * 2013-03-29 2013-07-24 国家电网公司 Vehicle-mounted touch screen control full-automatic mutual inductor calibrating device
CN103761895A (en) * 2014-01-09 2014-04-30 广西电网公司电力科学研究院 Current transformer simulation examination system and working method
CN103760512A (en) * 2014-01-09 2014-04-30 广西电网公司电力科学研究院 Voltage booster simulator
CN103778827A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Electric energy metering transformer detection simulation training and evaluation system
CN103778826A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Voltage transformer simulation training system and working method
CN105044650A (en) * 2015-09-17 2015-11-11 国家电网公司 Error testing wiring box for voltage transformer

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324204A (en) * 2011-09-20 2012-01-18 安徽电气工程职业技术学院 Combined table for simulated training of verification of transformer
CN102324204B (en) * 2011-09-20 2014-01-22 安徽电气工程职业技术学院 Combined table for simulated training of verification of transformer
CN103217606A (en) * 2013-03-29 2013-07-24 国家电网公司 Vehicle-mounted touch screen control full-automatic mutual inductor calibrating device
CN103761895A (en) * 2014-01-09 2014-04-30 广西电网公司电力科学研究院 Current transformer simulation examination system and working method
CN103760512A (en) * 2014-01-09 2014-04-30 广西电网公司电力科学研究院 Voltage booster simulator
CN103778827A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Electric energy metering transformer detection simulation training and evaluation system
CN103778826A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Voltage transformer simulation training system and working method
CN103778827B (en) * 2014-01-09 2016-03-23 广西电网公司电力科学研究院 A kind of electric energy metrical mutual inductor detection simulation training and checking system
CN103778826B (en) * 2014-01-09 2016-03-23 广西电网公司电力科学研究院 A kind of voltage transformer (VT) simulation training system and method for work
CN105044650A (en) * 2015-09-17 2015-11-11 国家电网公司 Error testing wiring box for voltage transformer

Similar Documents

Publication Publication Date Title
CN202257990U (en) Combined table for transformer verification simulation training
CN202939885U (en) Electrical measuring instrument simulation training apparatus
CN105608966A (en) Electric power metering device simulated field multifunctional training working table
CN104851343A (en) Demonstration and training device for electric equipment
CN205068942U (en) Experimental hybrid simulation system of high -voltage electrical
CN202421361U (en) Comprehensive test platform for transformer
CN203966413U (en) A kind of band imitation screen feeder automation operation bench
CN206480263U (en) A kind of low-voltage collecting meter reading failure training set
CN110533998A (en) A self-service intelligent electrician training platform
CN204808689U (en) Power equipment demonstrates training set
CN102324204B (en) Combined table for simulated training of verification of transformer
CN201072614Y (en) Novel high-performance electrotechnics experimental device
CN205594947U (en) Real device of instructing of split type energy metering equipment and terminal installation wiring
CN207440603U (en) A kind of control system test device peculiar to vessel
CN207182757U (en) A kind of transformer capacity test emulation actual training device
CN204759802U (en) Real standard examination device of two -sided electric energy meter wiring technology
CN206505129U (en) A kind of test equipment for the full electronic boxs of pure electric automobile PDU
CN201724992U (en) Embedded test vehicle
CN2620905Y (en) Low voltage distribution control cabinet training device
CN205582323U (en) Low -pressure measurement anti -electricity -stealing training set
CN209543630U (en) An electrician basic training device
CN206400910U (en) A kind of basic electrician practical training apparatus
CN207866938U (en) A kind of SVG power cells experimental rig
CN211294410U (en) Portable metering simulation device
CN203931284U (en) Low voltage reactive power compensation principle and device for training skill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID ANHUI ELECTRIC POWER COMPANY TRAINING C

Free format text: FORMER OWNER: WUHAN NARI LIMITED LIABILITY COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140115

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: ANHUI ELECTRICAL ENGINEERING PROFESSIONAL TECHNIQUE COLLEGE

Effective date: 20140115

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 230000 HEFEI, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140115

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: State Grid Anhui Electric Power Company Training Center

Patentee after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Address before: No. 397 Hefei River avenue of 230000 cities in Anhui Province

Patentee before: Anhui Electrical Engineering Professional Technique College

Patentee before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20200920

CF01 Termination of patent right due to non-payment of annual fee