CN202255748U - Pressure sensor protection device for water shutoff profile control physical simulation experiment - Google Patents
Pressure sensor protection device for water shutoff profile control physical simulation experiment Download PDFInfo
- Publication number
- CN202255748U CN202255748U CN 201120361863 CN201120361863U CN202255748U CN 202255748 U CN202255748 U CN 202255748U CN 201120361863 CN201120361863 CN 201120361863 CN 201120361863 U CN201120361863 U CN 201120361863U CN 202255748 U CN202255748 U CN 202255748U
- Authority
- CN
- China
- Prior art keywords
- pressure
- gas
- pipeline
- pressure transfer
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a pressure sensor protection device for a water shutoff profile control physical simulation experiment, which is used in a water shutoff profile control physical simulation indoor experiment in petroleum industry, protects a pressure sensor for the experiment, and is convenient to use. The device comprises a pressure transfer barrel, a nitrogen supply bottle, a liquid pressure transfer pipeline, a gas pressure transfer pipeline and a gas supply pipeline, wherein an experiment control valve is arranged on the liquid pressure transfer pipeline; a pressure sensor protection valve is arranged on the gas pressure transfer pipeline; one end of the liquid pressure transfer pipeline is connected with a pressure measurement point of a rock core, and the other end of the liquid pressure transfer pipeline is connected with the pressure transfer barrel; one end of the gas pressure transfer pipeline is connected with the pressure transfer barrel, and the other end of the gas pressure transfer pipeline is connected with the pressure sensor; a gas exhaust valve and a gas supply valve are arranged on the gas supply pipeline; one end of the gas supply pipeline is connected with the nitrogen supply bottle; and a pipeline between the gas exhaust valve and the gas supply valve is communicated with the gas pressure transfer pipeline. The device is safely and simply operated and is convenient to use, and the cleaning work of the gas pressure transfer pipeline of the pressure sensor can be avoided.
Description
Technical field
The utility model belongs to petroleum industry physical simulation experiment equipment; Particularly the water plugging and profile controlling physical simulation experiment is used the pressure transducer protective device; The laboratory experiment that is used for the water plugging and profile controlling physical simulation; Pressure transducer in the water plugging and profile controlling physical simulation experiment is formed protection, protection experimental facilities, the convenient use.
Background technology
In the water plugging and profile controlling physical simulating device of petroleum industry; Rock core is to be placed in the airtight baking oven; Pressure transducer and other checkout equipment are fixed together, and the pressure tap on the rock core is distant apart from pressure transducer, between them are to connect through very long pipeline.When the water plugging and profile controlling physical simulation experiment, in rock core, inject crude oil and cross-linking polymer system and carry out simulating oil deposit experiment, crude oil and cross-linking polymer system can flow and can get into inside to the pressure transducer direction along pipeline through pressure tap.After experiment finished, pipeline was oversize on the one hand, and crude oil that the inside is residual and cross-linking polymer system are difficult to clean; The crude oil that gets on the other hand in the pressure transducer can pollute tensimeter, and the result has harmful effect to gauge measurement, simultaneously owing to a lot of pressure transducers are fitted together; Dismounting is inconvenience very, and be difficult to clean cross-linking polymer system wherein, in case remaining cross-linked polymer becomes glue; The easy blocking pressure transducer, and then influence is used and experiment effect next time.
Summary of the invention
The purpose of the utility model provides the water plugging and profile controlling physical simulation experiment and uses the pressure transducer protective device, prevents that pressure transducer is contaminated and stops up convenient experiment, protection pressure transducer.
The technical scheme of the utility model is: the water plugging and profile controlling physical simulation experiment comprises pressure-transmission tube, nitrogen supply (NS) bottle, liquid pressure transmission pipeline, the gentle body supply line of gas pressure transmission pipeline with the pressure transducer protective device; On liquid pressure transmission pipeline, the experiment operation valve is housed, on gas pressure transmission pipeline, the pressure transducer protective valve is housed; Liquid pressure transmission pipeline one end is connected with the pressure tap of rock core, and the other end is connected with pressure-transmission tube; Gas pressure transmission pipeline one end connects pressure-transmission tube, and the other end connects pressure transducer; On gas feedthroughs, be provided with vent valve and steam supply valve, gas feedthroughs one end is connected with the nitrogen supply (NS) bottle, and the pipeline between vent valve and the steam supply valve is communicated with gas pressure transmission pipeline.
Compared with prior art the beneficial effect of the utility model is: this protective device effectively prevents the fluid input pressure sensor in the rock core through two kinds of pressure transmission modes of liquids and gases, has effectively shortened the length of liquid pressure transmission pipeline.Its dependable performance, security of operation, simple to operate, easy to use, but the cleaning of dispense pressure sensor gas pressure transmission pipeline.Can be widely used in the water plugging and profile controlling physical simulation experiment, the pressure transducer in the protection experimental provision is without prejudice, and guarantees the accurate of experimental data, reduces experimental cost.
Description of drawings
Fig. 1 is the fundamental diagram of the utility model.
Embodiment
Below in conjunction with embodiment the utility model is detailed; Referring to Fig. 1; The water plugging and profile controlling physical simulation experiment comprises pressure-transmission tube 4, nitrogen supply (NS) bottle 7, liquid pressure transmission pipeline, the gentle body supply line of gas pressure transmission pipeline with the pressure transducer protective device; Experiment operation valve 2 is housed on liquid pressure transmission pipeline, on gas pressure transmission pipeline, pressure transducer protective valve 8 is housed; Liquid pressure transmission pipeline one end
WithThe pressure tap of rock core 1 connects, and the other end is connected with pressure-transmission tube 4; Gas pressure transmission pipeline one end connects pressure-transmission tube 4, and the other end connects pressure transducer 9; On gas feedthroughs, be provided with vent valve 5 and steam supply valve 6, gas feedthroughs one end is connected with nitrogen supply (NS) bottle 7, and the pipeline between vent valve 5 and the steam supply valve 6 is communicated with gas pressure transmission pipeline.Pressure cap 3 is installed on the top of pressure-transmission tube 4, and gas pressure transmission pipeline is a way of transparent lines, convenient behaviour in service of observing gas pressure transmission pipeline.
During experiment, pressure cap 3 and 4 of pressure-transmission tubes are tightened, kept pressure-transmission tube 4 vertically to place, can not tilt.Close experiment operation valve 2 and vent valve 5, open pressure transducer protective valve 8.In order to make the quick build-up pressure balance of ability in the pressure-transmission tube 4; Open steam supply valve 6; Nitrogen in the nitrogen supply (NS) bottle 7 is injected pressure-transmission tube 4; Make that gas reaches certain pressure in the pressure-transmission tube 4, the big I of pressure records through pressure transducer 9, and the nitrogen pressure in the pressure-transmission tube 4 is more smaller than pressure tap pressure.Close the steam supply valve 6 of nitrogen supply (NS) bottle 7; Open experiment operation valve 2; Because the pressure of the gas in the physical simulating device in the pressure ratio pressure-transmission tube 4 of rock core 1 pressure tap is bigger, so just has fluid to flow out from pressure tap, get in the pressure-transmission tube 4 along liquid pressure transmission pipeline; Fluid drop drops on the bottom of pressure-transmission tube 4 under the effect of gravity, can not flow to pressure transducer 9.Because fluid constantly gets in the pressure-transmission tube 4, fluid occupies the space of pressure-transmission tube 4, and the nitrogen in the pressure-transmission tube 4 will be by continuous compression.When the pressure of rock core 1 pressure tap and the pressure equilibrium in the pressure-transmission tube 4; The pressure tap place of rock core 1 does not just have fluid and flows out in liquid pressure transmission pipeline entering pressure-transmission tube 4, and at this moment the pressure tap place pressure of rock core 1 is consistent with pressure transducer 9 measured pressure.If rock core 1 pressure tap place pressure increases, just there is fluid to flow out from rock core 1 pressure tap, get in the pressure-transmission tube 4 along liquid pressure transmission pipeline, rebulid new pressure equilibrium, new pressure is that pressure transducer 9 is measured.In rock core 1, injecting flow liquid processes such as crude oil, cross-linking polymer system like this, pressure changes can both be measured by pressure transducer 9.Because the fluid that flow out at rock core 1 pressure tap place does not touch pressure transducer 9, thereby pressure transducer 9 can be not contaminated, there is not the blocked possibility of pressure transducer 9 yet, pressure transducer 9 is effectively protected.There is fluid to get in the transparent gas pressure transmission pipeline as finding in the experiment, should closes experiment operation valve 2 and pressure transducer protective valve 8 immediately.Turn on pressure cap 3, outwell the fluid in the pressure-transmission tube 4, install again after checking, continue experiment.When experiment finishes, turn off experiment operation valve 2 earlier, slowly open vent valve 5,, turn on pressure cap 3 then, clean pressure-transmission tube 4 parts such as grade, got ready and time used again pressure-transmission tube 4 pressure releases.
Claims (3)
1. the water plugging and profile controlling physical simulation experiment is used the pressure transducer protective device; It is characterized in that; Comprise pressure-transmission tube (4), nitrogen supply (NS) bottle (7), liquid pressure transmission pipeline, the gentle body supply line of gas pressure transmission pipeline; Experiment operation valve (2) is housed on liquid pressure transmission pipeline, pressure transducer protective valve (8) is housed on gas pressure transmission pipeline; Liquid pressure transmission pipeline one end is connected with the pressure tap of rock core (1), and the other end is connected with pressure-transmission tube (4); Gas pressure transmission pipeline one end connects pressure-transmission tube (4), and the other end connects pressure transducer (9); On gas feedthroughs, be provided with vent valve (5) and steam supply valve (6), gas feedthroughs one end is connected with nitrogen supply (NS) bottle (7), and the pipeline between vent valve (5) and the steam supply valve (6) is communicated with gas pressure transmission pipeline.
2. water plugging and profile controlling physical simulation experiment according to claim 1 is used the pressure transducer protective device, it is characterized in that, pressure cap (3) is installed on the top of pressure-transmission tube (4).
3. water plugging and profile controlling physical simulation experiment according to claim 1 is used the pressure transducer protective device, it is characterized in that, gas pressure transmission pipeline is a way of transparent lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120361863 CN202255748U (en) | 2011-09-26 | 2011-09-26 | Pressure sensor protection device for water shutoff profile control physical simulation experiment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120361863 CN202255748U (en) | 2011-09-26 | 2011-09-26 | Pressure sensor protection device for water shutoff profile control physical simulation experiment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202255748U true CN202255748U (en) | 2012-05-30 |
Family
ID=46116973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120361863 Expired - Fee Related CN202255748U (en) | 2011-09-26 | 2011-09-26 | Pressure sensor protection device for water shutoff profile control physical simulation experiment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202255748U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828746A (en) * | 2012-09-18 | 2012-12-19 | 中国石油化工股份有限公司 | Pressure return device for water plugging profile control physical simulation experiment and use method of pressure return device |
CN105910753A (en) * | 2016-05-09 | 2016-08-31 | 华东理工大学 | Cinder notch differential pressure measurement device and method |
-
2011
- 2011-09-26 CN CN 201120361863 patent/CN202255748U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828746A (en) * | 2012-09-18 | 2012-12-19 | 中国石油化工股份有限公司 | Pressure return device for water plugging profile control physical simulation experiment and use method of pressure return device |
CN102828746B (en) * | 2012-09-18 | 2015-06-24 | 中国石油化工股份有限公司 | Pressure return device for water plugging profile control physical simulation experiment and use method of pressure return device |
CN105910753A (en) * | 2016-05-09 | 2016-08-31 | 华东理工大学 | Cinder notch differential pressure measurement device and method |
CN105910753B (en) * | 2016-05-09 | 2019-02-22 | 华东理工大学 | A kind of cinder notch pressure difference measuring device and its method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204027753U (en) | A kind of anti-overflow non-maintaining U-tube pressure gauge | |
CA2862863A1 (en) | Apparatus and method to contain pipeline leaks from a longitudinal portion of a pipeline | |
CN202255748U (en) | Pressure sensor protection device for water shutoff profile control physical simulation experiment | |
WO2010112187A3 (en) | Sealing device for a device for measuring the fill level in a pressure vessel of a nuclear facility | |
CN204177519U (en) | A kind of cleanable pressure sensor device | |
CN204345266U (en) | High-temperature and pressure pipeline system | |
CN203758569U (en) | Protective gas metering device for experiments | |
RU140898U1 (en) | FIRE FIGHTING PLANT | |
CN104792814B (en) | LNG with pressure flashes experimental method | |
CN105203295A (en) | Measuring device and method for measuring friction resistance of fracturing fluid | |
CN103910138A (en) | Liquid storage tank | |
CN203929590U (en) | The corrosive pipeline analogue experiment installation of gas-liquid biphase fluid | |
CN203534667U (en) | Non-contact liquid level detection apparatus | |
CN203414191U (en) | Online plugging thermal resistor | |
CN204007764U (en) | The accurate test unit of a kind of tank fill level and the volume table of comparisons | |
CN202837107U (en) | Metal pipeline pressure testing device | |
CN202902716U (en) | Numerical controlled refrigeration automatic liquid adding machine | |
CN202195864U (en) | Device for onsite calibration of aircraft liquid flow | |
CN202599631U (en) | Gas leakage detection system | |
CN104777185B (en) | LNG with pressure flashes experiment porch | |
CN203610127U (en) | Nitrogen delivery device for polyester polyol synthesis | |
CN202526813U (en) | Protective substance spray device for building and container | |
CN205691196U (en) | Glass plate liquidometer | |
CN206582434U (en) | GRP pipe instrument anti-corrosive apparatus | |
CN203595590U (en) | Pressure-bearing leak stopping tester |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20120926 |