CN202249008U - Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure - Google Patents

Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure Download PDF

Info

Publication number
CN202249008U
CN202249008U CN2011203888632U CN201120388863U CN202249008U CN 202249008 U CN202249008 U CN 202249008U CN 2011203888632 U CN2011203888632 U CN 2011203888632U CN 201120388863 U CN201120388863 U CN 201120388863U CN 202249008 U CN202249008 U CN 202249008U
Authority
CN
China
Prior art keywords
workshop
air
air conditioner
closed
electromagnetic wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203888632U
Other languages
Chinese (zh)
Inventor
李雄壮
何琳
梁珺
韩新生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tianwei Baobian Electric Co Ltd
Original Assignee
BAODING TIANWEI ELECTRIC POWER WIRE CO LTD
Baoding Tianwei Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAODING TIANWEI ELECTRIC POWER WIRE CO LTD, Baoding Tianwei Group Co Ltd filed Critical BAODING TIANWEI ELECTRIC POWER WIRE CO LTD
Priority to CN2011203888632U priority Critical patent/CN202249008U/en
Application granted granted Critical
Publication of CN202249008U publication Critical patent/CN202249008U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model relates to a fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure, and belongs to the technical field of production of transformer electromagnetic wires. The technical scheme is that: the fully-closed factory structure consists of a steel structural framework (10) and a closed plastic-steel glass window (8), and is provided with a workshop channel (3); the steel structural framework is provided with a workshop entrance air shower (4), an air conditioner air outlet (6) and a workshop channel gate (7); the air conditioner air outlet is connected with an air conditioner equipment room (5) through an air conditioner pipeline (9); and the workshop channel gate is matched with the workshop channel on the factory ground. The fully-closed central air conditioner temperature control electromagnetic wire factory arrangement structure has the advantages that: a design for fully-closed central air conditioner temperature control is adopted, so that the production and processing environment of products is improved, the adverse effects caused by much dust and high fluctuation of indoor temperature and humidity along with the season on the quality of an electromagnetic wire product are avoided, and the technical requirement of a high-capacity ultrahigh-voltage transformer on matching products is met.

Description

Central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement
Technical field
The utility model relates to a kind of central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement, belongs to transformer electromagnetic wire production technical field.
Background technology
Along with the construction in large-scale water power, thermoelectricity and nuclear power base, to the increasing demand increase of remote, big capacity super-pressure and UHV transmission, this has brought life for the electromagnetic wire industry, also the electromagnetic wire product quality has been proposed more strict requirement simultaneously.In the face of big capacity extra-high voltage transformer; The user more and more pays close attention to the adverse effect that the processing environment (as: factors such as temperature, humidity, dustfall content) of enterprise product brings the insulation materials in the electromagnetic wire product, conductor material and product electrical property except the equipment capacity that will consider supporting enterprise, technical guarantee ability.At present; The workshop condition facility of the middle-size and small-size electromagnetic wire of majority manufacturing enterprise does not possess the condition of producing big capacity super-pressure product as yet; The production and processing environment of product is abominable, the adverse effect that dust is more, interior temperature, humidity bring for the electromagnetic wire product quality with the big rise and fall in season.
The utility model content
The utility model purpose provides a kind of central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement; Improve the production and processing environment; Solve that dust in the production department that background technology exists is more, interior temperature, humidity give the problem of the adverse effect that the electromagnetic wire product quality brings with the big rise and fall in season, satisfies the high standard technical requirements of big capacity EHV transformer to auxiliary products.
The technical scheme of the utility model is: central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement; Comprise steel structure frame, closed plastic-steel glass window, workshop inlet Airshower chamber, Air Conditioning Facilities, air-conditioner air outlet, workshop passage, passage gate, workshop; Steel structure frame and closed plastic-steel glass window constitute totally-enclosed mill construction, and the shingle nail of steel structure frame is a double layer composite board, fill the thick glass wool of 75mm between the double layer composite board; As insulation layer; Facility floor concrete, the flat structure of vibrating, sclerosis is all done on the facility floor top layer, and is provided with the workshop passage; Steel structure frame is provided with workshop inlet Airshower chamber, air-conditioner air outlet, passage gate, workshop, and air-conditioner air outlet is connected through air-conditioning duct with Air Conditioning Facilities, the workshop passage on passage gate, the workshop coupling facility floor.
Passage both sides, workshop on the facility floor are provided with production equipment.
The factory building of the utility model arranges that comprise following steps: 1. factory building all adopts the full-enclosed structure of steel structure frame, closed plastic-steel glass window, and insulation layer is the thick glass wool of 75mm, adopts the secondary purlin of Z type to press cotton; Sealing is accomplished in the seam construction, and is non-leakage, and the monolithic roof panel is adopted no joint treatment; 2. the factory building shingle nail is a double layer composite board, adopts the 75mm heavy sheet glass cotton between the double layer composite board, and closed plastic-steel glass window is all adopted in daylighting, and it is closely knit that embedding is filled out in the slit between doorframe and window frame and body of wall, slit pointing fluid sealant, smooth surface, smooth, pore-free; 3. the facility floor engineering adopts concrete, flat vibrating, and sclerosis is all done on the top layer, and abrasion resistance is high, does not play dirt; 4. the cement floor polishing is seen newly the epoxy resin scumbling enamelled coating of mating formation on the polishing layer then; 5. workshop inlet Airshower chamber is installed at feeder connection place, factory building workshop; 6. factory building all adopts the central type Air Conditioning Facilities and the air-conditioner air outlet of band high efficiency particulate air filter to arrange that the Air Conditioning Facilities of factory building are the absorption refrigeration machine room, and thermal source adopts electromagnetic wire factory heating plant that hot water is provided.
The beneficial effect of the utility model:
1) because factory building has adopted the totally enclosed type design, realized effectively that the workshop is inner to isolate with external environment, make workshop interior walls, ceiling surface all smooth, smooth, stuffy dirt, do not play static, the day dustfall content≤8mg/m workshop in 2, and be beneficial to the realization of later stage workshop central air-conditioning air-supply, temperature control.
2) to coagulation ground application epoxy resin scumbling enamelled coating, effectively disperse thump stress, strengthen load-bearing, avoided because of the weight bump produces the sand and dust that the ground breakage causes, and be beneficial to the cleaning on ground at ordinary times.Each item technical indicator sees the following form
Figure 293057DEST_PATH_IMAGE002
3) the supporting use of workshop inlet Airshower chamber and closed factory building; Spray clean high wind purge recycling by blower fan through Blow shower nozzle when making personnel get into the production area through high efficiency filter; Remove effectively and rapidly attached to foreign material such as the dust on the clothes, hair, bits; Reach the dustless purification standard of work-yard, produce high-quality product.
4) after the workshop central air-conditioning is launched; Can guarantee 27 ℃~29 ℃ of interior temperatures in summer, relative humidity 50% ~ 65%; Winter, interior temperature was 17 ℃ ~ 20 ℃; Satisfy guarantee the quality storage condition and the production equipment of all kinds of insulation materials, conductor material, the environment for use of detecting instrument, and reach all kinds of testing transformer environments for use: environment temperature-40 ℃~40 ℃; The requirement of relative humidity≤85%.
Description of drawings
Fig. 1 is the utility model embodiment sketch map;
Among the figure: production equipment 1,2; Workshop passage 3; Workshop inlet Airshower chamber 4; Air Conditioning Facilities 5; Air-conditioner air outlet 6; Passage gate, workshop 7; Closed plastic-steel glass window 8; Air-conditioning duct 9; Steel structure frame 10.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further through embodiment.
Central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement; Comprise steel structure frame 10, closed plastic-steel glass window 8, workshop inlet Airshower chamber 4, Air Conditioning Facilities 5, air-conditioner air outlet 6, workshop passage 3, passage gate, workshop 7; Steel structure frame and closed plastic-steel glass window constitute totally-enclosed mill construction, and the shingle nail of steel structure frame is a double layer composite board, fill the thick glass wool of 75mm between the double layer composite board; As insulation layer; Facility floor concrete, the flat structure of vibrating, sclerosis is all done on the facility floor top layer, and is provided with the workshop passage; Steel structure frame is provided with workshop inlet Airshower chamber, air-conditioner air outlet, passage gate, workshop, and air-conditioner air outlet is connected through air-conditioning duct 9 with Air Conditioning Facilities, the workshop passage on passage gate, the workshop coupling facility floor.
Workshop passage 3 both sides on the facility floor are provided with production equipment 1,2.
Instructions for use:
1) operating personnel must wear work clothes, footware, working cap before getting into the workspace, after the Airshower chamber dedusting, are allowed for access, and guarantee that each workshop day dustfall content reaches≤8mg/m2;
2) in the use installation process of each kind tool, standby redundancy, to handle with care in the manufacturing process, expose basic unit's sandstone, influence the dustfall content in the workshop in order to avoid damage enamelled coating;
3) according to each in season temperature, humidity change the air-conditioning switch of regulating in the workshop; After the workshop central air-conditioning is launched; Can guarantee 27 ℃~29 ℃ of interior temperatures in summer, relative humidity 50% ~ 65%; Winter, interior temperature was 17 ℃ ~ 20 ℃, satisfied guarantee the quality storage condition and the production equipment of all kinds of insulation materials, conductor material, the environment for use of detecting instrument, and reached all kinds of testing transformer environments for use: environment temperature-40 ℃~40 ℃; The requirement of relative humidity≤85%;
4) raw material and finished product are come in and gone out by passage gate, workshop, are that normally off is to guarantee workshop condition at ordinary times;
5) whole air-conditioning ducts in the workshop and air outlet are carried out regular repair and maintenance, guarantee its operate as normal.

Claims (2)

1. a central air-conditioning temperature control, totally enclosed type electromagnetic wire factory arrangement; It is characterized in that comprising steel structure frame (10), closed plastic-steel glass window (8), workshop inlet Airshower chamber (4), Air Conditioning Facilities (5), air-conditioner air outlet (6), workshop passage (3), passage gate, workshop (7); Steel structure frame and closed plastic-steel glass window constitute totally-enclosed mill construction, and the shingle nail of steel structure frame is a double layer composite board, fill the thick glass wool of 75mm between the double layer composite board; As insulation layer; Facility floor concrete, the flat structure of vibrating, sclerosis is all done on the facility floor top layer, and is provided with the workshop passage; Steel structure frame is provided with workshop inlet Airshower chamber, air-conditioner air outlet, passage gate, workshop, and air-conditioner air outlet is connected through air-conditioning duct (9) with Air Conditioning Facilities, the workshop passage on passage gate, the workshop coupling facility floor.
2. according to the said central air-conditioning temperature control of claim 1, totally enclosed type electromagnetic wire factory arrangement, it is characterized in that workshop passage (3) both sides on the facility floor are provided with production equipment (1,2).
CN2011203888632U 2011-10-13 2011-10-13 Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure Expired - Lifetime CN202249008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203888632U CN202249008U (en) 2011-10-13 2011-10-13 Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203888632U CN202249008U (en) 2011-10-13 2011-10-13 Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure

Publications (1)

Publication Number Publication Date
CN202249008U true CN202249008U (en) 2012-05-30

Family

ID=46110270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203888632U Expired - Lifetime CN202249008U (en) 2011-10-13 2011-10-13 Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure

Country Status (1)

Country Link
CN (1) CN202249008U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505874A (en) * 2011-10-13 2012-06-20 保定天威集团有限公司 Layout method and structure for central air-conditioner temperature control and totally enclosed type electromagnetic wire production factory buildings
CN106401224A (en) * 2016-11-24 2017-02-15 中国电子工程设计院 Clean room factory structure
CN110528920A (en) * 2018-05-23 2019-12-03 甘肃金土新能源材料科技有限公司 A kind of closed cast steels melting environment-friendly air conditioner workshop

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505874A (en) * 2011-10-13 2012-06-20 保定天威集团有限公司 Layout method and structure for central air-conditioner temperature control and totally enclosed type electromagnetic wire production factory buildings
CN106401224A (en) * 2016-11-24 2017-02-15 中国电子工程设计院 Clean room factory structure
CN110528920A (en) * 2018-05-23 2019-12-03 甘肃金土新能源材料科技有限公司 A kind of closed cast steels melting environment-friendly air conditioner workshop

Similar Documents

Publication Publication Date Title
CN202249008U (en) Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure
CN207123002U (en) A kind of air conditioner connecting pipe
CN207065793U (en) A kind of ventilation unit of energy saving building
CN210999304U (en) Steam curing system for concrete prefabricated part
CN102505874A (en) Layout method and structure for central air-conditioner temperature control and totally enclosed type electromagnetic wire production factory buildings
CN201844487U (en) Tunnel wet curtain air supply and temperature reduction system
CN2646157Y (en) Structure of aluminium electrolysis shop and factory building
CN107894046B (en) Domestic constant temperature and humidity square bin system
CN206370644U (en) A kind of modified form box-type substation
CN202734126U (en) Novel air adjusting system of suction type humidification cooling central air-conditioner for spinning
CN204313393U (en) The built-in machine room of a kind of air-conditioning
CN101761252B (en) Mill construction of overhanging type air inlet ventilation outer wall
CN207422359U (en) The multi-functional embedded type air conditioner of Liftable type
CN203857610U (en) Fresh air supply linkage system of house air conditioner
CN211449680U (en) Novel adjustable air valve device of low-temperature air conditioner
CN206890772U (en) A kind of ventilating opening of automatically retractable
CN208526121U (en) A kind of cover film dust-extraction unit for coal yard
CN205860279U (en) A kind of textile process factory ventilating duct for air-conditioner air-supply arrangement
CN104913416A (en) Novel air-conditioning system
CN202214226U (en) Clean air supply device for polycrystalline silicon reduction workshop
CN205678805U (en) Cortex schizophragmatis integrifolii radicis cooling ventilating system
CN209381041U (en) A kind of curing box of concrete
CN213208052U (en) Winter heating and humidifying air conditioner
CN109994944A (en) A kind of Dustproof formula substation noise reduction ventilation shaft
CN107883490A (en) A kind of cooling fan hot blast flow guide system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAODING TIANWEI BAOBIAN ELECTRIC CO., LTD.

Free format text: FORMER OWNER: BAODING TIANWEI GROUP CO., LTD.

Effective date: 20131120

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 071051 BAODING, HEBEI PROVINCE TO: 071056 BAODING, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131120

Address after: 071056 West Road, Hebei, Baoding, No. 2222, No.

Patentee after: Baoding Tianwei Baobian Electric Co., Ltd.

Patentee after: Baoding Tianwei Electric Power Wire Co.,Ltd.

Address before: 071051, Hebei City, Baoding province ginkgo Road, No. 198 Jin Di garden complex

Patentee before: Baoding Tianwei Group Co., Ltd.

Patentee before: Baoding Tianwei Electric Power Wire Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20120530

CX01 Expiry of patent term