CN202248954U - Building engineering limb protection support frame - Google Patents
Building engineering limb protection support frame Download PDFInfo
- Publication number
- CN202248954U CN202248954U CN201120372483XU CN201120372483U CN202248954U CN 202248954 U CN202248954 U CN 202248954U CN 201120372483X U CN201120372483X U CN 201120372483XU CN 201120372483 U CN201120372483 U CN 201120372483U CN 202248954 U CN202248954 U CN 202248954U
- Authority
- CN
- China
- Prior art keywords
- support frame
- support
- building engineering
- limb protection
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a building engineering limb protection support frame, which comprises a support frame and more than two bases used for stabilizing the support frame on the ground. The building engineering limb protection support frame is characterized in that sleeves and bolt holes are arranged on the bases, screw bolts used for fixedly connecting the ground are arranged on the bolt holes, and the lower end of the support frame is sheathed in the sleeves. The bottom end of the support frame is made into a sleeve type structure, and the support frame at the upper end can be more conveniently moved at any time when the stability of the support frame is ensured, so the engineering process is faster. Therefore, the building engineering limb protection support frame has good economic benefits and practical values.
Description
Technical field
The utility model relates to structure material, specifically is that construction work is faced frontier defense and protected support.
Background technology
In the existing construction, to the floor of also fitting up interim edge protection support need be set and fall down from the stair limit because of carelessness, reach assurance constructor purpose of safety to prevent the constructor.Existing face frontier defense and protect support and mainly form, see that from the side it just forms a triangle with ground, such face frontier defense to protect the stability of support not enough, and the bottom floor space is relatively large by a support that protects a frame and an inclination.A kind ofly in addition exactly the support bottom is fixed on the stair edge, but such support is not easy to move and remove, influences speed of application.
The utility model content
The purpose of the utility model is the deficiency that overcomes existences of above-mentioned technology, provides a kind of and simple in structurely moves and remove convenient and the firm construction work of ten minutes is faced frontier defense and protected support.
The technical scheme that the utility model is adopted to achieve these goals is following: a kind of construction work is faced frontier defense and is protected support; It comprises support and is used for support is stabilized in the base on ground more than two; It is characterized in that said base is provided with sleeve and bolt hole; Be provided with in the bolt hole and be used for fixing the bolt that connects ground, the lower end of said support is sleeved in the sleeve.
Face frontier defense according to a kind of construction work described in the utility model and protect support, it is characterized in that said sleeve lower end is welded on the base.
Face frontier defense according to a kind of construction work described in the utility model and protect support, it is characterized in that said support is made up of the steel pipe of several horizontal, vertical intersections.
The utility model is through making the support bottom form of sleeve, guarantee support firm in the convenient support that moves the upper end at any time, thereby make programming quicker.Therefore the utlity model has favorable economic benefit and practical value.
Description of drawings
Fig. 1 is the utility model structural representation.
Among the figure: 1-support, 2-sleeve, 3-bolt, 4-base.
The specific embodiment
To combine accompanying drawing that the technical scheme of the utility model is further specified below, but the utility model is not limited in following embodiment.
As shown in Figure 1: a kind of construction work is faced frontier defense and is protected support, and it comprises support 1 and is used for support is stabilized in the base 4 on ground more than two.Its medium-height trestle 1 is made up of the steel pipe of several horizontal, vertical intersections.Base 4 is provided with sleeve 2 and bolt hole, is provided with in the bolt hole to be used for fixing the bolt 3 that connects ground; During use, base is close to the bottom surface, passes from the bolt hole of base with bolt 3 then and squeeze into ground, thereby base is fixed on the ground, guaranteed the whole steadiness that support is protected in frontier defense that faces.Sleeve 2 lower ends are welded on base 4, and the lower end of support 1 just is sleeved in this sleeve 2, protect frame as needing to move like this, then support whole taking-up from sleeve are moved to other bases then and get final product, so greatly facilitate constructing operation, have improved construction progress.
Claims (3)
1. a construction work is faced frontier defense and is protected support; It comprises support (1) and is used for support is stabilized in the base (4) on ground more than two; It is characterized in that said base (4) is provided with sleeve (2) and bolt hole; Be provided with in the bolt hole and be used for fixing the bolt (3) that connects ground, the lower end of said support (1) is sleeved in the sleeve (2).
2. a kind of construction work according to claim 1 is faced frontier defense and is protected support, it is characterized in that said sleeve (2) lower end is welded on the base (4).
3. a kind of construction work according to claim 1 is faced frontier defense and is protected support, it is characterized in that said support (1) is made up of the steel pipe of several horizontal, vertical intersections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120372483XU CN202248954U (en) | 2011-10-08 | 2011-10-08 | Building engineering limb protection support frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120372483XU CN202248954U (en) | 2011-10-08 | 2011-10-08 | Building engineering limb protection support frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202248954U true CN202248954U (en) | 2012-05-30 |
Family
ID=46110216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120372483XU Expired - Lifetime CN202248954U (en) | 2011-10-08 | 2011-10-08 | Building engineering limb protection support frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202248954U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625737A (en) * | 2014-10-30 | 2016-06-01 | 五冶集团上海有限公司 | Method for improving installation precision of movable protection platform handrail |
-
2011
- 2011-10-08 CN CN201120372483XU patent/CN202248954U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625737A (en) * | 2014-10-30 | 2016-06-01 | 五冶集团上海有限公司 | Method for improving installation precision of movable protection platform handrail |
CN105625737B (en) * | 2014-10-30 | 2017-11-28 | 五冶集团上海有限公司 | A kind of method for improving movable protective platform railing installation accuracy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203960919U (en) | Colliery minery electric power pylon correction lift-up device | |
CN203452397U (en) | Safe protection rack | |
CN202248954U (en) | Building engineering limb protection support frame | |
CN207829505U (en) | A kind of pin-connected panel floor edge protective fence | |
CN204040515U (en) | Cat ladder | |
CN203961242U (en) | A kind of hanger device of encorbelmenting | |
CN210401072U (en) | Building material intensity detection device convenient to remove | |
CN204126242U (en) | A kind of operation platform frame stand bar structure | |
CN204676988U (en) | A kind of temporary protection enclosure wall of building site | |
CN203257110U (en) | Constructional engineering protection support | |
CN203684714U (en) | Temporary security protective barrier | |
CN201794305U (en) | Supporting device for elevator shaft mold | |
CN204510465U (en) | A kind of novel building engineering protective stent | |
CN205476556U (en) | Horizontal protection device for scaffold operation layer for building | |
CN204017504U (en) | A kind of filter Special supporting device | |
CN204529148U (en) | Cement electric pole press-rod apparatus | |
CN203113821U (en) | Corner connection part of stair adjacent edge protecting railing | |
CN204012611U (en) | A kind of cable placing support | |
CN202851007U (en) | Movable type work platform used for laneway drilling and supporting | |
CN205134920U (en) | Simple and easy aerial working platform device of building engineering | |
CN204782025U (en) | Stair that construction was used external corner protector of marking time | |
CN204475870U (en) | Straight support girder prestressing force adjusting device | |
CN204081429U (en) | Overhead welding and hoisted in position job platform | |
CN204199648U (en) | A kind of coke furnace carbonization chamber scaffold | |
CN204356013U (en) | Lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: No. 9, Wuhou District grass road, Wuhou District, Chengdu, Sichuan Patentee after: CITIC Guoan Construction Group Co., Ltd. Address before: No. 9, Wuhou District grass road, Wuhou District, Chengdu, Sichuan Patentee before: Sichuan Shengmao Construction Co., Ltd. |
|
CP03 | Change of name, title or address | ||
CX01 | Expiry of patent term |
Granted publication date: 20120530 |
|
CX01 | Expiry of patent term |