Space three-dimensional adjustable flexibility Curtainwall connector
Technical field
The utility model relates to a kind of Curtainwall connector.
Background technology
At present, the development of China's building curtain wall technology is gradually ripe and diversified, glass, metal and stone curtain wall applied more and more in engineering.Connector miscellaneous also occurred to different types of curtain wall, connector need cooperate the variety classes curtain wall to use, can not be general between the variety classes connector.
The structure of existing Curtainwall connector is comparatively simple; Connector adopts welding or bolt to be connected with main joist; Install the back only can rely on usually on the connector one or the slotted hole of both direction regulate, lean on connector self can't realize curtain wall plane materiel position three direction scalable in the space merely.The curtain wall plane materiel is installed the back and can't be regulated accurately for error, deviation that a variety of causes causes, influences curtain wall installation quality and efficiency of construction.In addition, the heat-insulating property of existing curtain wall construction is poor, forms cold bridge between connector and major structure of construction, is unfavorable for building energy conservation.
The utility model content
The utility model provides a kind of space three-dimensional adjustable flexibility Curtainwall connector, solve existing Curtainwall connector and can't realize that three-dimensional is adjustable, can't be general between all types of curtain walls, and it is not high that curtain wall is installed precision, poor, the inefficient technical problem of construction quality.
The utility model solves the technical scheme that its technical problem adopted:
This space three-dimensional adjustable flexibility Curtainwall connector is assembled by the part one, part two, part three and the part four that are connected between curtain wall main joist and the curtain wall plane materiel;
Said part one integral body is the rectangular plate shape structure; Be bent into groove in the middle of the plate body; Groove floor has the bar hole that extends to the plate body bottom from the plate body upper edge; Be distributed with the circular hole that is used to connect the curtain wall main joist on the plate body of the groove left and right sides, plate body bends inwards towards the limit, the one side left and right sides of part two and becomes to collude groove;
Said part two is that Bian Chu interconnects and forms in the left and right sides by the plate I that laterally arranges and plate II; Wherein the connecting portion in plate I and plate II left side vertically has uncovered that web width with part three adapts; The spacing between plate I and the plate II and the thickness of web adapt; The centre of plate I and plate II vertically is provided with the circular hole that is used for union piece one and part three, and plate I each side has a plug of bending outwardly towards the one side of part one;
Said part three is by the dull and stereotyped vertical T shape structure that connects into web; Circular hole opposite position on web and the part two vertically has slotted hole I; Flat board laterally has the slotted hole II that is used for union piece four with respect to the web left and right sides, and web is being provided with recess with dull and stereotyped adjacent in both sides up and down;
Said part four is by front wing panel, rear fender, and the plate that overhangs that is vertically connected between the two constitutes, front wing panel with part three on corresponding position, slotted hole II position have circular hole, front wing panel is bent into the limit of buckleing inwardly towards the one side of part three in both sides up and down;
Said part one passes circular hole by screw and is connected with the curtain wall main joist; The plug of part two left and right sides slips into colluding in the groove of part one left and right sides, and the web of part three passes the circular hole on the part two, the slotted hole I on the part three by bolt I more successively between the uncovered insertion plate I and plate II of part two left side connecting portions; And the bar hole on the part one; The three is fixed, and the flat board of part three up and down both sides slips into part four front wing panels and two buckles in the limit up and down, and two button limits embed part three webs up and down in the recess on both sides up and down simultaneously; Pass slotted hole II and the circular hole on part four front wing panels on part three flat boards by bolt II again; Part four is fixing with part three, and the rear fender of part four is with rubber sheath in both sides up and down, and rear fender both sides up and down inserts respectively in the pre-groove of two curtain wall plane materiels up and down.
The material of said part one, part two, part three and part four is steel, aluminium or alloy material.
Respectively be distributed with two circular holes on the plate body of the groove left and right sides of said part one.
Circular hole on the said part two vertically is provided with two.
The flat board of said part three each side has two slotted hole II that are used for union piece 44 with respect to web.
The rear fender of said part four has dop in both sides up and down, and rubber sheath is placed on the dop.
The beneficial effect of the utility model is following:
(1), the utility model realized the scalable of connector three directions in the space can absorbing error, deviation that a variety of causes causes through the combination of four parts, has very strong tolerance ability.Through regulating four relative positions between the part, can accurately regulate the curtain wall plane materiel, precisely install, thereby significantly improve the precision that plane materiel is installed, effectively promoted the curtain wall engineering presentation quality.
(2), this connector is connected to the curtain wall plane materiel from main joist, all adopts the mode of sliding-contact, bolt tightening, abandoned welding process fully, thereby improved installation efficiency greatly, reduced construction cost.Simultaneously, owing to reduced on-the-spot work with torches, more be prone to guarantee to construct security against fire work.
(3), this connector is directly connected to the curtain wall plane materiel from main joist, can save secondary joist, perhaps the cross section of secondary joist can smaller (because of it does not bear curtain wall plane materiel load), only as the contact member between the main joist, plays and strengthen the globality effect.Therefore, secondary joist master material use quantity is zero or significantly reduces, thereby effectively reduces the cost of raw material.
(4), part four rear fenders up and down the rubber sheath on both sides realized flexibly connecting and be incubated bridge cut-off between curtain wall plane materiel and the connector, thereby improved the deformability of curtain wall under external force effects such as wind load, the durability of enhancing curtain wall.Also improved the heat-insulating property of curtain wall engineering simultaneously, made building more energy-conservation.
(5), the utlity model has succinct, making simple and easy, the easy for installation three big characteristics of constructing.
(6), adopt the utility model to carry out curtain wall construction, can reduce the difficulty of the construction operation of curtain wall engineering effectively, for the curtain wall engineering trouble free service provides powerful guarantee.
(7), the utility model can be common to stone curtain wall, ceramic plate curtain wall, metal plate curtain wall etc., range of application is very extensively.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is the plane structure sketch map after the utility model assembling.
Fig. 2 is the facade structures sketch map after the utility model assembling.
Fig. 3 is the plane structure sketch map of part one.
Fig. 4 is the facade structures sketch map of part one.
Fig. 5 is the plane structure sketch map of part two.
Fig. 6 is the facade structures sketch map of part two.
Fig. 7 is the plane structure sketch map of part three.
Fig. 8 is the facade structures sketch map of part three.
Fig. 9 is the right view of Fig. 8.
Figure 10 is the plane structure sketch map of part four.
Figure 11 is the facade structures sketch map of part four.
Figure 12 is the installation drawing of the utility model.
Reference numeral: 1-part one, 1.1-groove, 1.2-collude groove, 1.3-bar hole, 1.4-circular hole;
2-part two, 2.1-plate I, 2.2-plate II, 2.3-are uncovered, 2.4-circular hole, 2.5-plug;
3-part three, 3.1-flat board, 3.2-web, 3.3-slotted hole I, 3.4-slotted hole II, 3.5-recess;
Overhang plate, 4.4-circular hole, 4.5-of 4-part four, 4.1-front wing panel, 4.2-rear fender, 4.3-buckled limit, 4.6-rubber sheath, 4.7-dop;
5-screw, 6-bolt I, 7-bolt II, 8-curtain wall main joist, 9-major structure of construction, 10-curtain wall plane materiel, 11-pre-groove, 12-fluid sealant.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 2; This space three-dimensional adjustable flexibility Curtainwall connector; Part 1, part 22, part 33 and part 44 by being connected between curtain wall main joist and the curtain wall plane materiel 10 assemble, and the material of part 1, part 22, part 33 and part 44 is steel, aluminium or alloy material.
Referring to Fig. 3, shown in Figure 4; Said part one 1 integral body are the rectangular plate shape structure; Be bent into groove 1.1 in the middle of the plate body; Groove 1.1 bottom surfaces have the bar hole 1.3 that extends to the plate body bottom from the plate body upper edge, respectively are distributed with two circular holes 1.4 that are used to connect curtain wall main joist 8 on the plate body of groove 1.1 left and right sides, and plate body bends inwards towards the limit, the one side left and right sides of part 22 and becomes to collude groove 1.2.
Referring to Fig. 5, shown in Figure 6; Said part 22 is that Bian Chu interconnects and forms in the left and right sides by the plate I2.1 that laterally arranges and plate II2.2; Wherein the connecting portion in plate I and plate II left side have vertically that web 3.2 width with part 33 adapt uncovered 2.3; The spacing between plate I and the plate II and the thickness of web 3.2 adapt; The centre of plate I2.1 and plate II2.2 vertically is provided with two circular holes 2.4 that are used for union piece 1 and part 33, and plate I2.1 each side has a plug 2.5 of bending outwardly towards the one side of part 1.
Referring to Fig. 7, Fig. 8, shown in Figure 9; Said part 33 is by flat board 3.1 and the web 3.2 vertical T shape structures that connect into; Circular hole 2.4 opposite positions on web 3.2 and the part 22 vertically have slotted hole I3.3; Dull and stereotyped 3.1 laterally have two slotted hole II3.4 that are used for union piece 44 with respect to web 3.2 left and right sides, and web is being provided with recess 3.5 with dull and stereotyped 3.1 adjacents in both sides about in the of 3.2.
Referring to Figure 10, shown in Figure 11; Said part 44 is by front wing panel 4.1, rear fender 4.2; And the plate 4.3 of overhanging that is vertically connected between the two constitutes, front wing panel 4.1 with part 33 on corresponding position, slotted hole II3.4 position have circular hole 4.4, front wing panel about in the of 4.1 both sides towards the one side of part 33 be bent into inwardly buckle limit 4.5; The rear fender of part 44 has dop 4.7 in both sides about in the of 4.2, is with rubber sheath 4.6 on the dop.
Referring to Fig. 1, Fig. 2, shown in Figure 12; Said part 1 passes circular hole 1.4 by screw 5 and is connected with curtain wall main joist 8; The plug 2.5 of part 22 left and right sides slips into colluding in the groove 1.2 of part one 1 left and right sides; The web 3.2 of part 33 inserts between plate I2.1 and the plate II2.2 through uncovered 2.3 of part 22 left side connecting portions; Pass the circular hole 2.4 on the part 22, the slotted hole I3.3 on the part 33 successively by bolt I6 again, and the bar hole on the part 1 1.3, the three is fixed; The flat board of part 33 slips into part 44 front wing panels and two buckles in the limit 4.5 about in the of 4.1 in both sides about in the of 3.1; Simultaneously up and down two button limits 4.5 embed in the recess 3.5 on parts 3 three web both sides 3.2 about, pass slotted hole II3.4 and the circular hole 4.4 on part 44 front wing panels 4.1 on the part 33 dull and stereotyped 3.1 by bolt II7 again, and part 44 and part 33 are fixed; The rear fender of part 44 is with rubber sheath 4.6 in both sides about in the of 4.2, and rear fender inserts respectively in the pre-groove 11 of two curtain wall plane materiels 10 up and down on both sides about in the of 4.2.
The job practices of this space three-dimensional adjustable flexibility Curtainwall connector, construction sequence is following:
Step 1 is connected curtain wall main joist 8 with major structure of construction;
Step 2, installing space three-dimensional adjustable flexibility Curtainwall connector between curtain wall main joist 8 and curtain wall plane materiel 10;
A, part one 1 usefulness screws 4 are passed circular hole 1.4 be connected with main joist;
B, the plug 2.5 of part 22 left and right sides is slipped into colluding in the groove 1.2 of part one 1 left and right sides;
C, the web 3.2 of part 33 is inserted between plate I2.1 and the plate II2.2 through uncovered 2.3 of part 22 left side connecting portions;
D, pass the circular hole 2.4 on the part 22, the slotted hole I3.3 on the part 33 successively with bolt I6, and the bar hole on the part 1 1.3, the three is fixed;
E, the flat board of part 33 is slipped into part 44 front wing panels and two buckles in the limit 4.5 about in the of 4.1 in both sides about in the of 3.1; Simultaneously up and down two button limits 4.5 embed in the recess 3.5 on web both sides about in the of 3.2 of parts 33; Pass slotted hole II3.4 and the circular hole 4.4 on part 44 front wing panels 4.1 on the part 33 dull and stereotyped 3.1 with bolt II7, part 44 and part 33 are fixed;
F, put rubber sheath 4.6 in both sides about in the of 4.2, rear fender is inserted respectively in the pre-groove 11 of two curtain wall plane materiels 10 up and down on both sides about in the of 4.2 at the rear fender of part 44;
Step 3 after 10 installations of curtain wall plane materiel, is regulated the relative position of part 1 and part 22 through the bar hole on the part 1 1.3, thereby the curtain wall plane materiel is carried out up-down adjustment; Regulate the relative position of part 33 and part 22 through the slotted hole I3.3 on part 33 webs 3.2, thereby the curtain wall plane materiel is carried out the front and back adjusting; Slotted hole II3.4 through on the part 33 dull and stereotyped 3.1 regulates the relative position of part 44 and part 33, thereby the curtain wall plane materiel is carried out left and right adjusting.
Step 4, the seam crossing filling with sealant 12 between curtain wall plane materiel 10.