CN202241547U - Hollow mould for concrete precast plate girder - Google Patents
Hollow mould for concrete precast plate girder Download PDFInfo
- Publication number
- CN202241547U CN202241547U CN2011204153510U CN201120415351U CN202241547U CN 202241547 U CN202241547 U CN 202241547U CN 2011204153510 U CN2011204153510 U CN 2011204153510U CN 201120415351 U CN201120415351 U CN 201120415351U CN 202241547 U CN202241547 U CN 202241547U
- Authority
- CN
- China
- Prior art keywords
- hollow mould
- mould
- plate girder
- rubber mandrel
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a hollow mould for a concrete precast plate girder. The hollow mould is characterized in that a plurality of positioning hoops are longitudinally arranged on a rubber core mould; a charging valve is arranged at one end of the rubber core mould; and a plurality of hooks are arranged on the two sides of the positioning hoops. The hollow mould has the following beneficial effects that: the rubber core mould is arranged to replace the ordinary timber formwork in the construction process of precasting the concrete plate girder; and the hollow mould is easy and fast to operate, can be recycled and saves materials and cost.
Description
Technical field
The utility model relates to a kind of hollow mould of building engineering shuttering device, particularly a kind of concrete prefabricated plate-girder.
Background technology
In building engineering construction; During prefabricated large-scale concrete hollow slab girder, its hollow part adopts the normal wood template to add the method for chapelet usually, and the not only molding of this method, formwork erection, form removal are time-consuming; And mould material can not have enough to meet the need use; Cause the consumption of material big, speed of application is slow, and is extremely uneconomical.
Summary of the invention
A kind of concrete prefabricated plate-girder hollow mould that the utility model provides has overcome time-consuming, the high material consumption of method that above-mentioned employing normal wood template adds chapelet, and speed of application is slow, extremely uneconomic problem.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: a kind of concrete prefabricated plate-girder hollow mould, rubber mandrel vertically be provided with the multiple tracks spacer ferrule.
One end of rubber mandrel is provided with charging valve.
The both sides of spacer ferrule are provided with many hooks.
The cross section of said rubber mandrel is oval.
A kind of concrete prefabricated plate-girder hollow mould that the utility model provides through in precast concrete plate-girder work progress, rubber mandrel being set, substitutes common plank sheathing, and simple and quick, mould can have enough to meet the need use, and economical with materials is saved cost.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further:
Fig. 1 is the concrete prefabricated plate-girder formwork erection of a utility model side view;
Fig. 2 is that the A-A of Fig. 1 is to view;
Fig. 3 is the structure chart of the utility model device;
Fig. 4 is that the B-B of Fig. 3 is to view.
Wherein: 5, enclose Eurya plant, 6, the precast slab beam steel, 7-1, steel form, 7-2, side wall template, 8, tie rod.9, concrete floor.
The specific embodiment
As shown in Figure 4, a kind of concrete prefabricated plate-girder hollow mould, rubber mandrel 1 vertically be provided with multiple tracks spacer ferrule 2, an end of rubber mandrel 1 is provided with charging valve 3, the both sides of spacer ferrule 2 are provided with many hooks 4.
The cross section of rubber mandrel 1 is oval, and the size of rubber mandrel 1 is confirmed by designing requirement.
Embodiment:
1) rubber mandrel 1 adopts the bilateral vulcanization adhesive plaster in processing factory, to make moulding according to design size, and bilateral vulcanization adhesive plaster breaking strength (N/25 mm): warp-wise is greater than 1000, and broadwise is greater than 800; Glue and cloth adhesion strength (N/25 mm): greater than 15.Rubber mandrel 1 is inflated to working pressure breaking strength (N/25 mm), is not more than 20% through the 8h pressure drop.
2) adopt 12 round steel in processing factory, to make spacer ferrule 2 according to design size (identical with cavity size), its upper and lower both sides hook 4 adopts the 8# iron wire to process.
3) treat the concrete prefabricated board beam steel set up finish after, spacer ferrule 2 is inserted in manual work, spacing 0.5~0.8m, its hook 4 hangs firmly with the reinforcing bar of colligation.
4) before rubber mandrel 1 used, the interview inflation on ground earlier was with the intact situation of inspection rubber mandrel 1.After being coated with full releasing agent around the intact rubber mandrel 1, penetrate in the steel reinforcement cage through the rope traction.
5) rubber is opened charging valve 3 after core 1 is in place, with the air compressor machine inflation, must not note superpressure during rubber mandrel 1 inflation, is not more than 0.03Ma.
6) casting concrete is built and must be used the high frequency tamping rod to vibrate simultaneously from both sides when vibrating in the process, preventing rubber mandrel 1 partial left dextroposition, and vibrates and can not touch rubber mandrel 1, in order to avoid damage rubber mandrel 1.
7) treat that concrete initial set reaches the form removal condition after, open charging valve 3 gas discharged, rubber mandrel 1 just can come off voluntarily, local not separated part is taked the method demoulding of artificial treatment, and then pulls out steel reinforcement cage through rope.
Claims (4)
1. concrete prefabricated plate-girder hollow mould is characterized in that: rubber mandrel (1) vertically be provided with multiple tracks spacer ferrule (2).
2. a kind of concrete prefabricated plate-girder hollow mould according to claim 1, it is characterized in that: an end of rubber mandrel (1) is provided with charging valve (3).
3. a kind of concrete prefabricated plate-girder hollow mould according to claim 1, it is characterized in that: the both sides of spacer ferrule (2) are provided with many hooks (4).
4. a kind of concrete prefabricated plate-girder hollow mould according to claim 1 and 2 is characterized in that: the cross section of said rubber mandrel (1) is for oval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204153510U CN202241547U (en) | 2011-10-27 | 2011-10-27 | Hollow mould for concrete precast plate girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204153510U CN202241547U (en) | 2011-10-27 | 2011-10-27 | Hollow mould for concrete precast plate girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202241547U true CN202241547U (en) | 2012-05-30 |
Family
ID=46102841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204153510U Expired - Fee Related CN202241547U (en) | 2011-10-27 | 2011-10-27 | Hollow mould for concrete precast plate girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202241547U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104260198A (en) * | 2014-10-25 | 2015-01-07 | 中国二十二冶集团有限公司 | Concrete prefabricated wall body and vertical pouring hole remaining method thereof |
CN111469252A (en) * | 2020-04-17 | 2020-07-31 | 罗智 | Double-layer inflatable membrane concrete formwork system and construction method thereof |
-
2011
- 2011-10-27 CN CN2011204153510U patent/CN202241547U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104260198A (en) * | 2014-10-25 | 2015-01-07 | 中国二十二冶集团有限公司 | Concrete prefabricated wall body and vertical pouring hole remaining method thereof |
CN111469252A (en) * | 2020-04-17 | 2020-07-31 | 罗智 | Double-layer inflatable membrane concrete formwork system and construction method thereof |
CN111469252B (en) * | 2020-04-17 | 2022-03-01 | 罗智 | Double-layer inflatable membrane concrete formwork system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102121310B (en) | Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof | |
CN208543603U (en) | Precast prestressed floor production mould and production equipment | |
CN101525917A (en) | Construction technology of wall body | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN104652815A (en) | Construction method for pouring water-stopping upstanding beams in kitchens and toilets | |
CN201386392Y (en) | Concrete hollow supporting body used for wall body construction technique | |
US20140183776A1 (en) | Manufacturing concrete | |
CN104260198A (en) | Concrete prefabricated wall body and vertical pouring hole remaining method thereof | |
CN104164951B (en) | Stair landing and construction method thereof | |
CN104532990A (en) | Truss steel bar double-layer gypsum fiberboard, disassembly-free formwork wall structure and construction method | |
CN202241547U (en) | Hollow mould for concrete precast plate girder | |
CN106284789B (en) | Construction technology for controlling cast-in-situ floor Forming Quality | |
CN108214837A (en) | Precast prestressed floor production mould, production equipment and production technology | |
CN102409848A (en) | Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor | |
CN205043936U (en) | High -speed railway ballastless track opens production line of track board with two -way elder generation | |
CN106607989A (en) | Rail transit post-stressed U-shaped beam construction technique | |
WO2013014157A1 (en) | Hollow-core concrete slab | |
CN109339089A (en) | A kind of rim of a cup isolated footing cup core forming method | |
CN108442234A (en) | Edge of a wing isolating pad and its construction method for prefabricated case beam | |
CN204435616U (en) | Truss bars double layer fibre gypsum plank, non-dismantling formwork wall body structure | |
CN106142337B (en) | A kind of mechanical-moulded dry concrete bottom plate with ribbing and preparation method thereof | |
CN215106590U (en) | Assembled prefabricated hollow column and production and manufacturing process thereof | |
CN104631695A (en) | Steel bar truss gypsum board, novel floor support plate and construction method of novel floor support plate | |
CN107035045A (en) | A kind of precast concrete bidirectional hollow plate and preparation method thereof | |
CN104453235B (en) | Current conversion station fire wall construction technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20201027 |