CN202231419U - Dual-protection structure of over 220V breaker failure protection loop - Google Patents

Dual-protection structure of over 220V breaker failure protection loop Download PDF

Info

Publication number
CN202231419U
CN202231419U CN2011202545743U CN201120254574U CN202231419U CN 202231419 U CN202231419 U CN 202231419U CN 2011202545743 U CN2011202545743 U CN 2011202545743U CN 201120254574 U CN201120254574 U CN 201120254574U CN 202231419 U CN202231419 U CN 202231419U
Authority
CN
China
Prior art keywords
protection
loop
breaker
bus differential
breaker failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202545743U
Other languages
Chinese (zh)
Inventor
陈和龙
周伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Electric Power Test and Research Institute
Original Assignee
Guizhou Electric Power Test and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Electric Power Test and Research Institute filed Critical Guizhou Electric Power Test and Research Institute
Priority to CN2011202545743U priority Critical patent/CN202231419U/en
Application granted granted Critical
Publication of CN202231419U publication Critical patent/CN202231419U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a dual-protection structure of an over 220V breaker failure protection loop. A breaker failure protection loop comprises a line protection trip-out outlet contact (1) and a breaker failure starting current contact (2). Bus differential protection devices (3) are started by the breaker failure protection loop, and two bus differential protection devices (3) are provided. A switching pressure plate (4) is connected on the breaker failure protection loop. The breaker failure protection loop matches the bus differential protection devices (3) with dual configuration via the switching pressure plate (4). The switching pressure plate is additionally arranged in a failure starting loop, the only breaker failure starting loop is switched to be accessed to one of the bus differential protection devices via the switching pressure plate, thereby guaranteeing that if any of the bus differential protection devices is out of operation, the breaker failure starting loop can always be accessed to the other running bus differential protection device. Therefore, a danger that a breaker lacks failure protection is avoided, and electrical network accidents are prevented from expansion.

Description

The duplicate protection structure in the above breaker fail protection of 220kV loop
Technical field
The utility model relates to the duplicate protection structure in the above breaker fail protection of a kind of 220kV loop, belongs to the electric power protection technical field.
Background technology
In electric power system, must install breaker fail protection according to rules regulation 220kV and above circuit breaker, and want dualization configuration.At present, the mode that generally adopts to this situation is that route protection, bus differential protection all are dualization configurations, and breaker fail protection starts the corresponding dualization bus differential protection of contact deactivation through the route protection failed output of dualization configuration respectively.
But the above breaker failure of early stage 220kV starts the loop to be made up of the mode of the breaker failure starting current contact tandem promoter of route protection tripping operation outlet contact and circuit breaker auxiliary protection, as shown in Figure 2; If can not realize dualization configuration, will cause after the bus differential protection that inserts breaker failure startup loop is out of service because of reasons such as maintenance, circuit breaker will lose the serious consequence of failure protection, possibly cause enlarging power grid accident.In order to adapt to the requirement of present rules; The protective device of early stage single coverization configuration is being done dualization configuration now; Problem with regard to the bus differential protection of the route protection that has single cover configuration and breaker fail protection and dualization configuration does not match must adopt remedial measures.
The utility model content
The technical problem that the utility model will solve provides a kind of simple in structure, easy construction, can realize the problem that the bus differential protection device of breaker fail protection loop and the dualization configuration of single cover configuration matches, and can overcome the deficiency of prior art.
The technical scheme of the utility model is: the breaker fail protection loop comprises route protection tripping operation outlet contact and breaker failure starting current contact; Breaker fail protection loop start bus differential protection device; The quantity of bus differential protection device is two covers; On the breaker fail protection loop, be connected with the switching pressing plate, the breaker fail protection loop matches through the bus differential protection device that switches pressing plate and dualization configuration.
Compare with prior art; Because of the early stage protective device of building transformer station is overlapping configuration to the process of dualization transformation from single; Exist the transformation of dualization of route protection to lag behind the dualization transformation of bus differential protection; Thereby cause the breaker fail protection can not be corresponding one by one, do not reach the purpose of dualization configuration with bus differential protection.What is more, after the bus differential protection that inserts unique breaker failure startup loop is out of service because of certain reason, circuit breaker will lose failure protection.To this problem; The utility model is through increasing a switching pressing plate in malfunctioning startup loop; Switch which cover bus differential protection device of unique breaker failure startup loop access through switching pressing plate; Guarantee that after arbitrary cover bus differential protection is out of service breaker failure starts the bus differential protection that another set of operation can both be inserted in the loop.Thereby avoided circuit breaker to lose the danger of failure protection, prevented the expansion of power grid accident.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation in the existing above breaker fail protection of 220kV loop;
A is a route protection tripping operation outlet contact among Fig. 2; B is a breaker failure starting current contact; C is for inserting protection equipment for busbar.
Embodiment
Embodiment: as shown in Figure 1; The breaker fail protection loop comprises route protection tripping operation outlet contact 1 and breaker failure starting current contact 2, and breaker fail protection loop start bus differential protection device 3: the quantity of bus differential protection device 3 is two covers, distinguishes with A, B respectively among the figure; On the breaker fail protection loop, increase by one and switch pressing plate 4; When switching 4 dozens of pressing plates to A bus differential protection device 3, A bus differential protection device 3 is inserted in malfunctioning loop, when switching 4 dozens of pressing plates to B bus differential protection device 3; B bus differential protection device 3 is inserted in malfunctioning loop, thereby has realized the switching of breaker fail protection loop to bus differential protection device 3.In the actual motion, when A bus differential protection device 3 is out of service, can get to B bus differential protection device 3, make the breaker fail protection loop insert B bus differential protection device 3 switching pressing plate 4; When B bus differential protection device 3 is out of service, can get to A bus differential protection device 3 with switching pressing plate 4, make the breaker fail protection loop insert A bus differential protection device 3, guarantee that breaker fail protection exists all the time.

Claims (1)

1. one kind More than the 220kVThe duplicate protection structure in breaker fail protection loop; The breaker fail protection loop comprises route protection tripping operation outlet contact (1) and breaker failure starting current contact (2); Breaker fail protection loop start bus differential protection device (3); It is characterized in that: the quantity of bus differential protection device (3) is two covers; On the breaker fail protection loop, be connected with and switch pressing plate (4), the breaker fail protection loop matches through the bus differential protection device (3) that switches pressing plate (4) and dualization configuration.
CN2011202545743U 2011-07-19 2011-07-19 Dual-protection structure of over 220V breaker failure protection loop Expired - Fee Related CN202231419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202545743U CN202231419U (en) 2011-07-19 2011-07-19 Dual-protection structure of over 220V breaker failure protection loop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202545743U CN202231419U (en) 2011-07-19 2011-07-19 Dual-protection structure of over 220V breaker failure protection loop

Publications (1)

Publication Number Publication Date
CN202231419U true CN202231419U (en) 2012-05-23

Family

ID=46081993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202545743U Expired - Fee Related CN202231419U (en) 2011-07-19 2011-07-19 Dual-protection structure of over 220V breaker failure protection loop

Country Status (1)

Country Link
CN (1) CN202231419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618296A (en) * 2013-12-06 2014-03-05 国家电网公司 Breaker failure protection blocking method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618296A (en) * 2013-12-06 2014-03-05 国家电网公司 Breaker failure protection blocking method
CN103618296B (en) * 2013-12-06 2016-08-17 国家电网公司 Breaker fail protection blocking method

Similar Documents

Publication Publication Date Title
CN102270836B (en) Wide-area over-current protection method and system for power distribution network
CN205231835U (en) Structure for large -scale thermal power factory unit high pressure service power each other is being equipped with
CN104078946B (en) A kind of wide area distance protecting method towards transformer station
CN203261119U (en) Double-path DC power supply switching control circuit
CN107294073B (en) Control protection system of hybrid topology direct current circuit breaker
CN108400576A (en) A kind of implementation method of alternating current-direct current mixing distribution protection
CN204156517U (en) A kind of intelligent substation low-voltage bus bar protection system
CN103986128A (en) Low-voltage side accelerated trip protection technology based on intelligent substation
CN102545375B (en) Automatic switching on/off method for emergency power supply of power plant
CN102801207A (en) Backup auto-switching voltage loss start interlocking method for multi-power double-bus substation
CN105633917A (en) Unified power flow controller-based fault processing method and system
CN202712819U (en) Protection system capable of realizing breaker failure triggering relevant trips of interconnecting transformer
CN202949138U (en) Low-voltage cable branch box
CN202231419U (en) Dual-protection structure of over 220V breaker failure protection loop
CN209170039U (en) A kind of automatic redundancy zero propagation switching system of two dc power supply
CN105375437A (en) Main transformer low voltage backup protective device with break variable startup
CN203481822U (en) Closed loop power supply model of medium voltage 10 kilovolt power distribution network
CN102108527B (en) Method and system for supplying power to large aluminum electrolytic plant
CN205610208U (en) Fault handling system based on unified power flow controller
CN110556794B (en) Bus bar protection configuration method of multi-end hybrid direct current system
CN206790077U (en) A kind of device that mother prepared auto restart is realized with circuit under-voltage protection and reclosing
CN202643860U (en) Reliability-improved aluminum electrolysis industry power supply system
CN202084985U (en) Self-startup power supply apparatus
CN201868854U (en) GIS (gas insulated switchgear) structure changing 500KV main power supply into 66KV side power supply
CN201298734Y (en) Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20140719

EXPY Termination of patent right or utility model