CN202227757U CN2011201891236U CN201120189123U CN202227757U CN 202227757 U CN202227757 U CN 202227757U CN 2011201891236 U CN2011201891236 U CN 2011201891236U CN 201120189123 U CN201120189123 U CN 201120189123U CN 202227757 U CN202227757 U CN 202227757U
Authority
CN
China
Prior art keywords
plate
joint
coupling assembling
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201891236U
Other languages
Chinese (zh)
Inventor
邢海军
李茂华
田璐
袁骏
陈海波
张甲雷
王宁华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN2011201891236U priority Critical patent/CN202227757U/en
Application granted granted Critical
Publication of CN202227757U publication Critical patent/CN202227757U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an inserting plate connecting component and a power transmission line steel tube tower. The inserting plate connecting component comprises two node plates and two inserting plates, wherein the two node plates are arranged in a cross shape to form a node plate joint, and the two inserting plates are arranged in a cross shape to form an inserting plate joint, the node plate joint and the inserting plate joint are in butt connection by a connecting member through a fastening piece, and the connecting member comprises two, three or four angular pieces, wherein the two angular pieces are arranged symmetrically relative to the center of the inserting plate connecting component. The inserting plate connecting component realizes the advantages of simple connection, good structure stress harmony, strong stability and sufficient stress of angle steel or a bending plate.

Description

Plate coupling assembling and steel tube tower in electric transmission line
Technical field
The utility model relates to the plate joint construction in the steel tube tower in electric transmission line, particularly, relates to a kind of plate coupling assembling.
Background technology
The coupling assembling that is usually used in connecting the cross plate of steel tube tower in electric transmission line is eight stripe board.Fig. 1 (a)-(h) is the cross plate structural representation that eight stripe board of available technology adopting connect.In Fig. 1 (a)-(h), comprise that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5 and 6 that 4 and two across are arranged to the plate joint, gusseted joint and plate joint adopt bolts to link together through stripe board 9.The coupling assembling that the cross plate is connected with steel pipe 2 is the weak part that cross plate node carries, and coupling assembling is under pressure and the easy flexing that takes place of the effect of moment of flexure.Eight stripe board 9 that are used for the connection of cross plate are prone to the destruction that bends at the mating interface place, and its reason mainly is that cross plate connection gap rigidity is more weak relatively and the whole stressed harmony connection combination is relatively poor.
Therefore, need to propose a kind of new plate coupling assembling and solve above-mentioned any problem of the prior art.
The utility model content
A purpose of the utility model is a kind of plate coupling assembling to be provided, to realize that connection is simple, structure stress harmony is good, stability strong and the requirement of cost savings.
An aspect according to the utility model; A kind of plate coupling assembling is provided; Comprise that two across are arranged to the gusset plate of gusseted joint and the plate that two across are arranged to the plate joint; Gusseted joint and plate joint adopt the securing member butt joint to link together through connecting elements, and this connecting elements comprises two, three or four horn, and wherein these two horn are about the center symmetric arrangement of plate coupling assembling.
Preferably, horn is an angle steel.
Preferably, securing member is a bolt.
According to the utility model on the other hand; A kind of steel tube tower in electric transmission line is provided; Between the steel pipe of this steel tube tower in electric transmission line through interconnecting according to above-mentioned plate coupling assembling; Two gusset plate across of the gusseted joint of this plate coupling assembling are welded in a steel pipe, and two plate across of the plate joint of this plate coupling assembling are welded in another steel pipe.
An advantage of the utility model is, because the total bearing capacity of cross plate connected node mainly receives the influence of the form and the rigidity of coupling assembling.With respect to the cross plate connected node that adopts eight stripe board to connect, the utility model when adopting angle steel or bending plate to connect, have connect simple, structure stress harmony is good, stability strong and angle steel or the stressed sufficient advantage of bending plate.
With reference to the detailed description of accompanying drawing to the exemplary embodiment of the utility model, it is clear that further feature of the utility model and advantage thereof will become through following.
Description of drawings
The accompanying drawing that constitutes the part of manual has been described the embodiment of the utility model, and is used to explain the principle of the utility model together with the description.
With reference to accompanying drawing, according to following detailed, can be expressly understood the utility model more, wherein:
Fig. 1 (a)-(h) is the sketch map that the plate coupling assembling of prior art is shown; Wherein, Fig. 1 (a) is the elevation of this plate coupling assembling; Fig. 1 (b) is the D-D sectional view of Fig. 1 (a); Fig. 1 (c) is the view of plate coupling assembling after removing gusset plate 3,4 and steel pipe 2 of Fig. 1 (a), and Fig. 1 (d), Fig. 1 (e) and Fig. 1 (f) are respectively A-A sectional view, B-B sectional view and the C-C sectional view of Fig. 1 (c), and Fig. 1 (g) and Fig. 1 (h) are respectively the elevation and the lateral view of the stripe board 9 in this plate coupling assembling.
Fig. 2 (a)-(h) is the sketch map that illustrates according to the plate coupling assembling that is used for steel tube tower in electric transmission line of the embodiment of the utility model; Wherein, Fig. 2 (a) is the elevation of this plate coupling assembling; Fig. 2 (b) is the D-D sectional view of Fig. 2 (a); Fig. 2 (c) is the view of plate coupling assembling after removing gusset plate 3,4 and steel pipe 2 of Fig. 2 (a), and Fig. 2 (d), Fig. 2 (d) and Fig. 2 (f) are respectively A-A sectional view, B-B sectional view and the C-C sectional view of Fig. 2 (c), and Fig. 2 (g) and Fig. 2 (h) are respectively the elevation and the lateral view of the angle steel 7 in this plate coupling assembling.
Fig. 3 is the schematic sketch map of plate coupling assembling that illustrates according to another embodiment of the utility model.
Fig. 4 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Fig. 5 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Fig. 6 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Fig. 7 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
The specific embodiment
To describe the various exemplary embodiments of the utility model now with reference to accompanying drawing in detail.It should be noted that: only if specify in addition, otherwise the positioned opposite of parts of in these embodiment, setting forth and step, numeral expression formula and numerical value do not limit the scope of the utility model.
Below be illustrative to the description only actually of at least one exemplary embodiment, never as any restriction to the utility model and application or use.
Possibly not go through for the known technology of association area those of ordinary skill, method and apparatus, but under suitable situation, said technology, method and apparatus should be regarded as the part of manual.
In shown here and all examples of discussing, it only is exemplary that any occurrence should be interpreted as, rather than as restriction.Therefore, other example of exemplary embodiment can have different values.
It should be noted that: represent similar terms in similar label and the letter accompanying drawing below, therefore,, then in accompanying drawing subsequently, need further not discuss it in case defined in a certain Xiang Zaiyi accompanying drawing.
Fig. 2 (a)-(h) is the sketch map that illustrates according to the plate coupling assembling that is used for steel tube tower in electric transmission line of the embodiment of the utility model.
Plate coupling assembling shown in Fig. 2 (a)-(h); Two gusset plates 3 and 4 across of the gusseted joint of this plate coupling assembling are welded in a steel pipe 2; Two plates 5 and 6 across of the plate joint of this plate coupling assembling are welded in another steel pipe 1; This plate assembly comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5,6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt securing member 8 butt joints to link together through connecting elements, and this connecting elements comprises four angle steel 7.
Fig. 3 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Plate coupling assembling as shown in Figure 3; Two gusset plates 3 and 4 across of the gusseted joint of this plate coupling assembling are welded in a steel pipe 2; Two plates 5 and 6 across of the plate joint of this plate coupling assembling are welded in another steel pipe 1; This plate coupling assembling comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5 and 6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt the securing member butt joint to link together through connecting elements, and this connecting elements comprises three horn, and wherein this horn can be an angle steel 7.
Fig. 4 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Plate coupling assembling as shown in Figure 4; Two gusset plates 3 and 4 across of the gusseted joint of this plate coupling assembling are welded in a steel pipe 2; Two plates 5 and 6 across of the plate joint of this plate coupling assembling are welded in another steel pipe 1; This plate assembly comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5,6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt securing member 8 butt joints to link together through connecting elements, and this connecting elements comprises two angle steel 7, and these two angle steel 7 are about the center symmetric arrangement of plate coupling assembling.
From the experimental study result, when adopting two or three angle steel, saved material and improved the eccentric compression bearing capacity of connected node.When adopting four angle steel, the long-pending sectional area than eight stripe board (material Q345) of angle cross section has increased by 7.75%, but the eccentric compression bearing capacity of connected node has improved 43.05%.
The utility model adopts angle steel to connect and can realize connecting simply, structure stress harmony is good, stability is strong and the requirement of cost savings, and has improved the rigidity and the Total tune property of cross plate node, thereby improves the stressed of node.This angle steel connects the master that can be used for connecting in the steel tube tower, tiltedly material, the connecting portion such as oblique material that intersects, and process simplyr, is prone to installation.
Fig. 5 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
Plate coupling assembling as shown in Figure 5; Two gusset plates 3 and 4 across of the gusseted joint of this plate coupling assembling are welded in a steel pipe 2; Two plates 5 and 6 across of the plate joint of this plate coupling assembling are welded in another steel pipe 1; This plate assembly comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5,6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt securing member 8 butt joints to link together through connecting elements, and this connecting elements comprises two bending plates 7 ', and these two bending plates 7 ' are about the center symmetric arrangement of plate coupling assembling.Wherein, this bending plate forms through panel-bending and comprises two parts that are perpendicular to one another.
Fig. 6 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
As shown in Figure 6; The plate assembly comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5,6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt securing member 8 butt joints to link together through connecting elements, and this connecting elements comprises three bending plates 7 '.
Fig. 7 is the sketch map that illustrates according to the plate coupling assembling of another embodiment of the utility model.
As shown in Figure 7; The plate assembly comprises that two across are arranged to the gusset plate 3 of gusseted joint and the plate 5,6 that 4 and two across are arranged to the plate joint; Gusseted joint and plate joint adopt securing member 8 butt joints to link together through connecting elements, and this connecting elements comprises four bending plates 7 '.
Alternatively, the coupling part that between two parts that are perpendicular to one another of bending plate, also has a linear or circular arc.
From the experimental study result, when adopting two or three bending plates, saved material and improved the eccentric compression bearing capacity of connected node.When adopting four bending plates, the bending plate sectional area has increased by 7.5% than the sectional area of eight stripe board (material Q345), and the eccentric compression bearing capacity of connected node has but improved 39.86%.
The utility model adopts bending plate to connect and can realize connecting simply, structure stress harmony is good, stability is strong and the requirement of cost savings.And when adopting bending plate to connect, structure stress harmony is better, bending plate is stressed more abundant.
To sum up, stronger, the cost of the plate coupling assembling bearing capacity of the utility model is more saved.
Though specify through example some specific embodiments to the utility model, it should be appreciated by those skilled in the art that above example only is in order to describe, rather than in order to limit the scope of the utility model.It should be appreciated by those skilled in the art, can under the situation of scope that does not break away from the utility model and spirit, above embodiment be made amendment.The scope of the utility model is limited accompanying claims.

Claims (4)

1. plate coupling assembling; Comprise that two across are arranged to the plate (5,6) that the gusset plate of gusseted joint (3,4) and two across are arranged to the plate joint; Gusseted joint and plate joint adopt the securing member butt joint to link together through connecting elements; It is characterized in that said connecting elements comprises two, three or four horn, wherein said two horn are about the center symmetric arrangement of plate coupling assembling.
2. plate coupling assembling according to claim 1 is characterized in that said horn is an angle steel.
3. plate coupling assembling according to claim 1 and 2 is characterized in that said securing member is a bolt.
4. steel tube tower in electric transmission line; It is characterized in that; Between the steel pipe of said steel tube tower in electric transmission line through interconnecting according to the described plate coupling assembling of one of claim 1 to 3; Two gusset plates (3,4) across of the gusseted joint of this plate coupling assembling is welded in a steel pipe (2), and two plates (5,6) across of the plate joint of this plate coupling assembling is welded in another steel pipe (1).
CN2011201891236U 2011-06-08 2011-06-08 Inserting plate connecting component and power transmission line steel tube tower Expired - Lifetime CN202227757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201891236U CN202227757U (en) 2011-06-08 2011-06-08 Inserting plate connecting component and power transmission line steel tube tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201891236U CN202227757U (en) 2011-06-08 2011-06-08 Inserting plate connecting component and power transmission line steel tube tower

Publications (1)

Publication Number Publication Date
CN202227757U true CN202227757U (en) 2012-05-23

Family

ID=46078346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201891236U Expired - Lifetime CN202227757U (en) 2011-06-08 2011-06-08 Inserting plate connecting component and power transmission line steel tube tower

Country Status (1)

Country Link
CN (1) CN202227757U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296869A (en) * 2011-06-08 2011-12-28 中国电力科学研究院 Plugboard connection assembly and transmission line steel tube tower
CN102322170A (en) * 2011-06-08 2012-01-18 中国电力科学研究院 Inserted plate connection assembly and power transmission line steel pipe tower
CN104612454A (en) * 2015-02-05 2015-05-13 中国电力工程顾问集团西南电力设计院有限公司 Main material breaking joint for cross section of filler-plate-free four-combination angle steel of transmission tower
CN109138479A (en) * 2018-09-06 2019-01-04 山东电力工程咨询院有限公司 A kind of power transmission tower reinforcing friction-type bolt angle steel clamp device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296869A (en) * 2011-06-08 2011-12-28 中国电力科学研究院 Plugboard connection assembly and transmission line steel tube tower
CN102322170A (en) * 2011-06-08 2012-01-18 中国电力科学研究院 Inserted plate connection assembly and power transmission line steel pipe tower
CN104612454A (en) * 2015-02-05 2015-05-13 中国电力工程顾问集团西南电力设计院有限公司 Main material breaking joint for cross section of filler-plate-free four-combination angle steel of transmission tower
CN109138479A (en) * 2018-09-06 2019-01-04 山东电力工程咨询院有限公司 A kind of power transmission tower reinforcing friction-type bolt angle steel clamp device

Similar Documents

Publication Publication Date Title
CN202227757U (en) Inserting plate connecting component and power transmission line steel tube tower
CN101285323A (en) Node of the end sheet in weak axis direction of H-type column connecting beam column and method for making same
CN102296869A (en) Plugboard connection assembly and transmission line steel tube tower
CN203346882U (en) Column base
CN102817890A (en) Fastener
CN103015596A (en) Detachable steel structure platform and construction method thereof
CN102322170A (en) Inserted plate connection assembly and power transmission line steel pipe tower
CN202117386U (en) K-joint for steel pipe tower of power transmission line, and steel pipe tower of power transmission line
CN201963017U (en) Combined angle steel and electric transmission line iron tower
CN202969589U (en) H-type steel beam and rectangular steel tube column variable-beam depth assembly type node
CN202227758U (en) Plugboard connection assembly and power transmission line steel tube tower
CN202138186U (en) Thrusting rod connecting bracket assembly for heavy duty vehicle
CN201377195Y (en) Transmission line steel tower compound node
CN202117387U (en) Cross connecting joint of power transmission steel pipe tower and steel pipe members thereof
CN202090658U (en) Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN204983248U (en) Assembled wallboard connecting piece
CN203641197U (en) Tee joint for bus handrail pipe connection
CN203796280U (en) Segment joint structure high in bearing capacity
CN206916941U (en) A kind of steel structure column
CN204211397U (en) Assembly type standard knot
CN205841399U (en) A kind of square steel tube adpting flange
CN2859060Y (en) Autotruck counteraction rod assembly
CN201474320U (en) Steel rib beam column reinforcing structure
CN209568542U (en) A kind of steel construction
CN201520164U (en) Monolithic axle housing assembly