CN202227735U - Single pipe type fast-installing integral base station - Google Patents
Single pipe type fast-installing integral base station Download PDFInfo
- Publication number
- CN202227735U CN202227735U CN2011204015629U CN201120401562U CN202227735U CN 202227735 U CN202227735 U CN 202227735U CN 2011204015629 U CN2011204015629 U CN 2011204015629U CN 201120401562 U CN201120401562 U CN 201120401562U CN 202227735 U CN202227735 U CN 202227735U
- Authority
- CN
- China
- Prior art keywords
- base station
- tower
- single pipe
- bottom frame
- movable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model belongs to the technical field of communication towers and discloses a single pipe type fast-installing integral base station which is characterized by comprising a tower body formed by a plurality of sections of tower frames. A bottom frame with a machine room is arranged at the bottom of the tower body, the plurality of sections of tower frames are of a single pipe structure, adjacent tower frames are connected with each other through flanges, and the bottom frame is fixed with a movable base seat. When the single pipe type fast-installing integral base station is installed, the simple tamping is carried out under simple ordinary geological conditions first so as to achieve the ordinary level of about 10 tons, the movable base seat is then fixed, the bottom frame is fixed with the movable base seat, the plurality of sections of tower frames are connected through the flanges, and the movable machine room for communication is installed on the bottom frame. Due to the fact that the adjacent tower frames are connected with each other through the flanges and the base seat is movable, assembling and dismantling of each position are convenient, installation and movement are facilitated, the construction cycle is short, and the requirements of communication network emergency construction can be met.
Description
Technical field
The utility model belongs to the communication tower technical field, relates in particular to a kind of only cast fast-assembling integrated base station.
Background technology
Communication tower comprises the tower body that the more piece pylon constitutes, and the tower body bottom is provided with the underframe that has machine room.During installation, have relatively high expectations to the earth bearing strength in the area of planning to build iron tower in the basis that need fix earlier, and the construction period is long, and respectively save pylon and be fixedly connected, and just can not move in case build to finish, and can not satisfy the emergent needs of building of communication network.
The utility model content
The technical problem that the utility model will solve just provides a kind of construction period and lacks, conveniently moves, can satisfy only cast fast-assembling integrated base station of the emergent construction needs of communication network.
For solving the problems of the technologies described above; The technical scheme that the utility model adopts is: comprise the tower body that the more piece pylon constitutes, the tower body bottom is provided with the underframe that has machine room, and described more piece pylon is only tubular structure; Connect through flange between adjacent pylon, underframe and removable foundation seat fix.
Only cast fast-assembling integrated base station that the utility model provided, the more piece pylon is only tubular structure, connects through flange between adjacent pylon, underframe and removable foundation seat fix.During installation, earlier the general geology condition is simply tamped, can be reached ten tons of common left and right horizontal and get final product; Then the removable foundation seat is fixed; Underframe and removable foundation seat are fixed again, then the more piece pylon is connected through flange, will communicate by letter is installed on the underframe with shelter.Because adjacent pylon connects through flange, the basis seat also is movable, and assembly and disassembly is convenient everywhere, conveniently installs and moves, and the construction period is short, can satisfy the emergent needs of building of communication network.
Only cast fast-assembling integrated base station that the utility model provided unites two into one with communicating by letter pillar crane tool ballast basic technology with shelter; Tower body has been used the ballast formula background mathematics modelling of pillar crane; Through finite element analysis computation and actual test; Its weight bearing power reaches the level of resisting force 11 wind, and security performance is high.Basis seat is connected with underframe employing bearing pin, and no backguy, bolt etc. have been eliminated artificial destruction backguy, bolt and caused the hidden danger of security incident.The tower body construction does not need to build in addition the basis, has shortened the construction period of base station greatly, generally, the completion of just can constructing in two days of every basic tower, the 3rd day just can begin to install communication equipment, can also make the construction of iron tower become convenient.And; Earth bearing strength to the area of planning to build iron tower requires lower; The general geology condition is simply tamped; Can reach ten tons of common left and right horizontal and get final product, significantly reduce the floor space of iron tower and base station, make applying unit in all actives more of various aspects such as expropriation of land, construction, removal, regular maintenance, convenient, saving.The communication iron tower construction period has been shortened in the solely application of ballast formula iron tower in the cast fast-assembling integrated base station greatly, has made things convenient for the migration of communication iron tower, satisfies the emergent needs of building of communication network.
Description of drawings
Fig. 1 is the structural representation of the only cast fast-assembling of the utility model integrated base station.
The specific embodiment
Explain further details below in conjunction with the structure and the use principle of accompanying drawing to the only cast fast-assembling of the utility model integrated base station.
As shown in Figure 1, the only cast fast-assembling of the utility model integrated base station comprises tower body 1, and tower body 1 bottom is provided with the underframe 3 that has machine room 2; Tower body 1 is made up of more piece pylon 4; More piece pylon 4 is only tubular structure, and 4 of adjacent pylons pass through flange 5 and connect, and underframe 3 fixes with removable foundation seat 6.
When only cast fast-assembling integrated base station that the utility model provided is installed; Earlier the general geology condition is simply tamped; Can reach ten tons of common left and right horizontal and get final product, then that removable foundation seat 6 is fixing, again underframe 3 and removable foundation seat 6 are fixed; Then more piece pylon 4 is connected through flange 5, will communicate by letter is installed on the underframe 3 with shelter 2.Because adjacent pylon 4 connects through flange 5, basis seat 6 also is movable, and assembly and disassembly is convenient everywhere, conveniently installs and moves, and the construction period is short, can satisfy the emergent needs of building of communication network.
Claims (1)
1. only cast fast-assembling integrated base station; Comprise the tower body that the more piece pylon constitutes, the tower body bottom is provided with the underframe that has machine room, and it is characterized in that: described more piece pylon is only tubular structure; Connect through flange between adjacent pylon, underframe and removable foundation seat fix.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204015629U CN202227735U (en) | 2011-10-20 | 2011-10-20 | Single pipe type fast-installing integral base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204015629U CN202227735U (en) | 2011-10-20 | 2011-10-20 | Single pipe type fast-installing integral base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202227735U true CN202227735U (en) | 2012-05-23 |
Family
ID=46078324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204015629U Expired - Fee Related CN202227735U (en) | 2011-10-20 | 2011-10-20 | Single pipe type fast-installing integral base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202227735U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996214A (en) * | 2017-05-17 | 2017-08-01 | 滕荣荣 | A kind of communication tower provided with prefabricated pile basis |
-
2011
- 2011-10-20 CN CN2011204015629U patent/CN202227735U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996214A (en) * | 2017-05-17 | 2017-08-01 | 滕荣荣 | A kind of communication tower provided with prefabricated pile basis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560719A (en) | The support installation method of super large span double-layer Bidirectional hanging rope structure | |
CN201443072U (en) | Detachable combined tower crane foundation | |
CN204906277U (en) | Photovoltaic module installing support suitable for foundation settlement ground place easily takes place | |
CN202227735U (en) | Single pipe type fast-installing integral base station | |
CN204782124U (en) | Steel underframe erects single -pipe tower's fast assembly basic station | |
CN203296203U (en) | Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node | |
CN202989755U (en) | Integral-casting and fabricated prestressing force bridge structure | |
CN204849604U (en) | Section closure was with rear -mounted strength nature skeleton concrete arch rib festival | |
CN208934394U (en) | One kind can turnover type hydraulic climbing formwork wall-attaching equipment | |
CN104278689B (en) | Box-type substation and wind generator facility mutual foundation device and construction method thereof | |
CN202227736U (en) | Lift-type quick-mounting integrated base station | |
CN203947593U (en) | A kind of safety type steel structure node member | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN201746847U (en) | Combined multifunctional base of tower crane | |
CN201695406U (en) | Assembly foundation of prefabricated member | |
CN104652853A (en) | Quick lifting installation building structure | |
CN204475150U (en) | Assembly type steel bridge pier column | |
CN104805902B (en) | It is a kind of to improve the structure of hangar stress performance | |
CN204098224U (en) | Detachable concrete prefabricated wall plate structure house | |
CN204098220U (en) | The bottom reinforcement bars syndeton that a kind of keyway node prefabricated frame is set a roof beam in place | |
CN202705932U (en) | T-beam reinforced hanger frame structure | |
CN206053404U (en) | Prefabricated integral frame buckling-resistant support structure | |
CN205444443U (en) | Adopt environment -friendly type wall body's building window subassembly structure | |
CN204139193U (en) | Box-type substation and wind generator facility mutual foundation device | |
CN203960893U (en) | A kind of assembling-type precast basis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120523 Termination date: 20151020 |
|
EXPY | Termination of patent right or utility model |