CN202227735U - Single pipe type fast-installing integral base station - Google Patents

Single pipe type fast-installing integral base station Download PDF

Info

Publication number
CN202227735U
CN202227735U CN2011204015629U CN201120401562U CN202227735U CN 202227735 U CN202227735 U CN 202227735U CN 2011204015629 U CN2011204015629 U CN 2011204015629U CN 201120401562 U CN201120401562 U CN 201120401562U CN 202227735 U CN202227735 U CN 202227735U
Authority
CN
China
Prior art keywords
base station
tower
single pipe
bottom frame
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204015629U
Other languages
Chinese (zh)
Inventor
李勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI AOTA MACHINERY EQUIPMENT CO Ltd
Original Assignee
HEBEI AOTA MACHINERY EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI AOTA MACHINERY EQUIPMENT CO Ltd filed Critical HEBEI AOTA MACHINERY EQUIPMENT CO Ltd
Priority to CN2011204015629U priority Critical patent/CN202227735U/en
Application granted granted Critical
Publication of CN202227735U publication Critical patent/CN202227735U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of communication towers and discloses a single pipe type fast-installing integral base station which is characterized by comprising a tower body formed by a plurality of sections of tower frames. A bottom frame with a machine room is arranged at the bottom of the tower body, the plurality of sections of tower frames are of a single pipe structure, adjacent tower frames are connected with each other through flanges, and the bottom frame is fixed with a movable base seat. When the single pipe type fast-installing integral base station is installed, the simple tamping is carried out under simple ordinary geological conditions first so as to achieve the ordinary level of about 10 tons, the movable base seat is then fixed, the bottom frame is fixed with the movable base seat, the plurality of sections of tower frames are connected through the flanges, and the movable machine room for communication is installed on the bottom frame. Due to the fact that the adjacent tower frames are connected with each other through the flanges and the base seat is movable, assembling and dismantling of each position are convenient, installation and movement are facilitated, the construction cycle is short, and the requirements of communication network emergency construction can be met.

Description

Only cast fast-assembling integrated base station
Technical field
The utility model belongs to the communication tower technical field, relates in particular to a kind of only cast fast-assembling integrated base station.
Background technology
Communication tower comprises the tower body that the more piece pylon constitutes, and the tower body bottom is provided with the underframe that has machine room.During installation, have relatively high expectations to the earth bearing strength in the area of planning to build iron tower in the basis that need fix earlier, and the construction period is long, and respectively save pylon and be fixedly connected, and just can not move in case build to finish, and can not satisfy the emergent needs of building of communication network.
The utility model content
The technical problem that the utility model will solve just provides a kind of construction period and lacks, conveniently moves, can satisfy only cast fast-assembling integrated base station of the emergent construction needs of communication network.
For solving the problems of the technologies described above; The technical scheme that the utility model adopts is: comprise the tower body that the more piece pylon constitutes, the tower body bottom is provided with the underframe that has machine room, and described more piece pylon is only tubular structure; Connect through flange between adjacent pylon, underframe and removable foundation seat fix.
Only cast fast-assembling integrated base station that the utility model provided, the more piece pylon is only tubular structure, connects through flange between adjacent pylon, underframe and removable foundation seat fix.During installation, earlier the general geology condition is simply tamped, can be reached ten tons of common left and right horizontal and get final product; Then the removable foundation seat is fixed; Underframe and removable foundation seat are fixed again, then the more piece pylon is connected through flange, will communicate by letter is installed on the underframe with shelter.Because adjacent pylon connects through flange, the basis seat also is movable, and assembly and disassembly is convenient everywhere, conveniently installs and moves, and the construction period is short, can satisfy the emergent needs of building of communication network.
Only cast fast-assembling integrated base station that the utility model provided unites two into one with communicating by letter pillar crane tool ballast basic technology with shelter; Tower body has been used the ballast formula background mathematics modelling of pillar crane; Through finite element analysis computation and actual test; Its weight bearing power reaches the level of resisting force 11 wind, and security performance is high.Basis seat is connected with underframe employing bearing pin, and no backguy, bolt etc. have been eliminated artificial destruction backguy, bolt and caused the hidden danger of security incident.The tower body construction does not need to build in addition the basis, has shortened the construction period of base station greatly, generally, the completion of just can constructing in two days of every basic tower, the 3rd day just can begin to install communication equipment, can also make the construction of iron tower become convenient.And; Earth bearing strength to the area of planning to build iron tower requires lower; The general geology condition is simply tamped; Can reach ten tons of common left and right horizontal and get final product, significantly reduce the floor space of iron tower and base station, make applying unit in all actives more of various aspects such as expropriation of land, construction, removal, regular maintenance, convenient, saving.The communication iron tower construction period has been shortened in the solely application of ballast formula iron tower in the cast fast-assembling integrated base station greatly, has made things convenient for the migration of communication iron tower, satisfies the emergent needs of building of communication network.
Description of drawings
Fig. 1 is the structural representation of the only cast fast-assembling of the utility model integrated base station.
The specific embodiment
Explain further details below in conjunction with the structure and the use principle of accompanying drawing to the only cast fast-assembling of the utility model integrated base station.
As shown in Figure 1, the only cast fast-assembling of the utility model integrated base station comprises tower body 1, and tower body 1 bottom is provided with the underframe 3 that has machine room 2; Tower body 1 is made up of more piece pylon 4; More piece pylon 4 is only tubular structure, and 4 of adjacent pylons pass through flange 5 and connect, and underframe 3 fixes with removable foundation seat 6.
When only cast fast-assembling integrated base station that the utility model provided is installed; Earlier the general geology condition is simply tamped; Can reach ten tons of common left and right horizontal and get final product, then that removable foundation seat 6 is fixing, again underframe 3 and removable foundation seat 6 are fixed; Then more piece pylon 4 is connected through flange 5, will communicate by letter is installed on the underframe 3 with shelter 2.Because adjacent pylon 4 connects through flange 5, basis seat 6 also is movable, and assembly and disassembly is convenient everywhere, conveniently installs and moves, and the construction period is short, can satisfy the emergent needs of building of communication network.

Claims (1)

1. only cast fast-assembling integrated base station; Comprise the tower body that the more piece pylon constitutes, the tower body bottom is provided with the underframe that has machine room, and it is characterized in that: described more piece pylon is only tubular structure; Connect through flange between adjacent pylon, underframe and removable foundation seat fix.
CN2011204015629U 2011-10-20 2011-10-20 Single pipe type fast-installing integral base station Expired - Fee Related CN202227735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204015629U CN202227735U (en) 2011-10-20 2011-10-20 Single pipe type fast-installing integral base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204015629U CN202227735U (en) 2011-10-20 2011-10-20 Single pipe type fast-installing integral base station

Publications (1)

Publication Number Publication Date
CN202227735U true CN202227735U (en) 2012-05-23

Family

ID=46078324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204015629U Expired - Fee Related CN202227735U (en) 2011-10-20 2011-10-20 Single pipe type fast-installing integral base station

Country Status (1)

Country Link
CN (1) CN202227735U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996214A (en) * 2017-05-17 2017-08-01 滕荣荣 A kind of communication tower provided with prefabricated pile basis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996214A (en) * 2017-05-17 2017-08-01 滕荣荣 A kind of communication tower provided with prefabricated pile basis

Similar Documents

Publication Publication Date Title
CN108560719A (en) The support installation method of super large span double-layer Bidirectional hanging rope structure
CN201443072U (en) Detachable combined tower crane foundation
CN204906277U (en) Photovoltaic module installing support suitable for foundation settlement ground place easily takes place
CN202227735U (en) Single pipe type fast-installing integral base station
CN204782124U (en) Steel underframe erects single -pipe tower's fast assembly basic station
CN203296203U (en) Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node
CN202989755U (en) Integral-casting and fabricated prestressing force bridge structure
CN204849604U (en) Section closure was with rear -mounted strength nature skeleton concrete arch rib festival
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN104278689B (en) Box-type substation and wind generator facility mutual foundation device and construction method thereof
CN202227736U (en) Lift-type quick-mounting integrated base station
CN203947593U (en) A kind of safety type steel structure node member
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN201746847U (en) Combined multifunctional base of tower crane
CN201695406U (en) Assembly foundation of prefabricated member
CN104652853A (en) Quick lifting installation building structure
CN204475150U (en) Assembly type steel bridge pier column
CN104805902B (en) It is a kind of to improve the structure of hangar stress performance
CN204098224U (en) Detachable concrete prefabricated wall plate structure house
CN204098220U (en) The bottom reinforcement bars syndeton that a kind of keyway node prefabricated frame is set a roof beam in place
CN202705932U (en) T-beam reinforced hanger frame structure
CN206053404U (en) Prefabricated integral frame buckling-resistant support structure
CN205444443U (en) Adopt environment -friendly type wall body's building window subassembly structure
CN204139193U (en) Box-type substation and wind generator facility mutual foundation device
CN203960893U (en) A kind of assembling-type precast basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20151020

EXPY Termination of patent right or utility model