CN202227488U - Bamboo beam connecting structure on bamboo integrated house - Google Patents

Bamboo beam connecting structure on bamboo integrated house Download PDF

Info

Publication number
CN202227488U
CN202227488U CN2011203288493U CN201120328849U CN202227488U CN 202227488 U CN202227488 U CN 202227488U CN 2011203288493 U CN2011203288493 U CN 2011203288493U CN 201120328849 U CN201120328849 U CN 201120328849U CN 202227488 U CN202227488 U CN 202227488U
Authority
CN
China
Prior art keywords
bamboo
bamboo beam
beams
link
syndeton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203288493U
Other languages
Chinese (zh)
Inventor
陈杰
罗莹英
满棠
吴志堂
徐文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI CULTURE PRESS AND PUBLICATION BUREAU
Original Assignee
ANJI CULTURE PRESS AND PUBLICATION BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI CULTURE PRESS AND PUBLICATION BUREAU filed Critical ANJI CULTURE PRESS AND PUBLICATION BUREAU
Priority to CN2011203288493U priority Critical patent/CN202227488U/en
Application granted granted Critical
Publication of CN202227488U publication Critical patent/CN202227488U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bamboo beam connecting structure on a bamboo integrated house. The bamboo beam connecting structure comprises a fixing frame, a first bamboo beam and second and third bamboo beams arranged at the two sides of the first bamboo beam. The second and third bamboo beams are arranged on a straight line. The connecting ends of the second and third bamboo beams are both provided with arc openings matched with the side wall of the first bamboo beam. The two sides of the fixing frame respectively run through the second and third bamboo beams. The second bamboo beam, the third bamboo beam and the first bamboo beam are fixedly connected by the fixing frame. This connecting structure for fixedly connecting the first to third bamboo beams by the fixing frame under matching effect of the arc openings and the side wall of the first bamboo beam is novel and good in matching effect. And the bamboo beams are arranged reasonably and beautifully and the firmness is also well guaranteed at the same time.

Description

Bamboo beam syndeton on a kind of bamboo integrated room
Technical field
The utility model relates to the bamboo beam syndeton on a kind of bamboo integrated room.
Background technology
Bamboo integrated room just has by the potentiality of people's wide popularization and application because its green cleans.And at present when building bamboo integrated room, be interconnected to the maximum difficult point of building integrated room between the bamboo beam.Owing to lack design; Existing bamboo integrated room steel wire commonly used simply bundlees the bamboo beam and forms the syndeton between the bamboo beam, and this syndeton supports in default of mutual mechanics, easily mutual angular displacements; Insecure and structure is reasonable inadequately compact; Aesthetics is poor, thereby it is more coarse to cause bamboo integrated room to make, and application is restricted.
Summary of the invention
The goal of the invention of the utility model provides a kind of novel structure, cooperates rationally, and is attractive in appearance and be connected bamboo beam syndeton firm.
The utility model the technical scheme that will adopt be:
Bamboo beam syndeton on a kind of bamboo integrated room; Comprise fixed frame; The first bamboo beam and the second bamboo beam and the 3rd bamboo beam that are located at its both sides; The second bamboo beam and the 3rd bamboo beam exist together in a straight line, and the second bamboo beam link and the 3rd bamboo beam link all are provided with the arc opening that matches with the first bamboo beam sidewall; The fixed frame both sides are run through the second bamboo beam and the 3rd bamboo beam respectively, and the second bamboo beam, the 3rd bamboo beam are fixedly connected through fixed frame with the first bamboo beam.
As preferably, said second bamboo beam and the 3rd bamboo beam all and the first bamboo beam wherein perpendicular.
As preferably, said fixed frame all is made up of with the fixed bar of through hole two parallel bolts that run through the second bamboo beam and the 3rd bamboo beam and two radicles that are connected two parallel bolts.
As preferably, the bamboo that stretches out the link outside also is set on the arc opening of said second bamboo beam link and the 3rd bamboo beam link transplants a cutting, bamboo is transplanted a cutting and is connected as a single entity with the bamboo beam; Be provided with on the said first bamboo beam side walls and the corresponding jack of bamboo cutting.
Bamboo beam syndeton on the bamboo integrated room of employing technique scheme; The second bamboo beam and the 3rd bamboo beam that this bamboo beam syndeton comprises fixed frame, the first bamboo beam and is located at its both sides; The second bamboo beam link and the 3rd bamboo beam link all are provided with the arc opening that matches with the first bamboo beam sidewall and are connected through fixed frame; This syndeton that cooperates bamboo beam sidewall to be fixedly connected through fixed frame again through arc opening, novel structure, fiting effect is very good; And it is rationally attractive in appearance that the bamboo beam is provided with the position, and fastness is also well guaranteed simultaneously.
Description of drawings
Fig. 1: the structural representation of the utility model embodiment.
The sectional structure sketch map of Fig. 2: Fig. 1.
Fig. 3: the structural representation of fixed frame among the embodiment.
The specific embodiment
Be to combine accompanying drawing 1-3 that the utility model technical scheme is described in further detail below.
Embodiment: a kind of like the bamboo beam syndeton on Fig. 1, the bamboo integrated room shown in Figure 2; Comprise fixed frame; The first bamboo beam 1 and be located at its left side the second bamboo beam 2 and right side the 3rd bamboo beam 3, the second bamboo beams 2 and the 3rd bamboo beam 3 exists together in a straight line and all and the first bamboo beam 1 wherein perpendicular.The second bamboo beam, 2 links and the 3rd bamboo beam 3 links all are provided with the arc opening 21 that matches with the first bamboo beam, the 1 sidewall face of cylinder.The second bamboo beam 2, the 3rd bamboo beam 3 are fixedly connected through fixed frame with the first bamboo beam 1.The said fixing frame is as shown in Figure 3, by about two parallel bolts and front and back two radicles that connect two parallel bolts all constitute with the fixed bar of through hole.Be that concrete connected mode is: left bolt 42 runs through the second bamboo beam; Right bolt 41 runs through the 3rd bamboo beam; Before fixed bar 51 both ends be socketed in the front end of left bolt 42 and right bolt 41 respectively through through hole, back fixed bar 52 both ends are locked through the supporting nut 43 that through hole is socketed in two bolts about rear end and the quilt of left bolt 42 and right bolt 41 respectively.The bamboo that stretches out the link outside also is set on the arc opening 21 of the above-mentioned second bamboo beam, 2 links and the 3rd bamboo beam 3 links transplants a cutting 22, bamboo cutting 22 is connected as a single entity with Zhu Liang; The jack corresponding with bamboo cutting 22 is set on the first bamboo beam, 1 side walls; Corresponding jack is inserted in bamboo cutting 22 on the link of the second bamboo beam 2 and the 3rd bamboo beam 3 earlier; Be fixedly connected through the above-mentioned fixed frame that is square, such structure is more attractive in appearance firmly again.

Claims (4)

1. the bamboo beam syndeton on the bamboo integrated room; It is characterized in that comprising fixed frame; The first bamboo beam and the second bamboo beam and the 3rd bamboo beam that are located at its both sides; The second bamboo beam and the 3rd bamboo beam exist together in a straight line, and the second bamboo beam link and the 3rd bamboo beam link all are provided with the arc opening that matches with the first bamboo beam sidewall; The fixed frame both sides are run through the second bamboo beam and the 3rd bamboo beam respectively, and the second bamboo beam, the 3rd bamboo beam are fixedly connected through fixed frame with the first bamboo beam.
2. the bamboo beam syndeton on a kind of bamboo integrated room according to claim 1, it is characterized in that said second bamboo beam and the 3rd bamboo beam all and the first bamboo beam wherein perpendicular.
3. the bamboo beam syndeton on a kind of bamboo integrated room according to claim 1 is characterized in that said fixed frame all is made up of with the fixed bar of through hole two parallel bolts that run through the second bamboo beam and the 3rd bamboo beam and two radicles that are connected two parallel bolts.
4. according to the bamboo beam syndeton on claim 1 or the 2 or 3 described a kind of bamboo integrated rooms; It is characterized in that also being provided with on the arc opening of said second bamboo beam link and the 3rd bamboo beam link the bamboo that stretches out the link outside and transplant a cutting, bamboo is transplanted a cutting and is connected as a single entity with the bamboo beam; Be provided with on the said first bamboo beam side walls and the corresponding jack of bamboo cutting.
CN2011203288493U 2011-09-02 2011-09-02 Bamboo beam connecting structure on bamboo integrated house Expired - Fee Related CN202227488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203288493U CN202227488U (en) 2011-09-02 2011-09-02 Bamboo beam connecting structure on bamboo integrated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203288493U CN202227488U (en) 2011-09-02 2011-09-02 Bamboo beam connecting structure on bamboo integrated house

Publications (1)

Publication Number Publication Date
CN202227488U true CN202227488U (en) 2012-05-23

Family

ID=46078077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203288493U Expired - Fee Related CN202227488U (en) 2011-09-02 2011-09-02 Bamboo beam connecting structure on bamboo integrated house

Country Status (1)

Country Link
CN (1) CN202227488U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758217A (en) * 2014-01-22 2014-04-30 西安建筑科技大学 Bamboo cane type binding method for raw bamboo column
CN103898988A (en) * 2014-03-24 2014-07-02 西安建筑科技大学 Double-bamboo connection structure for bamboo structure systems
CN103898989A (en) * 2014-03-24 2014-07-02 西安建筑科技大学 Bamboo beam-column connection joint
CN106592766A (en) * 2016-12-21 2017-04-26 西安建筑科技大学 Grillage beam structure formed by connecting cross-shaped plates
CN106592767A (en) * 2016-12-21 2017-04-26 西安建筑科技大学 Bamboo grillage beam formed by connecting L-shaped plates

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758217A (en) * 2014-01-22 2014-04-30 西安建筑科技大学 Bamboo cane type binding method for raw bamboo column
CN103758217B (en) * 2014-01-22 2017-04-19 西安建筑科技大学 Bamboo cane type binding method for raw bamboo column
CN103898988A (en) * 2014-03-24 2014-07-02 西安建筑科技大学 Double-bamboo connection structure for bamboo structure systems
CN103898989A (en) * 2014-03-24 2014-07-02 西安建筑科技大学 Bamboo beam-column connection joint
CN103898988B (en) * 2014-03-24 2016-07-06 西安建筑科技大学 A kind of attachment structure of the two former bamboos for former bamboo structure system
CN106592766A (en) * 2016-12-21 2017-04-26 西安建筑科技大学 Grillage beam structure formed by connecting cross-shaped plates
CN106592767A (en) * 2016-12-21 2017-04-26 西安建筑科技大学 Bamboo grillage beam formed by connecting L-shaped plates
CN106592766B (en) * 2016-12-21 2018-11-09 西安建筑科技大学 A kind of nine-squares beam structure connected by cross template
CN106592767B (en) * 2016-12-21 2018-11-09 西安建筑科技大学 A kind of raw bamboo cross beam connected by L-type plate

Similar Documents

Publication Publication Date Title
CN202227488U (en) Bamboo beam connecting structure on bamboo integrated house
ATE429867T1 (en) SPINAL ROD SYSTEM
CN201409344Y (en) Spliced double-beam arch frame big shed with easy assembly and disassembly
WO2006123337A3 (en) Connecting elements for construction
CN205024849U (en) Wood structure building beam -column connection node structure
US20090249736A1 (en) Connecting device for curtain wall units
CN202194252U (en) Bamboo beam connecting structure for integrated house made of bamboo
CN201026054Y (en) Movable combined flower stand
CN202194253U (en) Bamboo beam connection structure for bamboo modular house
CN2934425Y (en) Wooden brick and wooden structure wall
CN108316545A (en) A kind of environment friendly light wall
CN203440950U (en) Lateral connection type thin-wall steel exterior wall hanging plate
CN102182389B (en) Steel core safety net
CN205036160U (en) Afforestation frame
CN205206042U (en) Timber structure bolted connection spare
ITRN20020002A1 (en) MODULAR JOINT FOR STRUCTURAL CONNECTION, IN PARTICULAR FOR THE CONSTRUCTION OF SHELVING.
CN204876081U (en) Compound fossil fragments convenient to right angle is connected
CN204139552U (en) A kind of tubulose decorative thread
CN201107960Y (en) Pet house fixing structure
CN202298915U (en) Wooden connecting structure with insertion ports
CN202248612U (en) Assembled guardrail
CN218683192U (en) Wood bed with suspension tenon fourth of twelve earthly branches structure
WO2011003403A3 (en) Modular plug-in system
CN208709069U (en) A kind of connection structure of upholstered seat frame
CN203080749U (en) Structure provided with space stainless steel draw bars

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20120902