CN202215871U - Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube - Google Patents

Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube Download PDF

Info

Publication number
CN202215871U
CN202215871U CN2011203173714U CN201120317371U CN202215871U CN 202215871 U CN202215871 U CN 202215871U CN 2011203173714 U CN2011203173714 U CN 2011203173714U CN 201120317371 U CN201120317371 U CN 201120317371U CN 202215871 U CN202215871 U CN 202215871U
Authority
CN
China
Prior art keywords
pccp
tube
transverse brace
stull
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203173714U
Other languages
Chinese (zh)
Inventor
刘川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG GUOTONG TUBE CO Ltd
SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd
Original Assignee
XINJIANG GUOTONG TUBE CO Ltd
SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG GUOTONG TUBE CO Ltd, SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd filed Critical XINJIANG GUOTONG TUBE CO Ltd
Priority to CN2011203173714U priority Critical patent/CN202215871U/en
Application granted granted Critical
Publication of CN202215871U publication Critical patent/CN202215871U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a tensioning tool for installing a prestressed concrete cylinder pipe (PCCP) finished tube, which comprises a tube-internal transverse brace and a tube-external end transverse brace. A chain hoist is arranged between the tube-internal transverse brace and the tube-external end transverse brace, two ends of the chain hoist are respectively hung with pulling rings of the tube-internal transverse brace and the tube-external end transverse brace. The tensioning tool for installing the PCCP finished tube has the advantages that the tube-internal transverse brace is fixed in an installation gap between two installed PCCPs, and the tube-external end transverse brace is fixed on the end faces of the installed PCCPs which are pulled in through stringing of the chain hoist, so bell and spigots of the PCCPs can be closed, and then installation of a PCCP joint is finished. Therefore, the but joint of the bell and spigots of the PCCPs is convenient, and the installation quality is easy to control.

Description

The PCCP production tube is installed tensioning tool
Technical field
The utility model relates to a kind of PCCP production tube tensioning tool is installed.
Background technique
The installation of PCCP is that the socket joint through the PCCP pipe joint connects and realizes, pipe joint socket joint fit tolerance is+0.4 ~+2mm.Because interface gaps is little, need certain external force tension could realize that joint socket cooperates.In the tension process, be not damaged for guaranteeing pipe joint (joint socket) and O-ring seal, must control joint socket and draw in speed, to guarantee that joint socket is in adjustable state at any time in the tension process.There is following shortcoming in existing tensioning means: or to PCCP external protection generation destruction; Or installation tensioning tool heaviness is not easy to operate; Or the speed that draws in is too fast, and installation quality is difficult for guaranteeing.
The model utility content
The utility model has overcome shortcoming of the prior art, provides a kind of PCCP production tube that tensioning tool is installed.
The technological scheme of the utility model is: a kind of PCCP production tube is installed tensioning tool; Comprise stull and pipe outer end stull in the pipe; In pipe, be provided with chain hois between stull and the pipe outer end stull, the two ends of chain hois tangle the draw ring of interior stull of pipe and pipe outer end stull respectively.
Said chain hois is two or more.Stull is provided with the steel plate dop in the said pipe.
Compared with prior art; The utility model has the advantages that: in the assemblage gap between two PCCP that stull in the pipe of the utility model are fixed on installation, will manage the outer end stull simultaneously and be fixed on the PCCP end face that is mounted, and through tightening up of chain hois the PCCP that is mounted drawn in again; Realize the closure of PCCP joint socket; Accomplish the installation of PCCP interface, make that the butt joint of PCCP joint socket is lighter, installation quality is controlled more easily.
Description of drawings
The utility model will explain through example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is the structural representation of the utility model;
Working state schematic representation when Fig. 2 is to use the utility model that the tension of PCCP pipeline is installed;
Fig. 3 is to use the utility model that PCCP pipeline tension working state A-A schematic representation is installed.
Embodiment
A kind of PCCP production tube is installed tensioning tool, to shown in Figure 3, comprises stull 1 in the pipe, chain hois 2 and pipe outer end stull 3 like Fig. 1.Stull 1 is provided with the steel plate dop in the pipe, is used to snap in the interface gaps between two PCCP of installation, and pipe outer end stull 3 is used for fixing the PCCP end face that is being mounted; In pipe, be provided with two or more chain hois 2 between stull 1 and the pipe outer end stull 3, the two ends of chain hois 2 tangle the draw ring of interior stull 1 of pipe and pipe outer end stull 3 respectively.
As shown in Figures 2 and 3, the working principle of the utility model is:
Stull 1 in the pipe is fixed on (stull 1 snaps in the interface gaps through the steel plate dop in the pipe) in the assemblage gap between two PCCP of installation; Pipe outer end stull 3 is fixed on the PCCP end face that is mounted; Chain hois 2 tangles the draw ring of two stulls; Through tightening up of chain hois 2 PCCP that is mounted is drawn in, realize the closure of PCCP joint socket, accomplish the installation of PCCP interface.

Claims (2)

1. a PCCP production tube is installed tensioning tool, it is characterized in that: comprise stull and pipe outer end stull in the pipe, in pipe, be provided with chain hois between stull and the pipe outer end stull, the two ends of chain hois tangle the draw ring of interior stull of pipe and pipe outer end stull respectively.
2. PCCP production tube according to claim 1 is installed tensioning tool, it is characterized in that: said chain hois is two or more.
CN2011203173714U 2011-08-29 2011-08-29 Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube Expired - Lifetime CN202215871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203173714U CN202215871U (en) 2011-08-29 2011-08-29 Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203173714U CN202215871U (en) 2011-08-29 2011-08-29 Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube

Publications (1)

Publication Number Publication Date
CN202215871U true CN202215871U (en) 2012-05-09

Family

ID=46015126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203173714U Expired - Lifetime CN202215871U (en) 2011-08-29 2011-08-29 Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube

Country Status (1)

Country Link
CN (1) CN202215871U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102358603A (en) * 2011-08-29 2012-02-22 四川国统混凝土制品有限公司 Mounting and clamping tool of PCCP (Prestressed Concrete Cylinder Pipe) finished pipe
CN104989898A (en) * 2015-08-10 2015-10-21 江西汇丰管业有限公司 Pipeline connector
CN106884439A (en) * 2017-03-16 2017-06-23 中交公局厦门工程有限公司 A kind of Large Tube, the prefabricated components of case and its plane Dock With Precision Position method
CN107214466A (en) * 2017-06-22 2017-09-29 五冶集团上海有限公司 The adjusting apparatus of counterpart is made for pipeline
CN109442096A (en) * 2018-12-29 2019-03-08 北京京水建设集团有限公司 Drawing device and its construction method in a kind of PCCP pipeline
CN112247899A (en) * 2020-09-29 2021-01-22 程永振 Automatic butt joint hydraulic machine for PCCP (prestressed concrete cylinder pipe) pipelines
CN112303333A (en) * 2020-11-18 2021-02-02 郑州一建集团有限公司 Construction method of bell and spigot concrete pipe

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102358603A (en) * 2011-08-29 2012-02-22 四川国统混凝土制品有限公司 Mounting and clamping tool of PCCP (Prestressed Concrete Cylinder Pipe) finished pipe
CN104989898A (en) * 2015-08-10 2015-10-21 江西汇丰管业有限公司 Pipeline connector
CN104989898B (en) * 2015-08-10 2017-05-31 江西汇丰管业有限公司 A kind of pipe jointer
CN106884439A (en) * 2017-03-16 2017-06-23 中交公局厦门工程有限公司 A kind of Large Tube, the prefabricated components of case and its plane Dock With Precision Position method
CN107214466A (en) * 2017-06-22 2017-09-29 五冶集团上海有限公司 The adjusting apparatus of counterpart is made for pipeline
CN109442096A (en) * 2018-12-29 2019-03-08 北京京水建设集团有限公司 Drawing device and its construction method in a kind of PCCP pipeline
CN112247899A (en) * 2020-09-29 2021-01-22 程永振 Automatic butt joint hydraulic machine for PCCP (prestressed concrete cylinder pipe) pipelines
CN112303333A (en) * 2020-11-18 2021-02-02 郑州一建集团有限公司 Construction method of bell and spigot concrete pipe

Similar Documents

Publication Publication Date Title
CN202215871U (en) Tensioning tool for installing prestressed concrete cylinder pipe (PCCP) finished tube
CN204254040U (en) A kind of cable channel electric power cable bearer
CN103292046A (en) Fixing clamping ring for water-cooled cables
CN202600223U (en) Novel communication plastic tube
CN102358603A (en) Mounting and clamping tool of PCCP (Prestressed Concrete Cylinder Pipe) finished pipe
CN204343343U (en) Reflection wave method pipe location quick access device
CN202582546U (en) Embedded settlement observation point connection fixing device
CN203103850U (en) Traction tool for narrow space
CN104613177B (en) A kind of pipe end sealing device
CN204012604U (en) A kind of communication optical cable conduit
CN203907008U (en) Dedicated mounting connection device for large-caliber concrete pipeline
CN102248602A (en) Die for manufacturing steel frame for prestressed concrete pipe
CN203947773U (en) A kind of for fixed form to support to draw rod device
CN202809495U (en) Device quickening connecting speed of cross arms between steel tube arch ribs
CN202144630U (en) Tie bar structure for building with masonry structure
GB201214150D0 (en) A mechanical device for dispersing biomass populations
CN202571091U (en) Simple rebar bending mechanism
CN201189652Y (en) Sealing joint detaching device for tube of glass fibre reinforced plastic
CN204243654U (en) Novel cable protecting pipe
CN203680276U (en) Screw fixing tool vehicle for solar shell
CN104674662A (en) Simple steel pipe bracket for inner die of box girder
CN204357136U (en) Building operations central authorities extend out clamped-in style threading termination erecting device
CN204389766U (en) For the threading draw-gear that submarine optical fiber cable is laid
CN204235989U (en) A kind of steel lining tetrafluoro pipeline hydraulic pressure compounding machine
CN203201160U (en) Mounting and alignment guide screw of high-rise steel structure box column lead screw

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120509

CX01 Expiry of patent term