CN202200370U - Device for producing plaster shell bubble of flame-retardant building insulation board - Google Patents

Device for producing plaster shell bubble of flame-retardant building insulation board Download PDF

Info

Publication number
CN202200370U
CN202200370U CN2011202708897U CN201120270889U CN202200370U CN 202200370 U CN202200370 U CN 202200370U CN 2011202708897 U CN2011202708897 U CN 2011202708897U CN 201120270889 U CN201120270889 U CN 201120270889U CN 202200370 U CN202200370 U CN 202200370U
Authority
CN
China
Prior art keywords
ice pellets
dressing
water
tower
granulation tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202708897U
Other languages
Chinese (zh)
Inventor
胡屹博
靳策
王鲸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beilong Construction Group Co., Ltd.
Original Assignee
胡屹博
靳策
王鲸
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡屹博, 靳策, 王鲸 filed Critical 胡屹博
Priority to CN2011202708897U priority Critical patent/CN202200370U/en
Application granted granted Critical
Publication of CN202200370U publication Critical patent/CN202200370U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a device for producing a plaster shell bubble of a flame-retardant building insulation board, which is used for the insulating plaster shell bubble filled in the flame-retardant building insulation board. The device comprises a water storage tank, a granulation tower and an ice particle-coated drum which are communicated sequentially, and the granulation tower comprises a tower body and a rotating water jet motor arranged at the top of the tower body and is communicated with a water outlet of the water storage tank and a water discharging valve through a water inlet of the granulation tower; and a rotating water jet is arranged in the granulation tower, a water nozzle is arranged beside the rotating water jet, a refrigerant inlet and a refrigerant outlet are communicated with a refrigerant coil of the granulation tower in the tower body, the ice particle-coated drum comprises an ice particle-coated drum body, an ice particle and plaster inlet, an ice particle-coated pushing plate and a rear ice particle-coated discharging port, the ice particle and plaster inlet is arranged under an ice particle discharging valve, and the ice particle-coated pushing plate and the rear ice particle-coated discharging port are arranged in the ice particle-coated drum body. The water flow and vacuum of the granulation tower as well asand the rotating speed of the rotating water jet motor can be adjusted conveniently, and the diameter of ice particles can be controlled to realize accurate and high-speed mechanized production.

Description

Production refuses to fire the device of insulating board for building with the plaster shell steam bubble
Technical field
The utility model belongs to the building thermal insulation material production field, particularly a kind of be used for producing be filled in the production of refusing to fire the plaster shell steam bubble that plays insulation effect in the insulating board for building and refuse to fire the device of insulating board for building with the plaster shell steam bubble.
Background technology
At present in the building energy consumption 30%~50%, through the building enclosure loss, energy-saving and emission-reduction are as development strategy, and national requirements owned building from now on must be carried out exterior-wall heat insulation and handles to reach the purpose of energy-saving and emission-reduction.Yet the building thermal insulation material major part of using now is to use polyphenyl or polyphenyl to add the cement organic material or foam cement is processed.Organic material runs into high temperature promptly can burn or discharge toxic gas to building and environment structure grave danger, and disaster is led to because of the external-wall heat-insulation material burning in cities such as Shanghai, Liaoning; The warming plate intensity that adopts foam cement to process is low, is unfavorable for the exterior wall modification, and the drawback of these insulation materials has a strong impact on skin heat preservation energy-saving implementation.
Summary of the invention
The purpose of the utility model be to overcome the deficiency that exists in the prior art and provide that a kind of automaticity is high, safe and reliable being used for produce and can play insulation effect and can not burn or run into the production of refusing to fire the plaster shell steam bubble that insulating board for building uses that high temperature can not discharge toxic gas and refuse to fire the device of insulating board for building with the plaster shell steam bubble.
The purpose of the utility model is achieved in that and comprises that successively the have vent valve, intake valve, water tank that are communicated with vacuumize the water tank of valve, water tank water inlet and inlet valve and delivery port and flowing water Valve, the granulation tower that has refrigerant import, refrigerant exit, granulation tower vacuum suction pipeline and ice pellets discharge gate and ice pellets dressing rotary drum; It is characterized in that: granulation tower comprises tower body, is arranged on the rotation water cutter motor outside the tower body top, and granulation tower is connected through the delivery port and the flowing water Valve of granulation tower water inlet and water tank; In the tower body top of granulation tower, be provided with and rotate the rotation water handle of a knife that water cutter motor is connected; Rotation water cutter is installed on rotation water handle of a knife; Be distributed with the water nozzle that is connected with distributive pipe on rotation water cutter next door, refrigerant import and the refrigerant exit that the tower body outside the has granulation tower refrigerant coil pipe inner with being arranged on tower body is connected, and granulation tower refrigerant coil pipe is the formation cooling chamber in the middle part of tower body; Be provided with the ice pellets storehouse in the tower body bottom, the ice pellets discharge gate is positioned at the tower body bottom; Being placed on ice pellets dressing rotary drum below the ice pellets discharge gate comprises ice pellets dressing rotary drum housing, is opened in being arranged in ice pellets and gypsum import below the ice pellets discharge gate, being installed in discharging opening behind spiral helicine ice pellets dressing pushing plate and the ice pellets dressing of rotation of ice pellets dressing rotary drum housing on the ice pellets dressing rotary drum housing.
Ice pellets dressing rotary drum housing comprises removing unnecessary gypsum section, polishing the section of solidifying after removing the ice pellets dressing of unnecessary gypsum section back of the ice pellets dressing section that makes ice pellets appearance parcel land plaster, ice pellets dressing section back; The rotatory drum wall of removing unnecessary gypsum section is the sieve aperture shape; Unnecessary land plaster reclaims through this sieve aperture and uses behind the dressing; The polishing section of solidifying is rotated the polishing section of solidifying for the ice pellets behind the dressing behind the ice pellets dressing, and discharging opening behind the arrival ice pellets dressing.
Granulation tower is the tower body of sealing; Tower body is outside equipped with heat-insulation layer; The ice pellets discharge gate is a vacuum valve, and refrigerant is got into by the refrigerant import, guarantees that through granulation tower refrigerant coil pipe the temperature of cooling chamber reaches subzero; Again by refrigerant exit with in the surplus cold interlayer that is discharged into water tank, the water tank outer wall is provided with heat-insulation layer.
The water tank Pressure gauge is installed on water tank.The granulation tower Pressure gauge is installed on granulation tower.
The utlity model has following good effect: refusing to fire insulating board for building is to utilize the control temperature to let the ice pellets appearance melt with the manufacturing principle of plaster shell steam bubble; The water that melts sticks to the surface of ice pellets uniformly with the plaster of paris, under the rotating state of ice pellets, forms the gypsum shell of a completion, controls the thickness that temperature guarantees the gypsum adhesion simultaneously; Utilize the characteristic of plaster of paris rapid solidification; Keep uniform temperature to form the cavity thickness at the plaster of paris and stop the ice pellets thawing, when gypsum sets reached certain intensity, can heat made ice pellets thawing in the film; Thawing water sees through gypsum film space to be got rid of, and forms a complete plaster shell cavity steam bubble.
The utility model can conveniently be regulated granulation tower flow of inlet water and granulation tower vacuum and rotation water cutter motor speed, thereby control ice pellets diameter is realized mechanization production quickly and accurately.
Description of drawings
Fig. 1 is the granulation tower sketch map of the utility model.
Fig. 2 is the granulation tower B-B profile of the utility model.
Fig. 3 is the interior distributive pipe of the granulation tower of the utility model, water nozzle, water cutter top plan view.
Fig. 4 is the interior distributive pipe of the granulation tower of the utility model, water nozzle, water cutter side cutaway view.
Fig. 5 is the side view of the ice pellets dressing rotary drum of the utility model.
Fig. 6 is the C-C profile of the ice pellets dressing rotary drum of the utility model.
Among Fig. 1-6: 1. vent valve, 2. water supply tank Pressure gauge, 3. granulation tower Pressure gauge, 4. intake valve, 5. granulation tower; 6. rotation water cutter motor, 7. ice pellets discharge gate, 8. refrigerant import, 9. refrigerant exit, 10. granulation tower water inlet control valve; 11. the granulation tower water inlet, 12. granulation tower vacuum suction pipelines, 13. ice pellets dressing rotary drums, 14. ice pellets and gypsum import, discharging opening behind the 15. ice pellets dressings; 16. water tank, 17. water tank water inlets, 18. water tanks vacuumize valve, 19. rotation water handle of a knifes, 20. rotation water cuttves; 21. water nozzle, 22. distributive pipes, 23. cooling chambers, 24. ice pellets storehouses, 25. granulation tower refrigerant coil pipes; 26. ice pellets dressing section, 27. remove unnecessary gypsum section, the polishing section of solidifying behind the 28. ice pellets dressings, 29. ice pellets dressing pushing plates (29).
The specific embodiment
Like Fig. 1,2,3,4,5, shown in 6; A kind of production refuses to fire the device of insulating board for building with the plaster shell steam bubble; Comprise that successively the have vent valve 1, intake valve 4, water tank Pressure gauge 2, water tank that are communicated with vacuumize the water tank 16 of valve 18, water tank water inlet and inlet valve 17 and delivery port and flowing water Valve 10, the granulation tower 5 that has refrigerant import 8, refrigerant exit 9, granulation tower Pressure gauge 3, granulation tower vacuum suction pipeline 12 and ice pellets discharge gate 7 and ice pellets dressing rotary drum 13; It is characterized in that: granulation tower 5 comprises tower body, is arranged on the rotation water cutter motor 6 outside the tower body top, and granulation tower 5 is connected through the delivery port and the flowing water Valve 10 of granulation tower water inlet 11 with water tank 16; In the tower body top of granulation tower 5, be provided with and rotate the rotation water handle of a knife 19 that water cutter motor 6 is connected; Rotation water cutter 20 is installed on rotation water handle of a knife 19; Be distributed with the water nozzle 21 that is connected with distributive pipe 22 on rotation water cutter 20 next doors; The refrigerant import 8 that the tower body outside has is connected with the refrigerant exit 9 granulation tower refrigerant coil pipe 25 inner with being arranged on tower body; Granulation tower refrigerant coil pipe 25 constitutes cooling chamber 23 at the tower body middle part, is provided with ice pellets storehouse 24 in the tower body bottom, and ice pellets discharge gate 7 is positioned at the tower body bottom; Being placed on ice pellets dressing rotary drums 13 below the ice pellets discharge gate 7 comprises ice pellets dressing rotary drum housing, is opened in being arranged in ice pellets and gypsum import 14 below the ice pellets discharge gate 7, being installed in discharging opening 15 behind spiral helicine ice pellets dressing pushing plate 29 and the ice pellets dressing of rotation of ice pellets dressing rotary drum housing on the ice pellets dressing rotary drum housing.
Ice pellets dressing rotary drum housing comprises the unnecessary gypsum section of removing of the ice pellets dressing section 26 that makes ice pellets appearance parcel land plaster, ice pellets dressing section 26 back 27, polish the section of solidifying 28 after removing the ice pellets dressing of unnecessary gypsum section 27 back; The rotatory drum wall of removing unnecessary gypsum section 27 is the sieve aperture shape; Unnecessary land plaster reclaims through this sieve aperture and uses behind the dressing; The polishing section of solidifying 28 is rotated the polishing section of solidifying for the ice pellets behind the dressing behind the ice pellets dressing, and discharging opening 15 behind the arrival ice pellets dressing.
Granulation tower 5 is the tower body of sealing; Tower body is outside equipped with heat-insulation layer; Ice pellets discharge gate 7 is a vacuum valve, and refrigerant is got into by refrigerant import 8, guarantees that through granulation tower refrigerant coil pipe 25 temperature of cooling chamber 23 reaches subzero; Again by refrigerant exit 9 with in the surplus cold interlayer that is discharged into water tank 16, water tank 16 outer walls are provided with heat-insulation layer.
The utility model discloses a kind of insulating board for building of refusing to fire; Comprise water tank 16, granulation tower 5 and ice pellets dressing rotary drum 13, wherein granulation tower 5 comprises tower body, and the tower body top is outside equipped with rotation water cutter motor 6; The tower body upper outside is provided with granulation tower water inlet 11, granulation tower vacuum suction pipeline 12 and granulation tower Pressure gauge 3; Be provided with rotation water handle of a knife 19, rotation water cutter 20, distributive pipe 22 and water nozzle 21 in the tower body top, the tower body arranged outside has refrigerant import 8 and refrigerant exit 9, and the tower body middle part is provided with cooling chamber 23; The tower body bottom is provided with ice pellets storehouse 24, and the tower body bottom is provided with ice pellets discharge gate 7; Tower body is outside equipped with heat-insulation layer, and tower body must seal, the ability bearing certain pressure; Rotation water cutter motor speed is according to the specification needs adjustment of ice pellets, and power of motor confirms that according to manufacturing capacity ice pellets discharge gate 7 is vacuum valves; Refrigerant is got into by refrigerant import 8, makes the temperature of cooling chamber reach subzero through granulation tower refrigerant coil pipe 25, by refrigerant exit 9 surplus cold being discharged into is reduced water temperature (above zero) the saving energy in water tank 16 interlayers again; Water storage is irritated 16 outer walls and is provided with heat-insulation layer, through adjustment granulation tower water inlet control valve 10 flow of inlet water and granulation tower vacuum and rotation water cutter motor 6 rotating speeds control ice pellets diameter, keeps the certain vacuum degree during granulation in the granulation tower 16; Make water column cutting back form ball, reduce decrease speed, open intake valve 4 when discharging and water inlet; Close intake valve 4 when vacuumizing, get rid of the gas in the water, in case get into the unfavorable granulation of expanding in the cooling tower; The ice pellets dressing pushing plate 29 (being also referred to as ice pellets dressing propulsive wing 29) that certain angle is arranged in the ice pellets dressing rotary drum; The ice pellets and the plaster of paris get into ice pellets dressing rotary drum 13 simultaneously through ice pellets, gypsum import 14,13 fens ice pellets dressings of ice pellets dressing rotary drum section 26, remove 28 3 sections designs of the polishing section of solidifying behind unnecessary gypsum section 27, the ice pellets dressing, and ice pellets dressing section 26 temperature can make the thawing of ice pellets appearance use the gypsum dressing; Removing unnecessary gypsum section 27 temperature is down to zero following; Rotatory drum wall is the sieve aperture shape, and unnecessary land plaster reclaims usefulness again behind the dressing, and the polishing section of solidifying 28 temperature keep subzero behind the ice pellets dressing; Ice pellets rotation polishing behind the dressing is solidified; Arrive get into-1~-10 ℃ of cooling chamber after discharging opening 15 dischargings behind the ice pellets dressing and condensed 10~600 minutes after, changing ground over to has the place of drainage system to deposit, and after ice pellets all melts, promptly forms neededly to refuse to fire insulating board for building and use the plaster shell steam bubble.

Claims (5)

1. a production refuses to fire the device of insulating board for building with the plaster shell steam bubble; Comprise that successively the have vent valve (1), intake valve (4), water tank that are communicated with vacuumize the water tank (16) of valve (18), water tank water inlet and inlet valve (17) and delivery port and flowing water Valve (10), the granulation tower (5) that has refrigerant import (8), refrigerant exit (9), granulation tower vacuum suction pipeline (12) and ice pellets discharge gate (7) and ice pellets dressing rotary drum (13); It is characterized in that: granulation tower (5) comprises tower body, is arranged on the rotation water cutter motor (6) outside the tower body top, and granulation tower (5) is connected through the delivery port and the flowing water Valve (10) of granulation tower water inlet (11) with water tank (16); In the tower body top of granulation tower (5), be provided with and rotate the rotation water handle of a knife (19) that water cutter motor (6) is connected; Rotation water cutter (20) is installed on rotation water handle of a knife (19); Be distributed with the water nozzle (21) that is connected with distributive pipe (22) on rotation water cutter (20) next door; Refrigerant import (8) that the tower body outside has and refrigerant exit (9) the granulation tower refrigerant coil pipe (25) inner with being arranged on tower body is connected; Granulation tower refrigerant coil pipe (25) constitutes cooling chamber (23) at the tower body middle part, is provided with ice pellets storehouse (24) in the tower body bottom, and ice pellets discharge gate (7) is positioned at the tower body bottom; Being placed on ice pellets dressing rotary drum (13) below the ice pellets discharge gate (7) comprises ice pellets dressing rotary drum housing, is opened in being arranged in ice pellets and gypsum import (14) below the ice pellets discharge gate (7), being installed in discharging opening (15) behind spiral helicine ice pellets dressing pushing plate (29) and the ice pellets dressing of rotation of ice pellets dressing rotary drum housing on the ice pellets dressing rotary drum housing.
2. production according to claim 1 refuses to fire the device of insulating board for building with the plaster shell steam bubble; It is characterized in that: ice pellets dressing rotary drum housing comprises removing unnecessary gypsum section (27), polishing the section of solidifying (28) after removing the ice pellets dressing of unnecessary gypsum section (27) back of the ice pellets dressing section (26) that makes ice pellets appearance parcel land plaster, ice pellets dressing section (26) back; The rotatory drum wall of removing unnecessary gypsum section (27) is the sieve aperture shape; Unnecessary land plaster reclaims through this sieve aperture and uses behind the dressing; The polishing section of solidifying (28) is rotated the polishing section of solidifying for the ice pellets behind the dressing behind the ice pellets dressing, and discharging opening (15) behind the arrival ice pellets dressing.
3. production according to claim 1 refuses to fire the device of insulating board for building with the plaster shell steam bubble; It is characterized in that: granulation tower (5) is the tower body of sealing; Tower body is outside equipped with heat-insulation layer; Ice pellets discharge gate (7) is a vacuum valve, and refrigerant is got into by refrigerant import (8), guarantees that through granulation tower refrigerant coil pipe (25) temperature of cooling chamber (23) reaches subzero; Again by refrigerant exit (9) with in the surplus cold interlayer that is discharged into water tank (16), water tank (16) outer wall is provided with heat-insulation layer.
4. production according to claim 1 refuses to fire the device of insulating board for building with the plaster shell steam bubble, it is characterized in that: water tank Pressure gauge (2) is installed on water tank (16).
5. production according to claim 1 refuses to fire the device of insulating board for building with the plaster shell steam bubble, it is characterized in that: granulation tower Pressure gauge (3) is installed on granulation tower (5).
CN2011202708897U 2011-07-28 2011-07-28 Device for producing plaster shell bubble of flame-retardant building insulation board Expired - Fee Related CN202200370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202708897U CN202200370U (en) 2011-07-28 2011-07-28 Device for producing plaster shell bubble of flame-retardant building insulation board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202708897U CN202200370U (en) 2011-07-28 2011-07-28 Device for producing plaster shell bubble of flame-retardant building insulation board

Publications (1)

Publication Number Publication Date
CN202200370U true CN202200370U (en) 2012-04-25

Family

ID=45964507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202708897U Expired - Fee Related CN202200370U (en) 2011-07-28 2011-07-28 Device for producing plaster shell bubble of flame-retardant building insulation board

Country Status (1)

Country Link
CN (1) CN202200370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109548776A (en) * 2019-01-18 2019-04-02 湖北百米生物实业有限公司 A kind of disinsection fungal spore release device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109548776A (en) * 2019-01-18 2019-04-02 湖北百米生物实业有限公司 A kind of disinsection fungal spore release device
CN109548776B (en) * 2019-01-18 2023-11-03 湖北百米生物实业有限公司 Insecticidal fungus spore release

Similar Documents

Publication Publication Date Title
CN102432327A (en) Method for preparing aluminum oxide porous ceramic with composite structure by adopting freeze drying process
CN106268503A (en) A kind of liquid nitrogen spraying freezing pelletize Minton dryer and method of work
CN202200370U (en) Device for producing plaster shell bubble of flame-retardant building insulation board
CN106524619A (en) Snow producing machine
CN105712607A (en) Spraying granulation refrigeration vacuum drying device and method for sludge
CN206693433U (en) A kind of environmental protection energy-saving type phase transformation building external structure
CN202202435U (en) Fire-resistant building warming plate
CN106895625A (en) Snow machine and snow making method
CN207724818U (en) Mold is dried and cooling bottle embryo device and note embryonal system system
CN102322104A (en) Flame repellent building heat insulation plate and manufacturing device and process thereof
CN103775069B (en) Suspended state hydrate formation simulator and stratum analogy method
CN207643383U (en) The steam-cured pond of cement electric pole
CN205575904U (en) Freezing vacuum drying device of spraying miniaturation of mud
CN205606975U (en) High -efficient system ice and snow device of liquid nitrogen
CN112622006A (en) Aerated concrete block cutting machine
CN205683631U (en) A kind of freezing solution enrichment facility
CN207569248U (en) A kind of antifreeze water-supply valve
CN102758553B (en) A kind of oat storage arrangement and method
CN204254955U (en) A kind of refrigerating chamber with cold accumulation function
CN111156750A (en) High-temperature combined automatic snow making method
CN206890935U (en) A kind of integrated condensing unit
CN110281409A (en) A kind of cutting CF wallboard automatic dustfall device
CN206128357U (en) Phase transition thermal insulation wall and roof surface
CN206866565U (en) A kind of flavoring quickly cooling device
CN207778888U (en) Deer haemin liquid nitrogen frozen case

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: JIN CE WANG JING

Effective date: 20130802

Owner name: BEILONG CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: HU YIBO

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 473000 NANYANG, HENAN PROVINCE TO: 431021 XIANGFAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130802

Address after: 431021 Xiangyang City, Hubei province Xiangcheng District Tanxi Road No. 198-1

Patentee after: Beilong Construction Group Co., Ltd.

Address before: 473000, room 1, building 601, family building, Plum Brook Hotel, Nanyang, Henan

Patentee before: Hu Yibo

Patentee before: Jin Ce

Patentee before: Wang Jing

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425

Termination date: 20160728

CF01 Termination of patent right due to non-payment of annual fee