CN202194663U - Water supply system of composite earth pressure balance shield - Google Patents

Water supply system of composite earth pressure balance shield Download PDF

Info

Publication number
CN202194663U
CN202194663U CN2011202967406U CN201120296740U CN202194663U CN 202194663 U CN202194663 U CN 202194663U CN 2011202967406 U CN2011202967406 U CN 2011202967406U CN 201120296740 U CN201120296740 U CN 201120296740U CN 202194663 U CN202194663 U CN 202194663U
Authority
CN
China
Prior art keywords
water
pump
water pump
water inlet
cooler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011202967406U
Other languages
Chinese (zh)
Inventor
马健
赵芳
张丽华
王洪月
曹海云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huarui Heavy Industry Group Co Ltd
Original Assignee
Dalian Huarui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Huarui Co Ltd filed Critical Dalian Huarui Co Ltd
Priority to CN2011202967406U priority Critical patent/CN202194663U/en
Application granted granted Critical
Publication of CN202194663U publication Critical patent/CN202194663U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A water supply system of a composite earth pressure balance shield moves with a shield cabinet vehicle. A water pump outside a tunnel automatically compensates water for a water storage tank through a water supply pipe winding drum by means of signals of a liquid level sensor. A water supply pump absorbs water from the water storage tank. A water pump I provides water for a hydraulic oil cooling device, cooled hot water is retained to provide water for the cabinet vehicle, a manual brake, secondary slurry filling and a sewage pump washing water feeding inlet, the surplus water is pressurized through a water pump V and then flows into a municipal administration sewage discharge pipe network through a water discharge pipe winding drum and a water supply device for ground mortar mixing. A water pump II provides water for an air compressor, a power distribution cabinet, a gear oil tank, a hydraulic motor reduction box cooler, and the cooled hot water returns to the water storage tank. A water pump III provides water for a foaming liquid mixer, a synchronous slurry filling pump washing loop. A water pump IV provides water for a shield tail slurry filling opening washing loop. A sewage pump is installed at the tunnel water accumulation position to pump water. Washing return water and pump sewage pass through a solid-liquid separator, and waste water enters a sewage tank and then is discharged through a water pump V which starts automatically by means of signals of the liquid level sensor. The water supply system has the advantages of being constant in cooling effect and capable of recycling waste water.

Description

The composite balancing earth-pressure shielding machine water system
Technical field
The utility model technology relates generally to a kind of shield driving equipment, is specially adapted to the water supply and the cooling system of composite balancing earth-pressure shielding machine.
Background technology
At present; Combined type earth pressure balanced shield, EPBS equipment adopts single pump interrupted water ground water supply outside the tunnel more; Each bar branch road is fetched water from the main-supply road as required in the shield machine; Circulation cooling water and surplus are supplied water and are all discharged outside the hole in all; Its principle is: the outside supply-water pump in tunnel supplies water to tunnel internal through the feed pipe reel incessantly, and recirculation cooler was to air compressor machine cooler, power distribution cabinet cooler, gear oil sump cooler, the cooling of hydraulic motor reductor cooler in a part supplied water and flows through, and the cooling water that interior recirculation cooler flows out gets into hydraulic oil cooler hydraulic oil is cooled off.Subsequently, all hot water are all outside the gutter reel is discharged the hole.Another part supplies water and is used for shield machine work water, comprises that respectively saving chassis reserves water nozzle, the water supply of people's lock, secondary grouting water supply, foam water, water for fire etc.Foul water pump drains into foul water tank with the sewage in the tunnel.The single water pump of this employing supplies water and often need keep maximum pressure of supply water and flow, but shield machine water device not all is to work simultaneously also, remains water in a large number and need discharge the outside, tunnel; Thereby cause the significant wastage of water, electric resources; And single water pump way of supplying water is when long distance construction, and along with water supply line constantly extends, pressure of supply water and flow velocity loss are serious; Cooling effect is not good, is prone to cause the equipment heating amount to cause equipment downtime greatly.
For this reason; The mode that composite balancing earth-pressure shielding machine water system that we are newly developed, this system adopt water pump directly to supply with respectively from the water storage box water intaking again, the switch supply-water pump supplies water according to actual needs; While optimal design loop; Can the reflux water storage box cooling of a part of cooling water is utilized again, have sewerage treatment and recycling function concurrently, greatly practiced thrift water supply volume.And such way of supplying water makes the apparatus cools effect do not excavated distance affects, effectively utilizes and practiced thrift water resource more.
Find that through retrieval following two patents have mutually nearby with the water system that we are developed, but essential difference is all arranged in principle and structure itself.
1, " shield structure independence water-adding system " (patent No.: ZL201020524753.X), but this system mainly uses the generous amount of automatic water supplement to add water tank and a big lift water pump totally supplies water, and belongs to open system, is used for the dregs improvement of balancing earth-pressure shielding machine the place ahead.And our design is to adopt a plurality of special-purpose supply-water pumps directly to supply water; Also have cooling back installation, tunnel blowdown apparatus, equipment for separating liquid from solid, foul water tank and dewatering installation etc. in addition; Problems such as water supply capacity deficiency and cooling effect are not good in the time of can solving the composite shield long distance construction, water consumption is big, this independent water-adding system is all different from function, principle, structure aspects with our water system of design.
2, " open type tunnel piercing organic waste water cycling and reutilization device " (patent No.: ZL200820141662.0); This device mainly solves a kind of problem of open type tunnel piercing organic waste water cycling and reutilization; And we mainly solve when being composite balancing earth-pressure shielding machine long distance construction water supply capacity deficiency and the not good problem of cooling effect also can improve the utilization rate of water resource simultaneously.
Water system newly developed is compared with existing composite shield machine water system, and water supply volume has reduced about 40%, has practiced thrift a large amount of water, electric resources, social benefit and remarkable in economical benefits.Simultaneously, also significant aspect alternative import, reduction shield machine equipment cost.
Summary of the invention
The proposition of the utility model aims to provide problems such as a kind of defective that water supply capacity is not enough, cooling effect is not good that exists when solving existing water system long distance construction and water-use efficiency are not high, has improved water system performance and using water wisely.
The technical solution of the utility model is real like this:
A kind of composite balancing earth-pressure shielding machine water system; Can advance with the shield machine chassis; Comprise feed pipe reel, water pump I, water storage box, water pump II, air compressor machine cooler, power distribution cabinet cooler, gear oil sump cooler, hydraulic oil cooler, hydraulic motor reductor cooler, the chassis reservation mouth of a river, Ren Zha feed water inlet, secondary grouting feed water inlet, foam solution blender, shield tail grouting port flush loop, tunneling synchronous mud injecting pump flush loop, water pump III, water pump IV, foul water pump, solid-liquid separator, foul water tank, water pump V, gutter reel, ground mortar mixing supply equipment; It is characterized in that described feed pipe reel is fixed on the shield machine chassis; Supply-water pump is connected outside water inlet and the tunnel; Delivery port is connected with the water storage box water inlet, according to the liquid level sensor signal automatic water supplement of water storage box; Water pump I is installed in the water storage box; Delivery port is connected with the hydraulic oil cooler water inlet; Pipeline and be connected with a plurality of chassis and reserve water nozzles therebetween; The hydraulic oil cooler hot-water outlet is connected with water pump V water inlet, and pipeline parallel connection therebetween also is connected to a plurality of chassis reservation water nozzles, Ren Zha feed water inlet, secondary grouting feed water inlet, foul water pump flushing water inlet; Water pump II is installed in the water storage box, and delivery port is connected with air compressor machine cooler, power distribution cabinet cooler, gear oil sump cooler, the hydraulic motor reductor cooler water inlet of parallel connection, and its parallelly connected return pipe converges the back and inserts water storage box; Water pump III is installed on the chassis of water storage box place, and water inlet connects water storage box, and delivery port is connected with foam solution blender, the tunneling synchronous mud injecting pump flush loop water inlet of parallel connection; Water pump IV is installed on the chassis of water storage box place, and water inlet connects water storage box, and delivery port is connected with shield tail grouting port flush loop water inlet; Foul water pump is installed in ponding place, tunnel, leans on another water inlet branch road of three way cock conversion to stretch into the sewage of extraction below the tunnel oilysewage surface; The delivery port of tunneling synchronous mud injecting pump flush loop delivery port, shield tail grouting port flush loop delivery port, foul water pump all is connected with the solid-liquid separator inlet, and the solid-liquid separator outlet is connected with the foul water tank water inlet; Another water inlet branch road of water pump V is connected with the foul water tank delivery port, and water pump V delivery port is connected with gutter reel water inlet; Gutter reel delivery port is connected with ground mortar mixing supply equipment, municipal blowdown pipe network reutilization of the sewage pipeline.
Compared with prior art, the utility model has the advantages that conspicuously, mainly show:
1, adopts water pump from the water storage box point-to-point direct supply mode of fetching water, make the water system cooling effect no longer receive long distance to excavate restriction, good cooling results;
2, the processing to cooling water and sewage utilizes again, makes same excavation reduce about 40% apart from water supply volume, has greatly practiced thrift water resource;
3, the water supply installation line arrangement is simply direct, and required detecting element is few, has reduced system cost;
4, sewage slagging-off processing procedure had both made waste water be fully used, and handled reducing the heavy burdens simultaneously again for municipal wastewater.
Description of drawings
The utility model has accompanying drawing 1 width of cloth.
Fig. 1 is the water system schematic diagram of the utility model.
Among the figure, 1, the feed pipe reel, 2, water pump, 3, water storage box, 4, water pump; 5, air compressor machine cooler, 6, the power distribution cabinet cooler, 7, gear oil sump cooler, 8, hydraulic oil cooler, 9, hydraulic motor reductor cooler; 10, chassis is reserved water nozzle, and 11, the Ren Zha feed water inlet, 12, the secondary grouting feed water inlet, 13, the foam solution blender, 14, shield tail grouting port flush loop; 15, tunneling synchronous mud injecting pump flush loop, 16, water pump, 17, water pump 18, foul water pump, 19, solid-liquid separator; 20, foul water tank, 21, water pump, 22, the gutter reel, 23, ground mortar mixing supply equipment.
The specific embodiment
A kind of composite balancing earth-pressure shielding machine water system as shown in Figure 1 comprises feed pipe reel 1, water pump I 2, water storage box 3, water pump II4, air compressor machine cooler 5, power distribution cabinet cooler 6, gear oil sump cooler 7, hydraulic oil cooler 8, hydraulic motor reductor cooler 9, the chassis reservation mouth of a river 10, Ren Zha feed water inlet 11, secondary grouting feed water inlet 12, foam solution blender 13, shield tail grouting port flush loop 14, tunneling synchronous mud injecting pump flush loop 15, water pump III16, water pump IV17, foul water pump 18, solid-liquid separator 19, foul water tank 20, water pump V21, gutter reel 22, ground mortar mixing supply equipment 23.
In the shield machine tunneling process, supply-water pump supplies water to water storage box 3 through feed pipe reel 1 outside the tunnel, and the liquid level sensor on the water storage box 3 sends liquid level signal control surface water switch pump, realizes automatic water supplement.
Water pump I 2 starts with water pump V21 is chain simultaneously, and the cold water that water pump I 2 draws is through 8 pairs of hydraulic oil coolings of hydraulic oil cooler, and the water of cooling hydraulic oil flows out after the cooler, and dividing has branch road behaviour lock feed water inlet 11 and secondary grouting feed water inlet 12 interim waters to supply water; Be distributed in the reservation water nozzle 10 that respectively saves on the chassis and can open the valve water at any time; Cooling water also is used for washing foul water pump 18 blowoff lines, and the sewage of flushing flows into solid-liquid separator 19 slag removal and purifications, and the waste water after the purification enters foul water tank 20; Part residue cooling used beat water is discharged outside the hole by water pump V21 and is utilized.Cooling used beat water has improved the utilization rate of water resource through repeatedly recycling, plays the effect of energy-saving and water-saving.
The cold water that water pump II4 draws is to equipment such as air compressor machine cooler 5, power distribution cabinet cooler 6, gear oil sump cooler 7, hydraulic motor reductor cooler 9 parallel connection cooling; Cooling back current are got back to water storage box 3; With initiate cold water mix cooling recycling in the water storage box; Because initiate cool water quantity much larger than water pump II4 recirculated cooling water amount, so neither influence next circulation cooling effect, has been saved great lot of water resources again.
When needs added foam improvement excavation soil property environment, opening water pump III16 was that foam solution blender 13 supplies water; Water pump III16 water supply branch road is used for washing tunneling synchronous mud injecting pump flush loop 15, and the sewage of flushing flows into foul water tank 20 after solid-liquid separator 19 purified treatment.
When synchronous grouting finishes, when needing the flushing grouting port, open water pump IV17 to 14 flushings of shield tail grouting port flush loop, the sewage of flushing flows into foul water tank 20 after solid-liquid separator 19 purified treatment.
When ponding in the tunnel surpassed warning line, dredge pump 18 started automatically, ponding in the tunnel is expelled to solid-liquid separator 19 purified treatment after, flow into foul water tank 20.
When water pump I 2 does not open; Water pump V21 opens waste discharge automatically according to the liquid level sensor signal that is equipped with on the foul water tank 20; The waste water of discharging is through outside the gutter reel 22 discharge tunnels, and out outlet, tunnel part current flow directly into municipal blowdown pipe network, and it is that the mortar mixing is supplied water that the delivery port branch has branch road to connect ground mortar mixing supply equipment 23 pipelines; Waste water is reused once more, save great lot of water resources.
This water system of new research and development; Water storage box 3 advances with the shield machine chassis with water pump, and each supply-water pump and water storage box relative distance are constant, and the water supply line distance is constant; Overcome the low defective of pressure current prompt drop that supplies water and cause by the long distance of single water pump, guaranteed constant cooling effect; Through reasonable Arrangement discharge of wastewater and scrubbing loop, make that the waste water of discharging is repeatedly reused simultaneously, greatly save water resource.

Claims (1)

1. composite balancing earth-pressure shielding machine water system; Can advance with the shield machine chassis; Comprise feed pipe reel (1), water pump I (2), water storage box (3), water pump II (4), air compressor machine cooler (5), power distribution cabinet cooler (6), gear oil sump cooler (7), hydraulic oil cooler (8), hydraulic motor reductor cooler (9), the chassis reservation mouth of a river (10), Ren Zha feed water inlet (11), secondary grouting feed water inlet (12), foam solution blender (13), shield tail grouting port flush loop (14), tunneling synchronous mud injecting pump flush loop (15), water pump III (16), water pump IV (17), foul water pump (18), solid-liquid separator (19), foul water tank (20), water pump V (21), gutter reel (22), ground mortar mixing supply equipment (23); It is characterized in that described feed pipe reel (1) is fixed on the shield machine chassis; Supply-water pump is connected outside water inlet and the tunnel; Delivery port is connected with water storage box (3) water inlet, according to the liquid level sensor signal automatic water supplement of water storage box (3); Water pump I (2) is installed in the water storage box (3); Delivery port is connected with hydraulic oil cooler (8) water inlet; Pipeline and be connected with a plurality of chassis and reserve water nozzles (10) therebetween; Hydraulic oil cooler (8) hot-water outlet is connected with water pump V (21) water inlet, therebetween pipeline and be connected with a plurality of chassis and reserve water nozzles (10), Ren Zha feed water inlet (11), secondary grouting feed water inlet (12), foul water pump (18) flushing water inlet; Water pump II (4) is installed in the water storage box (3); Delivery port is connected with air compressor machine cooler (5), power distribution cabinet cooler (6), gear oil sump cooler (7), hydraulic motor reductor cooler (9) water inlet of parallel connection, and its parallelly connected return pipe converges the back and inserts water storage box (3); Water pump III (16) is installed on the chassis of water storage box (3) place, and water inlet connects water storage box (3), and delivery port is connected with foam solution blender (13), tunneling synchronous mud injecting pump flush loop (15) water inlet of parallel connection; Water pump IV (17) is installed on the chassis of water storage box (3) place, and water inlet connects water storage box (3), and delivery port is connected with shield tail grouting port flush loop (14) water inlet; Foul water pump (18) is installed in ponding place, tunnel, leans on another water inlet branch road of three way cock conversion to stretch into the sewage of extraction below the tunnel oilysewage surface; The delivery port of tunneling synchronous mud injecting pump flush loop (15) delivery port, shield tail grouting port flush loop (14) delivery port, foul water pump (18) all is connected with solid-liquid separator (19) inlet, and solid-liquid separator (19) outlet is connected with foul water tank (20) water inlet; Another water inlet branch road of water pump V (21) is connected with foul water tank (20) delivery port, and water pump V (21) delivery port is connected with gutter reel (22) water inlet; Gutter reel (22) delivery port is connected with ground mortar mixing supply equipment (23), municipal blowdown pipe network reutilization of the sewage pipeline.
CN2011202967406U 2011-08-15 2011-08-15 Water supply system of composite earth pressure balance shield Withdrawn - After Issue CN202194663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202967406U CN202194663U (en) 2011-08-15 2011-08-15 Water supply system of composite earth pressure balance shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202967406U CN202194663U (en) 2011-08-15 2011-08-15 Water supply system of composite earth pressure balance shield

Publications (1)

Publication Number Publication Date
CN202194663U true CN202194663U (en) 2012-04-18

Family

ID=45949580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202967406U Withdrawn - After Issue CN202194663U (en) 2011-08-15 2011-08-15 Water supply system of composite earth pressure balance shield

Country Status (1)

Country Link
CN (1) CN202194663U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268994A (en) * 2011-08-15 2011-12-07 大连华锐股份有限公司 Water supply system of composite earth pressure balance shield machine
CN102747714A (en) * 2012-07-25 2012-10-24 中国水电顾问集团成都勘测设计研究院 Water complementing system for fish-way entrance
CN104234718A (en) * 2014-09-20 2014-12-24 辽宁三三工业有限公司 Water cooling system of shield tunneling machine
CN105545305A (en) * 2015-10-20 2016-05-04 辽宁三三工业有限公司 Nested water circulation system
CN103628891B (en) * 2013-11-21 2016-08-17 上海市基础工程集团有限公司 The control method of shield machine hydrologic cycle cooling system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268994A (en) * 2011-08-15 2011-12-07 大连华锐股份有限公司 Water supply system of composite earth pressure balance shield machine
CN102747714A (en) * 2012-07-25 2012-10-24 中国水电顾问集团成都勘测设计研究院 Water complementing system for fish-way entrance
CN103628891B (en) * 2013-11-21 2016-08-17 上海市基础工程集团有限公司 The control method of shield machine hydrologic cycle cooling system
CN104234718A (en) * 2014-09-20 2014-12-24 辽宁三三工业有限公司 Water cooling system of shield tunneling machine
CN105545305A (en) * 2015-10-20 2016-05-04 辽宁三三工业有限公司 Nested water circulation system

Similar Documents

Publication Publication Date Title
CN102268994B (en) Water supply system of composite earth pressure balance shield machine
CN202194663U (en) Water supply system of composite earth pressure balance shield
CN105298510B (en) Pipe replacing and slurry discharging device for slurry shield and slurry discharging mode
CN101949394A (en) Vacuum pump-assisted siphon water intaking device and method
CN101975087B (en) Mine water overall treatment utilizing technology
CN208294565U (en) Tailing slurry filling system
CN208168933U (en) A kind of buried Underwater Traffic Tunnel wastewater disposal basin dischargeable capacity optimization structure of Mining Method
CN103556611B (en) The cushion pool filling and drainage system that can generate electricity
CN202000313U (en) Dam concrete cooling water recycling device
CN201137174Y (en) Storey water saving system
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN201746896U (en) Self-control bathroom water-saving device
CN104775481B (en) Water self-circulation system in building community
CN215669618U (en) Waterproof structure of underground continuous wall
CN205894090U (en) Job site fire water cyclic utilization device
CN211685016U (en) Foundation pit underground water utilization system
CN111321714B (en) A overhaul drainage system for V style of calligraphy tailwater tunnel crowd
CN204806758U (en) Circulative cooling water supply system outside hydroelectric power plant
CN207211246U (en) Building toilet water-saving system
CN206721845U (en) A kind of diversion tunnel
CN219410782U (en) Self-flow drainage system of horizontal hole maintenance channel is drawn to pumped storage power station
CN204676676U (en) Work progress Water Sproading with utilize system
CN214090223U (en) Energy-saving and environment-friendly basement self-drainage system
CN210944946U (en) Reverse osmosis concentrated water recovery device
CN212248353U (en) Can realize utility tunnel system of catchmenting, irrigation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DALIAN HUARUI HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: HUARUI CO., LTD., DALIAN

Effective date: 20120417

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120417

Address after: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Patentee after: Dalian Huarui Heavy Industry Group Co., Ltd.

Address before: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Patentee before: Huarui Co., Ltd., Dalian

AV01 Patent right actively abandoned

Granted publication date: 20120418

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant