CN202194420U - Silo - Google Patents

Silo Download PDF

Info

Publication number
CN202194420U
CN202194420U CN 201120267104 CN201120267104U CN202194420U CN 202194420 U CN202194420 U CN 202194420U CN 201120267104 CN201120267104 CN 201120267104 CN 201120267104 U CN201120267104 U CN 201120267104U CN 202194420 U CN202194420 U CN 202194420U
Authority
CN
China
Prior art keywords
silo
central post
bulkhead
storehouse
humidity sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120267104
Other languages
Chinese (zh)
Inventor
顾大钊
李国信
薛家明
张会强
燕太祥
王顺柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communication Planning and Design Institute for Waterway Transportation Co
China Shenhua Energy Co Ltd
Shenhua Tianjin Coal Dock Co Ltd
Original Assignee
China Communication Planning and Design Institute for Waterway Transportation Co
China Shenhua Energy Co Ltd
Shenhua Tianjin Coal Dock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communication Planning and Design Institute for Waterway Transportation Co, China Shenhua Energy Co Ltd, Shenhua Tianjin Coal Dock Co Ltd filed Critical China Communication Planning and Design Institute for Waterway Transportation Co
Priority to CN 201120267104 priority Critical patent/CN202194420U/en
Application granted granted Critical
Publication of CN202194420U publication Critical patent/CN202194420U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a silo. The silo comprises a silo wall (1) and a silo top (2), and further comprises a central column (3) for supporting the silo top (2); the central column (3) takes the shape of a hollow tube; a detection device is arranged on the outer wall (4) of the central column (3); and a first opening (5) is formed at the upper end of the central column (3). The silo has the advantages that the structure is stable; the bearing capacity is relatively high; the detection device can be arranged in the silo more conveniently, so as to detect the internal conditions such as temperature, humidity and the like of the silo; and a person can enter the central column from the first opening at the upper end of the central column to maintain the detection device.

Description

Silo
Technical field
The utility model relates to the storage field, particularly, relates to a kind of silo.
Background technology
Silo is divided into two big types of agriculture silo and industrial silos for storing the warehouse of loose unpacked material.The agricultural silo is used for having grain in reserve, feed equigranular or granular material; The industry silo is used for storing loose unpacked materials such as coal, coke, cement, salt.The mechanization silo can shorten the loading and unloading flow process of material, reduces operation and maintenance cost, eliminates heavy packed operation, helps mechanization, automated job, has therefore become topmost storage form.
Silo is as storing the bulk cargo facility, develops into now also with regard to more than 100 years history, and the major diameter silo is shorter in the use history of China, receives the influence of each side factors such as economic factor, designing technique, building technology, and mostly domestic silo is the low capacity silo.In recent years, industries such as mine, grain, power plant, cement have been built silo a large amount of, that capacity does not wait successively.But receive the restriction of China's technical standard and the influence that industry is started late; No matter be in the silo designing technique; Still on building technology, all there is deficiency in various degree in silo, and these deficiencies had both influenced the construction investment of silo; The safety that has influenced silo is again used with normal, has also influenced being widely used of silo.
In general major diameter silo, because silo diameter span is bigger, Hold Ceiling and storehouse back timber can only adopt steel work.But the plate of steel work and beam receive the corrosion of pernicious gas in the silo easily, and the fire line of not easy care, and steel work is relatively poor, causes security incident easily, and the load that can bear on the Hold Ceiling is also less, and bearing capacity is relatively poor.Simultaneously, the silo top does not receive the constraint of other structure, is in free state basically, and is unfavorable with stability to the globality of silo.
The utility model content
The purpose of the utility model provides a kind of silo, and the structure of this silo is firm, and weight capacity is better.Simultaneously, help the setting and the layout of silo internal inspection device, thereby convenient detect situation such as silo temperature inside, humidity, and it is inner to utilize the opening of its upper end to get into central post, checkout gear etc. is keeped in repair.
To achieve these goals; The utility model provides a kind of silo, and this silo comprises bulkhead and Cang Ding, wherein; This silo also comprises the central post that is used to support said Cang Ding; This central post is a hollow tubular, and the outer wall of said central post is provided with checkout gear, and the upper end of said central post has first opening.
Preferably, said checkout gear is temperature pick up and/or humidity sensor.
Preferably, said temperature pick up and/or humidity sensor are many groups, and these many group temperature pick ups and/or humidity sensor are along the axially spaced-apart setting of said central post.
Preferably, said many group temperature pick ups and/or humidity sensor are provided with the distance that equates at interval.
Preferably, every group of said temperature pick up and/or humidity sensor are a plurality of, and these a plurality of temperature pick ups and/or humidity sensor are provided with along the circumferential interval of the outer wall of said central post.
Preferably, said a plurality of temperature pick up and/or humidity sensor are provided with the distance that equates at interval.
Preferably, the circuit of said checkout gear passes the outer wall setting of said central post.
Preferably, the set inside of said central post has lifting gear.
Preferably, the set inside of said central post has cat ladder.
Preferably, said cat ladder is divided into multistage.
Preferably, be provided with half space between adjacent two sections said cat ladders.
Preferably, the lower end of the outer wall of said central post is provided with second opening.
Preferably, be provided with the passage with said second open communication between the outer wall of said central post and the bulkhead, this passage leads to the outside of silo.
Preferably, said Cang Ding comprises Hold Ceiling and storehouse back timber, and said storehouse back timber is arranged between said central post and the bulkhead, and said Hold Ceiling is arranged on the back timber of said storehouse.
Preferably, the height of said central post is equal to or greater than the height of said bulkhead.
Preferably, said storehouse back timber with said central post be the center equal angles be arranged between said central post and the bulkhead.
Pass through technique scheme; In silo (particularly large-scale silo), central post is set, is used to support the Cang Ding of silo, thereby reduces the span of storehouse back timber; Make the Cang Ding that in the bigger silo of Capacity Ratio, can adopt concrete structure; The weight capacity grow of silo, globality is better, and structural stability improves.Because Cang Ding adopts concrete structure, not corroded by the inner pernicious gas of silo, fire line is also better, and safety is higher.Because the existence of the central post of silo; Can be on the outer wall of central post the installation and measuring device; For example device, gas-detecting device or the material-level detecting device etc. of temperature measuring equipment, hygrometric degree, thus be convenient to detect silo temperature inside, humidity, gas or material level etc., the particularly environmental aspect of the silo center in large-scale silo; Reach better monitoring, so that it is controlled to the silo inner case.Simultaneously, central post is constructed to hollow tubular, under the situation that guarantees enough structural strengths, and can economical with materials.In addition, opening is set, door or cover plate can be installed, on opening in case roof leaking etc. in the upper end of central post.And it is inner to get into central post through opening, to the instrument of the various checkout gears of central post inside, circuit etc. safeguard, maintenance etc.Like this, the structure of silo obtains reinforcement effect, also can easily the installation and measuring device, and be beneficial to the inner monitoring of silo, and use more convenient and safety.
Further feature of the utility model and advantage will partly specify in the specific embodiment subsequently.
Description of drawings
Accompanying drawing is the further understanding that is used to provide the utility model, and constitutes the part of manual, is used to explain the utility model with the following specific embodiment, but does not constitute the restriction to the utility model.In the accompanying drawings:
Fig. 1 is the sketch map of silo of the embodiment of the utility model.
Description of reference numerals
1 bulkhead, 2 Cang Ding
3 central posts, 4 outer walls
5 first openings, 6 cat ladders
7 half spaces, 8 Hold Ceilings
9 storehouse back timbers
The specific embodiment
Be elaborated below in conjunction with the specific embodiment of accompanying drawing to the utility model.Should be understood that the specific embodiment described herein only is used for explanation and explains the utility model, is not limited to the utility model.
In the utility model, not do under the situation of opposite explanation, the noun of locality of use typically refers to height overhead like " upper and lower "; Higher is " on ", lower is D score, " inside and outside " is meant the distance of decentre post 3; Nearer is " interior ", and far away is " outward "
Each embodiment of the silo of the utility model all is applicable to the silo of various sizes size, capacity requirement; And have preferred embodiment variously according to the concrete instructions for use of silo, combine the various specific embodiment that the technical scheme of the utility model is described at present.
As shown in Figure 1, the silo of the utility model has bulkhead 1 and top, storehouse 2, and bulkhead 1 can surround shape arbitrarily, and for example circle, square etc. are preferably round silo.In such silo, central post 3 can be set, also central post 3 can be set.In the bigger silo of general capacity, because physical dimension is bigger, the span of the storehouse back timber 9 on top, storehouse 2 is bigger, therefore all central post 3 can be set in silo, is used to support top, storehouse 2, makes the Stability Analysis of Structures of silo, firmly to receive force intensity higher.At this moment, the storehouse back timber 9 on top, storehouse 2 is arranged between central post 3 and the bulkhead 1, and Hold Ceiling 8 is arranged on the storehouse back timber 9, and is inner to hide silo, prevents that interior grain that stores of silo or coal etc. from being exposed to the sun and rain.
A kind of preferred embodiment in, storehouse back timber 9 is set to many, and is radial arrangement; Be to distribute with angle same between each storehouse back timber 9, perhaps back timber 9 orthogonal thereto shapes in storehouse are arranged, and are promptly crisscross between each storehouse back timber 9; And be parallel to each other or vertically, form square latticed.Preferably with central post 3 be the center equal angles be arranged between central post 3 and the bulkhead 1, make central post 3 stressed evenly, the structure on top, storehouse 2 is more firm.
Wherein, the height of central post 3 can equal the height of bulkhead 1, and is as shown in Figure 1, forms the top, storehouse 2 on plane, helps the setting that devices such as 2 top haul tracks and cloth are pushed up in the storehouse, reduces the height of silo.In addition, the height of central post 3 can form the top, storehouse 2 on pinnacle greater than the height of bulkhead 1, is convenient to draining etc.
And in small-sized silo, because storehouse back timber 9 spans on top, storehouse 2 are less, the consideration from simplified structure, saving cost can not be provided with central post 3.The storehouse back timber 9 on top, storehouse 2 is set directly at bulkhead 1 top like this, and has many, be radial arrangement, and Hold Ceiling 8 just is set directly on the storehouse back timber 9.But, in order to strengthen the structural strength of silo, increase the load bearing stength on top, storehouse 2, also central post 3 can be set in the center in the bulkhead 1.
Can utilize various materials (like steel, concrete etc.) for Hold Ceiling 8 and storehouse back timber 9, also can adopt the whole bag of tricks to process.Preferably, storehouse back timber 9 is concrete structure with Hold Ceiling 8, the method that can adopt concrete prefabricated mode or concrete cast-in-situ all can, both all can form the Hold Ceiling 8 and storehouse back timber 9 that meets user demand.
In order to increase the force intensity that receives on top, storehouse 2, as shown in Figure 1, can push up 2 in the storehouse and arrange ring beam; Ring beam can have any shape, and is preferably circle, thereby ring beam is that the center of circle is arranged with the center on storehouse top 2; And intersect with storehouse back timber 9, form firm storehouse and push up 2 structures, bearing capacity is stronger.And ring beam both can be prefabricated, also can be cast-in-place, and job practices is flexible.More preferably, ring beam is many, and structure is further firm.
Material transporting gets into the silo storage inside for ease, and is as shown in Figure 1, on Hold Ceiling 8, discharge port is set.Discharge port can be shape arbitrarily, like square and circle etc., in order to improve discharge rate, a plurality of discharge ports is set on Hold Ceiling 8.Above silo, be furnished with the haul track, operation has the haul dolly on the track.A plurality of discharge ports can be arranged arbitrarily, but for simplified structure, a plurality of discharge ports are arranged in a linear, and the haul track can be set to straight line and cooperates with silo structure like this.In addition, discharge port can be annular, thereby cooperates with the rotation material distributing machine of silo top, makes things convenient for cloth.Preferably, according to the size of silo and the operation characteristic of material transport equipment, discharge port is arranged as two row of symmetry, is convenient to the symmetric arrangement of delivery device, the stressed symmetry in both sides when filling material.Simultaneously, every row are arranged two or three discharge ports, have satisfied the requirement of discharge rate.
Lid is set on discharge port, prevents to leak and play the effect of ventilation when advancing dust etc.Preferably, lid can be processed by profiled sheet, and is too many at the silo internal gas, when causing pressure to raise, covers compressive deformation, thereby reaches the effect of ventilation, practiced thrift cost.Like this, discharge port not only can charging but also can have been played the effect of venting of dust explosion.In another embodiment, can on Hold Ceiling 8, explosion relief door be set, when the silo internal pressure is too high, carry out venting of dust explosion, guarantee the safe in utilization of silo.
Wherein, central post 3 can have cross sectional shape arbitrarily, as square or circular.Central post 3 also can be constructed to solid or hollow according to the use needs, and as shown in Figure 1 in the silo of the utility model, central post 3 is a hollow tubular, under the situation that guarantees enough structural strengths, and can economical with materials.
In addition; Can be on the outer wall 4 of central post 3 the installation and measuring device; For example device, gas-detecting device or the material-level detecting device etc. of temperature measuring equipment, hygrometric degree, thus be convenient to detect silo temperature inside, humidity, gas or material level etc., particularly in large-scale silo, detect the environmental aspect of silo center; Thereby reach better monitoring, so that it is controlled to the silo inner case.Especially; Because the design feature and the control mode of each checkout gear self; Preferably, on the outer wall 4 of central post 3, temperature pick up and/or humidity sensor are set, with near the temperature and humidity inspection center's post 3; Thereby, satisfy the use needs of silo to the monitoring and the control of the inner better off of whole silo.
Temperature pick up and/or humidity sensor can be provided with one group, and many groups also can be set.Preferably; Temperature pick up and/or humidity sensor are many groups; And axially spaced-apart setting along central post 3; Temperature and humidity with to each position from top to bottom, silo inside reaches detection, and undetected position appears in the difference of each position temperature and humidity on the short transverse to avoid in the large-scale silo.More preferably, organize temperature pick up and/or humidity sensor more and be provided with at interval with the distance that equates, like this avoid occurring as far as possible surveyed area overlapping in, reduce the use of temperature pick up and/or humidity sensor.And according to the size of silo and the detection range size of temperature pick up and/or humidity sensor; Can confirm distance at interval between group number and every group of temperature pick up and/or humidity sensor; The 3-5 group for example is set; Every group of 5-10 rice setting at interval, this mode are applicable to and highly are the high silo of 20-60 rice.
Every group of temperature pick up and/or humidity sensor can be provided with one, also can be provided with a plurality of.Every group when being set to one, each is organized temperature pick up and/or humidity sensor and is uniformly distributed with circumferentially can being set to, and is promptly distributing with angle same between each sensor on the same horizontal plane; Every group is set to when a plurality of, and a plurality of temperature pick ups and/or humidity sensor are provided with along the circumferential interval of the outer wall 4 of central post 3, with each circumferential position of complete detection silo.More preferably, a plurality of temperature pick ups and/or humidity sensor are provided with the distance that equates at interval, reduce temperature pick up and/or humidity sensor quantity when reaching complete detection, practice thrift cost.And according to the size of silo and the detection range size of temperature pick up and/or humidity sensor; Can confirm distance at interval between group number and every group of temperature pick up and/or humidity sensor; For example be provided with 3-5; Every group of 1-5 rice setting at interval, this mode is applicable to that central post 3 girths are the silo of 3-25 rice.
Wherein, the outer wall 4 that the circuit of checkout gear can pass central post 3 is provided with, and on outer wall 4, inspection hole can be set, and avoids the circuit of checkout gear to receive the extraneous disturbance and the corrosion of gas etc.In addition, as shown in Figure 1, first opening 5 is set with inlet as personnel's turnover in the upper end of central post 3, door or cover plate can be installed, in case roof leaking and falling object from high altitude etc. on first opening 5.Get into central posts 3 inside through first opening 5, to the instrument of the inner various checkout gears of central post 3, circuit etc. safeguard, maintenance etc.Personnel's turnover for ease; Pass in and out central post 3 inside nearby; Preferably can be provided with second opening in the lower end of the outer wall 4 of central post 3, second opening can be set to door, and the maintenance personal can get into central posts 3 inside from first opening 5 and keep in repair from the top down; And, perhaps be reversed etc. from the second opening acentric post 3.Simultaneously; Corresponding opening also is set on bulkhead 1, between the outer wall 4 of central post 3 and bulkhead 1, is provided with the passage with second open communication, this passage leads to the outside of silo; Thereby the maintenance personal can conform to the principle of simplicity to make things convenient for personnel's turnover in outside central post 3 inside that get into, storehouse through this passage.Like this, central post 3 has not only realized the storehouse is pushed up the support of 2 structures, plays reinforcement effect, has also made things convenient for the installation of checkout gear, is beneficial to the monitoring of silo internal environment, the more convenient and safety of the use of silo.
Wherein, can be at the set inside lifting gear of central post 3, elevator for example makes things convenient for personnel's up and down in central post 3.As shown in Figure 1, also can be at the set inside cat ladder 6 of central post 3, simple in structure like this, cost is lower.Cat ladder can be divided into multistage, and every section is crisscross arranged, and the personnel of preventing climb fatigue, also easy chosen material.Between adjacent two sections cat ladders 6 half space 7 can also be set, supply maintenance personal's rest, checkout equipment.
The storehouse bottom structure inner at silo is provided with out funnel, and the material that is stored in the silo can transport silo through going out funnel.The cross section that goes out funnel can be circle or polygon, and circular cross section helps accelerating the speed of discharging, and polygon is built convenient.Go out funnel and comprise supporter and be arranged in the funnel plate on the supporter, supporter can bear the pressure of funnel top material so that the structure of discharging funnel is firm.Funnel plate can be processed by concrete slab, can adopt cast-in-place or prefabricated mode.The upper peripheral edge of funnel plate is provided with near bulkhead 1 and separates with bulkhead 1; Going out between funnel and the bulkhead 1 does not have annexation, and both force-bearing situations are simple, when forming out funnel, needn't consider the structure of bulkhead 1 and stressed; Can independently construct, job practices is simple.In addition,, need not carry out autofrettage during the funnel plate construction, thereby also practice thrift the engineering time, improve operating efficiency it because funnel plate is not connected with bulkhead 1.
Supporter can adopt the mode that pile body is set, and preferably, supporter comprises supporting walls and is filled in the filler between supporting walls, funnel plate and the bulkhead 1.Supporter is two relative walls that run through at the bottom of the storehouse, and space between the two is the passage of haul belt.The supporter construction of this structure is relatively simple, and cost is lower, and simultaneously stressed more firm, holding capacity is bigger.
Preferably, filler adopts the low compressibility material, and the compression ratio after it is stressed is lower; Be generally less than 5%, more preferably, filler is the sandstone material; Make the discharging funnel form after under the state of pressurized, can funnel plate sinks owing to the filler compression, cause the fracture of funnel plate pressurized.
Go out funnel and can be any amount; Be provided with under a plurality of situation that go out funnel; When being provided with central post 3 in the silo; A plurality ofly go out funnel and be arranged between bulkhead 1 and the central post 3 around central post 3, and each upper peripheral edge of funnel plate that goes out the outside of funnel separates near bulkhead 1 and with bulkhead 1, the upper peripheral edge of inboard funnel plate separates near central post 3 and with central post 3.And the adjacent upper peripheral edge that goes out funnel interconnects, and to form interconnective monoblock supporting surface to support the material of top, makes material to flow out silo inside from the bell mouth that goes out funnel.
Because the passage of haul belt is two parallel channels that run through at the bottom of the storehouse of silo, preferably, a plurality ofly goes out funnel and be arranged in a linear; More preferably; The discharging choana cloth is changed to two row of symmetry, and every row are furnished with two or three and go out funnel, have both satisfied the requirement of discharging speed; Make that again structure can be too not complicated, convenient construction and use.
The job practices of the silo of the utility model is described below:
The construction of carrying out the basis earlier is to form the basis of silo.When the construction basis, form a plurality of pile foundations earlier, form cushion cap to form whole firm foundation at the top of a plurality of pile foundations then.Preferably, pile foundation adopts back mud jacking construction technology to form, and this job practices is applicable to the construction of silo, and is simple.And the construction of cushion cap is in two steps, the strip foundation of ring and outer shroud in forming earlier, and the strip foundation of outer shroud is mainly used in and supports bulkhead 1, makes its structure firm; The strip foundation of interior ring is mainly used in centre of support post 3, makes that central post 3 is stressed firm.Form a mat foundation then, mat foundation links to each other the strip foundation of interior ring and outer shroud and forms the basis, and whole like this basis links together, and forming stress surface is cushion cap.Like this can so that silo stressed evenly, holding capacity is bigger.
On the basis, form bulkhead 1 after foundation construction is accomplished again, the construction of bulkhead 1 can be adopted form construction technology, forms the bulkhead 1 of design height.Form construction technology is specially adapted to the thin and high characteristics of bulkhead 1 of silo, and it is convenient to implement, and practicality is high.
Accomplish after the construction of bulkhead 1, form top, storehouse 2 at the top of bulkhead 1.The construction on top, storehouse 2 was divided into for two steps, i.e. storehouse back timber 9 construction sequences: adopt concrete prefabricated or concrete cast-in-situ storehouse back timber 9, storehouse back timber 9 is arranged between bulkhead 1 and the central post 3, to reduce the span of storehouse back timber 9; Hold Ceiling 8 construction sequences: adopt concrete prefabricated or concrete cast-in-situ Hold Ceiling 8, Hold Ceiling 8 is covered on the storehouse back timber 9, to hide the silo inner space.Be provided with at silo under the situation of ring beam; The storehouse is pushed up 2 construction sequences and is also comprised the ring beam construction sequence; Itself and storehouse back timber 9 construction sequences are carried out simultaneously, adopt concrete prefabricated or concrete cast-in-situ ring beam, and ring beam is arranged on the annular that forms sealing between the storehouse back timber 9; Storehouse back timber 9 and ring beam are linked together, make the storehouse push up 2 stressed evenly.If adopt the method for concrete cast-in-situ Hold Ceiling 8 and storehouse back timber 9, top, whole storehouse 2 forms together, and promptly Hold Ceiling 8 is constructed with storehouse back timber 9 simultaneously, and job practices is simple.If adopt the method for concrete prefabricated Hold Ceiling 8 and storehouse back timber 9, because pushing up 2, the storehouse can in basis or bulkhead 1 construction, carry out the prefabricated of top, storehouse 2 each structure, wait bulkhead 1 is accomplished directly to install afterwards and is got final product, so can the reduction of erection time.
The job practices of silo also comprises the funnel construction sequence: the inside at silo forms out funnel; This goes out funnel and comprises supporter and funnel plate; Supporter is arranged on the basis, and funnel plate is arranged on the said supporter and the upper peripheral edge of said funnel plate separates with bulkhead 1.Go out funnel and can construct and form before the top, construction storehouse, bulkhead 1 back 2, also can be in bulkhead 1 work progress the height of bulkhead 1 greater than carrying out simultaneously with bulkhead 1 construction after going out funnel.The construction of supporting walls is carried out in the construction that goes out funnel earlier, on the basis, forms supporting walls, and between two relative supporting walls, to form passage, supporting walls runs through at the bottom of the storehouse of silo, is used for passing through of haul belt; Carry out the construction of funnel plate then, fill filler in the outside of supporting walls, above filler, form funnel plate, funnel plate has certain gradient, is convenient to material because gravity glides.In the funnel plate construction sequence, comprise again: the funnel plate part that forms predetermined altitude; And below this funnel plate part that forms, fill said filler; The filling of filler and the formation of funnel plate hocket up to the funnel that goes out that reaches design height, and job practices is simple like this, sound construction.This job practices is flexible and changeable, is applicable to the silo construction of all size.
In the silo that is provided with central post 3, this job practices also comprises central post 3 construction sequences, forms central post 3 with the center at silo, is used to support top, storehouse 2, makes that the silo bearing capacity is better.Preferably, central post 3 construction sequences and bulkhead 1 construction sequence are carried out simultaneously, to practice thrift the duration.At this moment, form out funnel between central post 3 and the bulkhead 1, i.e. the funnel of constructing out of space between bulkhead 1 and central post 3.Preferably, in going out the funnel construction sequence, form a plurality of funnels that go out, to satisfy the needs of discharging speed.More preferably, a plurality ofly go out funnel and construct simultaneously,, improve efficiency of construction to shorten the construction period.
In the job practices of preferred implementation, each upper peripheral edge that goes out the outside of funnel separates near bulkhead 1 and with bulkhead 1, and inboard upper peripheral edge separates near central post 3 and with central post 3.Go out funnel and bulkhead 1, central post 3 does not have annexation, both force-bearing situations are uncorrelated, when forming out funnel, needn't consider the structure of bulkhead 1 and central post 3 and stressed, can independently construct, job practices is simple.In addition,, need not carry out autofrettage during the funnel plate construction, thereby also practice thrift the engineering time, improve operating efficiency it because funnel plate is not connected with central post 3 with bulkhead 1.
The final like this silo that has formed the embodiment of the utility model, this job practices is simple, and applicability is wide, and the force-bearing situation of each member is simple, the stability under loading of whole silo, bearing capacity is bigger.
More than combine accompanying drawing to describe the preferred implementation of the utility model in detail; But; The utility model is not limited to the detail in the above-mentioned embodiment; In the technical conceive scope of the utility model, can carry out multiple simple variant to the technical scheme of the utility model, these simple variant all belong to the protection domain of the utility model.
Need to prove in addition; Each concrete technical characterictic described in the above-mentioned specific embodiment under reconcilable situation, can make up through any suitable manner; For fear of unnecessary repetition, the utility model is to the explanation no longer separately of various possible compound modes.
In addition, also can carry out combination in any between the various embodiment of the utility model, as long as its thought without prejudice to the utility model, it should be regarded as content disclosed in the utility model equally.

Claims (16)

1. silo; This silo comprises bulkhead (1) and Cang Ding (2); It is characterized in that this silo also comprises the central post (3) that is used to support said Cang Ding (2), this central post (3) is a hollow tubular; The outer wall (4) of said central post (3) is provided with checkout gear, and the upper end of said central post (3) has first opening (5).
2. silo according to claim 1 is characterized in that, said checkout gear is temperature pick up and/or humidity sensor.
3. silo according to claim 2 is characterized in that, said temperature pick up and/or humidity sensor are many groups, and these many group temperature pick ups and/or humidity sensor are along the axially spaced-apart setting of said central post (3).
4. silo according to claim 3 is characterized in that, said many group temperature pick ups and/or humidity sensor are provided with the distance that equates at interval.
5. silo according to claim 3 is characterized in that, every group of said temperature pick up and/or humidity sensor are a plurality of, and these a plurality of temperature pick ups and/or humidity sensor are provided with along the circumferential interval of the outer wall (4) of said central post (3).
6. silo according to claim 5 is characterized in that, said a plurality of temperature pick ups and/or humidity sensor are provided with the distance that equates at interval.
7. according to any described silo among the claim 1-6, it is characterized in that the outer wall (4) that the circuit of said checkout gear passes said central post (3) is provided with.
8. silo according to claim 1 is characterized in that, the set inside of said central post (3) has lifting gear.
9. silo according to claim 1 is characterized in that, the set inside of said central post (3) has cat ladder (6).
10. silo according to claim 9 is characterized in that, said cat ladder (6) is divided into multistage.
11. silo according to claim 10 is characterized in that, is provided with half space (7) between adjacent two sections said cat ladders (6).
12. silo according to claim 1 is characterized in that, the lower end of the outer wall of said central post (1) is provided with second opening.
13. silo according to claim 12 is characterized in that, is provided with the passage with said second open communication between outer wall of said central post (4) and the bulkhead (1), this passage leads to the outside of silo.
14. silo according to claim 1 is characterized in that, said Cang Ding (2) comprises Hold Ceiling (8) and storehouse back timber (9), and said storehouse back timber (9) is arranged between said central post (3) and the bulkhead (1), and said Hold Ceiling (8) is arranged on the said storehouse back timber (9).
15. silo according to claim 14 is characterized in that, the height of said central post (3) is equal to or greater than the height of said bulkhead (1).
16. silo according to claim 15 is characterized in that, said storehouse back timber (9) with said central post (3) be the center equal angles be arranged between said central post (3) and the bulkhead (1).
CN 201120267104 2011-07-26 2011-07-26 Silo Expired - Lifetime CN202194420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120267104 CN202194420U (en) 2011-07-26 2011-07-26 Silo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120267104 CN202194420U (en) 2011-07-26 2011-07-26 Silo

Publications (1)

Publication Number Publication Date
CN202194420U true CN202194420U (en) 2012-04-18

Family

ID=45949337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120267104 Expired - Lifetime CN202194420U (en) 2011-07-26 2011-07-26 Silo

Country Status (1)

Country Link
CN (1) CN202194420U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359299A (en) * 2011-07-26 2012-02-22 中国神华能源股份有限公司 Silo
CN103758388A (en) * 2013-12-31 2014-04-30 庆达新能科技有限公司 Flat-base multi-conical type silo

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359299A (en) * 2011-07-26 2012-02-22 中国神华能源股份有限公司 Silo
CN102359299B (en) * 2011-07-26 2013-11-06 中国神华能源股份有限公司 Silo
CN103758388A (en) * 2013-12-31 2014-04-30 庆达新能科技有限公司 Flat-base multi-conical type silo

Similar Documents

Publication Publication Date Title
CN102337790B (en) Construction method of silo
CN202170662U (en) Roof of a silo
CN102359299B (en) Silo
CN102364015B (en) Silo
CN102860185A (en) Compound underground grain store with multifunctional passage
US2958983A (en) Concrete storage structure
CN202194420U (en) Silo
CN202273451U (en) Silo
CN101748920B (en) Storied bulk grain warehouse
CN202202603U (en) Central post of cylindrical silo
CN202187592U (en) Silo bottom structure of silo
CN202857356U (en) Compound-type underground granary provided with multifunctional channel
CN103122701B (en) Structure-improved coal storage yard used for thermal power plant
CN201649755U (en) Bulk-grain building bin with hollow column
CN201649761U (en) Combined structural building bin used for bulk grains
CN101696603B (en) Underground granary enclosed by semi cylinder
CN201649754U (en) Bulk grain storied warehouse with connecting beams arranged inside warehouse wall
CN106639452A (en) Lightweight-steel-structure grain storing granary
CN210264105U (en) Corrugated cast-in-place reinforced concrete tank
CN201649759U (en) Heat-insulating multi-storey bulk grain warehouse
CN101586412B (en) Method for dynamically lifting silo body and strengthening vertical rigidity
AU2012289366B2 (en) Silo
CN201053013Y (en) Circular column multi-edge multilayer fermentation tower
CN105350807A (en) Flat-bottom silo
CN210900454U (en) Semi-overhead granary

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120418

Effective date of abandoning: 20131106

RGAV Abandon patent right to avoid regrant