CN202192678U - 两用混凝土抗压试模具 - Google Patents
两用混凝土抗压试模具 Download PDFInfo
- Publication number
- CN202192678U CN202192678U CN2011202531488U CN201120253148U CN202192678U CN 202192678 U CN202192678 U CN 202192678U CN 2011202531488 U CN2011202531488 U CN 2011202531488U CN 201120253148 U CN201120253148 U CN 201120253148U CN 202192678 U CN202192678 U CN 202192678U
- Authority
- CN
- China
- Prior art keywords
- template
- die
- half die
- left half
- installing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本实用新型公开了一种两用混凝土抗压试模具,其特征在于所述试模具由左半模具、右半模具和底板组成,所述左半模具由第一模板和第二模板组成,所述右半模具由第三模板和第四模板组成,所述第一模板和所述第二模板成直角,所述第三模板和所述第四模板成直角,所述左半模具和所述右半模具的侧边分别设有竖槽和与竖槽相适配的凸沿以及安装孔,所述左半模具和所述右半模具靠近下侧边的内壁上设有与所述底板相适配的凹槽。由于所述试模具由左半模具、右模具和底板组成,并使用固定螺栓进行连接,在进行人工脱模时很容易使试件和所述试模具分离,不会造成试件损坏,方便人工脱模和现场使用,提高了试模具使用率。
Description
技术领域
本实用新型涉及一种模具,尤其涉及一种两用混凝土抗压试模具。
背景技术
现用混凝土抗压试模具为整体式,使用气泵脱模是很方便,但是存在下述缺点:首先,必须使用气泵脱模,但是如在没有电的情况下必须人工进行脱模,人工脱模非常麻烦,而且人工脱模容易造成试件缺角,并且容易造成试模具损坏,试件使用率低。其次,现用混凝土抗压试模具在试件制作后要及时脱模,否则很难脱出,有时用气泵也没有办法脱出。
实用新型内容
本实用新型所要解决的技术问题是提供一种既能气泵脱模又能人工脱模且人工脱模方便、不易造成试件损坏的两用混凝土抗压试模具。
为解决上述技术问题,本实用新型所采取的技术方案是:一种两用混凝土抗压试模具,其特征在于所述试模具由左半模具、右半模具和底板组成,所述左半模具由第一模板和第二模板组成,所述右半模具由第三模板和第四模板组成,所述第一模板和所述第二模板成直角,所述第三模板和所述第四模板成直角,所述第一模板的侧边设有第一竖槽且均布有第一安装孔,所述第三模板的侧边设有与所述第一竖槽相适配的第二凸沿和与第一安装孔相对应的第三安装孔,所述第二模板的侧边设有第一凸沿且均布有第二安装孔,所述第四模板的侧边设有与所述第一凸沿相适配的第二竖槽和与第二安装孔相对应的第四安装孔,所述左半模具和所述右半模具靠近下侧边的内壁上设有与所述底板相适配的第一凹槽和第二凹槽。
采用上述技术方案所产生的有益效果在于:由于所述试模具采用左半模具、右模具和底板组成,并使用固定螺栓进行连接,在进行人工脱模时很容易使试件和所述试模具分离,不会造成试件损坏,方便人工脱模和现场使用,提高了试模具使用率。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
图1是本实用新型结构示意图;
图2是本实用新型右半模具结构示意图;
其中:1、第一模板 2、第二模板 3、底板 4、第三模板 5、第四模板 6、第一竖槽 7、第一安装孔 8、第二凸沿 9、第三安装孔 10、第一凸沿 11、第二安装孔 12、第二竖槽 13、第四安装孔 14、第一凹槽 15、第二凹槽 16、加强筋。
具体实施方式
如图1-2所示,一种两用混凝土抗压试模具,其特征在于所述试模具由左半模具、右半模具和底板3组成,所述左半模具由第一模板1和第二模板2组成,所述右半模具由第三模板4和第四模板5组成,所述第一模板1和所述第二模板2成直角,所述第三模板4和所述第四模板5成直角,所述第一模板1的侧边设有第一竖槽6且均布有第一安装孔7,所述第三模板4的侧边设有与所述第一竖槽6相适配的第二凸沿8和与第一安装孔7相对应的第三安装孔9,所述第二模板2的侧边设有第一凸沿10且均布有第二安装孔11,所述第四模板5的侧边设有与所述第一凸沿10相适配的第二竖槽12和与第二安装孔11相对应的第四安装孔13,所述左半模具和所述右半模具靠近下侧边的内壁上设有与所述底板3相适配的第一凹槽14和第二凹槽15,为了增加所述试模具的强度可以在所述试模具的模板的外壁上增加加强筋16。
在使用所述试模具制作混凝土抗压试件时,首先,将所述底板3卡入所述第一凹槽14和所述第二凹槽15中;其次,使用固定螺栓依次穿过所述第四安装孔13和所述第二安装孔11,将所述左半模具和所述右半模具的一个侧边进行紧固连接;最后,使用固定螺栓依次穿过所述第一安装孔7和所述第三安装孔9,将所述左半模具和所述右半模具的另一个侧边进行紧固连接。
在对混凝土试件进行脱模时,可以进行气泵脱模,也可以选择进行人工脱模。在进行人工脱模时,首先将固定螺栓从所述左半模具和所述右半模具的安装孔中取出,轻轻敲动或者晃动所述左半模和右半模具,混凝土试件很容易与所述试模具分离而且不会损坏试件,提高了试模具的使用率。
Claims (2)
1.一种两用混凝土抗压试模具,其特征在于所述试模具由左半模具、右半模具和底板(3)组成,所述左半模具由第一模板(1)和第二模板(2)组成,所述右半模具由第三模板(4)和第四模板(5)组成,所述第一模板(1)和所述第二模板(2)成直角,所述第三模板(4)和所述第四模板(5)成直角,所述第一模板(1)的侧边设有第一竖槽(6)且均布有第一安装孔(7),所述第三模板(4)的侧边设有与所述第一竖槽(6)相适配的第二凸沿(8)和与第一安装孔(7)相对应的第三安装孔(9),所述第二模板(2)的侧边设有第一凸沿(10)且均布有第二安装孔(11),所述第四模板(5)的侧边设有与所述第一凸沿(10)相适配的第二竖槽(12)和与第二安装孔(11)相对应的第四安装孔(13),所述左半模具和所述右半模具靠近下侧边的内壁上设有与所述底板(3)相适配的第一凹槽(14)和第二凹槽(15)。
2.根据权利要求1所述的两用混凝土抗压试模具,所述试模具的模板的外壁上设有加强筋(16)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202531488U CN202192678U (zh) | 2011-07-18 | 2011-07-18 | 两用混凝土抗压试模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202531488U CN202192678U (zh) | 2011-07-18 | 2011-07-18 | 两用混凝土抗压试模具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202192678U true CN202192678U (zh) | 2012-04-18 |
Family
ID=45947608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202531488U Expired - Fee Related CN202192678U (zh) | 2011-07-18 | 2011-07-18 | 两用混凝土抗压试模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202192678U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111571779A (zh) * | 2020-06-05 | 2020-08-25 | 中国路桥工程有限责任公司 | 一种脱模养护一体化模板系统 |
CN113858397A (zh) * | 2020-11-29 | 2021-12-31 | 哈尔滨理工大学 | 易于组装的变尺寸混凝土模具及组装方法 |
-
2011
- 2011-07-18 CN CN2011202531488U patent/CN202192678U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111571779A (zh) * | 2020-06-05 | 2020-08-25 | 中国路桥工程有限责任公司 | 一种脱模养护一体化模板系统 |
CN111571779B (zh) * | 2020-06-05 | 2021-10-19 | 中国路桥工程有限责任公司 | 一种脱模养护一体化模板系统 |
CN113858397A (zh) * | 2020-11-29 | 2021-12-31 | 哈尔滨理工大学 | 易于组装的变尺寸混凝土模具及组装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243906B (zh) | 浇筑剪力墙的支撑装置 | |
CN201895036U (zh) | 一种组合冲模模具 | |
CN204530642U (zh) | 一种暗渠槽预制件 | |
CN202192678U (zh) | 两用混凝土抗压试模具 | |
CN202701011U (zh) | 一种子母结构的一模多孔铝型材挤压分流模具 | |
CN205853051U (zh) | 一种带有磁性隔板的预制混凝土构件生产模具 | |
CN203213581U (zh) | 建筑模板组件 | |
CN204456624U (zh) | 一种木塑墙板 | |
CN206011406U (zh) | 一种无冷热桥墙体板模具 | |
CN204142541U (zh) | 砂浆拉伸粘结强度基底试块成型试模板 | |
CN204382575U (zh) | 一种塑料管件双模具成型机 | |
CN208178372U (zh) | 生产中快速更换试块模具 | |
CN202106491U (zh) | 机车车辆用橡胶波纹管的复合模 | |
CN205497752U (zh) | 一种新型的剪切渗流模具 | |
CN205289955U (zh) | 一种去毛刺工作台 | |
CN203347115U (zh) | 一种子母夹具 | |
CN206952104U (zh) | 水平无箱造型机仿形砂箱板 | |
CN204844712U (zh) | 建筑用硅酮结构密封胶试样制作模具 | |
CN203991937U (zh) | 配有预置排屑槽的对冲式冲模用模具底座 | |
CN204182742U (zh) | 一种弯曲半径可调的波形钢腹板模压模具 | |
CN209920187U (zh) | 预制构件水电出线孔凹槽固定工装 | |
CN202212471U (zh) | 用于蛋糕模上冲凸点的冲模 | |
CN202886160U (zh) | 建筑用防水材料粘结强度测试模具 | |
CN202015765U (zh) | 多功能钢筒整形机 | |
CN204019709U (zh) | 一种混凝土砌块养护模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20161227 Address after: 550025 Guiyang New District, Guizhou, Qishan resettlement points Patentee after: China Railway (Guizhou) Municipal Engineering Co., Ltd. Address before: 050000 Hebei Province, Shijiazhuang city Zhongshan West Village Patentee before: CR17 Bureau No.3 Engineering Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120418 Termination date: 20180718 |