CN202187780U - Trolley device for tunnels - Google Patents

Trolley device for tunnels Download PDF

Info

Publication number
CN202187780U
CN202187780U CN2011202671233U CN201120267123U CN202187780U CN 202187780 U CN202187780 U CN 202187780U CN 2011202671233 U CN2011202671233 U CN 2011202671233U CN 201120267123 U CN201120267123 U CN 201120267123U CN 202187780 U CN202187780 U CN 202187780U
Authority
CN
China
Prior art keywords
wheel carrier
column
trolley
support
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202671233U
Other languages
Chinese (zh)
Inventor
蒋岩峰
尹天军
郑华奇
袁风翔
乔良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI XIANWEI CIVIL ENGINEERING Co Ltd
Original Assignee
SHANGHAI XIANWEI CIVIL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XIANWEI CIVIL ENGINEERING Co Ltd filed Critical SHANGHAI XIANWEI CIVIL ENGINEERING Co Ltd
Priority to CN2011202671233U priority Critical patent/CN202187780U/en
Application granted granted Critical
Publication of CN202187780U publication Critical patent/CN202187780U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a trolley device for tunnels, which comprises a trolley frame and a travelling wheel carrier. The trolley frame comprises an arc frame, a support, vertical columns and an inclined bracket, wherein a plurality of rollers are arranged at the upper part of the arc frame; a rubber waterproof board is arranged on the outer side of the vertical column; the rubber waterproof board is connected with a hoist through a wire rope; the hoist is arranged on the outer side of the other vertical column; a motor, a speed reducer and a wheel are arranged on the travelling wheel carrier; one end of the travelling wheel carrier is connected with a jack; a longitudinal beam is arranged at the upper part of the jack; one end of the longitudinal beam is connected with the vertical columns; and the vertical columns are connected with the travelling wheel carrier through bolts. The trolley device has the benefits that by adopting a trolley to substantially hoist rubber waterproof boards, the hoisting task of a tunnel waterproof project can be rapidly accomplished, not only is the project quality improved, but also the progress of the project is quickened, and the effect of time saving is achieved; and by adopting the motor to drive the trolley, the labor intensity of constructors is reduced, and the trolley device is widely applicable to constructions of railway and highway projects and the like.

Description

The chassis device is used in the tunnel
Technical field
The utility model relates to a kind of construction works and uses chassis, relates in particular to a kind of tunnel and uses the chassis device.
Background technology
At present, in the construction in tunnel, traditional hand operation during lining construction; After lining construction finishes, need on the section in tunnel, lay at twice and not have anti-cloth and splash guard, to reach the purpose of the water seepage in the tunnel that prevents in the rock stratum; Adopt scaffold to construct both at home and abroad mostly, the progress that this a series of form of construction work all is difficult to satisfy the requirement of construction and quickens construction needs lot of manpower and material resources simultaneously; And labour intensity is big, and the lining cutting inefficiency is so the mixed economy interests are low.
In sum, along with the construction of engineerings such as a large amount of construction of tunnel, large bridge, highway needs, a kind of tunnel new, that be fit to the safety that engineering such as tunnel uses specially is imperative with the invention of chassis device.
The utility model content
The purpose of the utility model provides a kind of tunnel and uses the chassis device, overcoming the shortcoming on the prior art, thereby quickens construction speed.
The purpose of the utility model is to realize through following technical scheme:
The chassis device is used in a kind of tunnel, comprises bogie frame and walking wheel carrier, and said bogie frame is made up of arched frame, support, column and material support; The bottom of arched frame is provided with support; The two ends of supporting the bottom are respectively equipped with column, fix through trembling support between support and the column, and the top of said arched frame is provided with some cylinders; The outside of said column is provided with the rubber waterproof plate; The rubber waterproof plate is connected with hoist engine through wire rope, and wire rope connects hoist engine through cylinder, and hoist engine is located at the outside of another column; Said walking wheel carrier is provided with motor, reductor and wheel; Wherein motor is connected with reductor; Reductor is connected with wheel through chain, and an end of said walking wheel carrier is connected with jack, and the top of jack is provided with longeron; One end of longeron is connected with column, and column is connected with the walking wheel carrier through bolt.
The beneficial effect of the utility model is: adopt chassis to carry out significantly hanging of rubber waterproof plate, can the task of hanging of tunnel waterproofing engineering be accomplished fast, both improved workmanship; Quickened programming again; Played the effect of getting twice the result with half the effort, this chassis is except being used to hang splash guard, and other constructions, the lighting circuit that can also be used to do with the top, road are laid and the jenny scaffold use; Advantage with one-object-many-purposes; Use the motor-driven chassis simultaneously, alleviated constructor's labour intensity, in the construction of engineerings such as railway, highway.
Description of drawings:
Combine the description of its accompanying drawing through following embodiment, can further understand and use novel purpose, specific structural features and advantage in fact the utility model.Wherein, accompanying drawing is:
Fig. 1 is that the utility model is described with the structural representation of road with the chassis device;
Fig. 2 is the partial enlarged drawing of walking wheel carrier among Fig. 1.
Among the figure: 1, bogie frame; 2, walking wheel carrier; 3, cylinder; 4, rubber waterproof plate; 5, wire rope; 6, hoist engine; 7, jack; 8, longeron; 9, bolt; 11, arched frame; 12, support; 13, column; 14, tilted supporter; 21, motor; 22, reductor; 23, wheel; 24, chain.
The specific embodiment:
Below in conjunction with the instance among the figure the utility model is done further to describe.
Shown in Fig. 1-2, the chassis device is used in a kind of tunnel, comprises bogie frame 1 and walking wheel carrier 2; Said bogie frame 1 by arched frame 11, support 12, column 13 and tremble support 14 and forms, the bottom of arched frame 11 is provided with support 12, the two ends of supporting 12 bottoms are respectively equipped with column 13; Fixing between support 12 and the column 13 through material support 14; The top of said arched frame 11 is provided with some cylinders 3, and the outside of said column 13 is provided with rubber waterproof plate 4, and rubber waterproof plate 4 is connected with hoist engine 6 through wire rope 5; Wire rope 5 connects hoist engine 6 through cylinder 3, and hoist engine 6 is located at the outside of another column 13; Said walking wheel carrier 2 is provided with motor 21, reductor 22 and wheel 23; Wherein motor 21 is connected with reductor 22; Reductor 22 is connected with wheel 23 through chain 24, and an end of said walking wheel carrier 2 is connected with jack 7, and the top of jack 7 is provided with longeron 8; One end of longeron 8 is connected with column 13, and column 13 is connected with walking wheel carrier 2 through bolt (9).
The utility model embodiment uses the chassis device in described a kind of tunnel; In advance that the folding back of rubber waterproof plate 4 vertical S shapes is folding horizontal S shape in use, the horizontal termination of the rubber waterproof plate 4 that folds is clamped with the clip on the wire rope 5, start hoist engine 6; Wire rope 5 laterally drags arched frame with rubber waterproof plate 4; Ready sling on stable on rubber waterproof plate 4 and the tunnel wall is connected, after having hung from the top toward dichromatism, the mobile trolley used rubber waterproof plate that makes vertically launches one repeatedly again; Go round and begin again and hang, use technique for sticking to make between two blocks of rubber waterproof plates 4 and only closely link to each other.This chassis all around symmetry has four root posts 13; Four groups of walking wheel carriers 2 are arranged; Every group of two wheels 23; On front or rear two groups of walking wheel carriers 2 motor 21 is housed, motor 21 drive turbine and worm reductors 22 are implemented on the rail through chain 24 drive wheels 23 and walk, and this reductor 22 is with the automatic functions of cutting off the power supply.The utility model is widely used in the engineering constructions such as railway, highway.
Those of ordinary skill in the art will be appreciated that; Above embodiment only is the purpose that is used for explaining the utility model; And be not with the qualification of doing the utility model; As long as in the essential scope of the utility model, in the scope to the variation of the above embodiment, claim that modification all will drop on the utility model.

Claims (4)

1. the chassis device is used in a tunnel, and it comprises bogie frame and walking wheel carrier, and said bogie frame is by arched frame, support, column and tremble support and form; The bottom of described arched frame is provided with support, and the two ends of the bottom of support are respectively equipped with column, fixes through trembling support between support and the column.
2. the chassis device is used in tunnel as claimed in claim 1; It is characterized in that: the top of said arched frame is provided with some cylinders; The outside of said column is provided with the rubber waterproof plate; Said rubber waterproof plate is connected with hoist engine through wire rope, and said wire rope connects hoist engine through cylinder, and hoist engine is located at the outside of another column.
3. the chassis device is used in tunnel as claimed in claim 1, it is characterized in that: said walking wheel carrier is provided with motor, reductor and wheel, and wherein motor is connected with reductor, and reductor is connected with wheel through chain.
4. the chassis device is used in tunnel as claimed in claim 1, it is characterized in that: an end of said walking wheel carrier is connected with jack, and the top of jack is provided with longeron, and an end of longeron is connected with column, and column is connected with the walking wheel carrier through bolt.
CN2011202671233U 2011-07-25 2011-07-25 Trolley device for tunnels Expired - Fee Related CN202187780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202671233U CN202187780U (en) 2011-07-25 2011-07-25 Trolley device for tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202671233U CN202187780U (en) 2011-07-25 2011-07-25 Trolley device for tunnels

Publications (1)

Publication Number Publication Date
CN202187780U true CN202187780U (en) 2012-04-11

Family

ID=45919239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202671233U Expired - Fee Related CN202187780U (en) 2011-07-25 2011-07-25 Trolley device for tunnels

Country Status (1)

Country Link
CN (1) CN202187780U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619534A (en) * 2012-04-12 2012-08-01 中国水利水电第十四工程局有限公司 Light mobile steel form carrier
CN106194220A (en) * 2016-08-29 2016-12-07 石家庄铁道大学 Tunnel splash guard installs chassis
CN108590709A (en) * 2018-06-22 2018-09-28 中铁十局集团第工程有限公司 Trackless electric walking lining trolley device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619534A (en) * 2012-04-12 2012-08-01 中国水利水电第十四工程局有限公司 Light mobile steel form carrier
CN106194220A (en) * 2016-08-29 2016-12-07 石家庄铁道大学 Tunnel splash guard installs chassis
CN108590709A (en) * 2018-06-22 2018-09-28 中铁十局集团第工程有限公司 Trackless electric walking lining trolley device
CN108590709B (en) * 2018-06-22 2024-01-30 中铁十一局集团第一工程有限公司 Trackless electric walking lining trolley device

Similar Documents

Publication Publication Date Title
CN205977243U (en) A platform truck for tunnel water proofing board is laid and reinforcement
CN203796297U (en) Temporary supporting device of driving working face
CN201635020U (en) Bridge floor dismantling crane for large and medium concrete bridges
CN202187780U (en) Trolley device for tunnels
CN103758522A (en) Temporary support method of tunneling working face and equipment thereof
CN205908031U (en) A rail mounted lifting device for high -rise building curtain wall construction
CN105178987A (en) Novel tunnel waterproof plate paving and hanging trolley
CN102561200B (en) Pushing device for bridge erecting machine to pass roadbed and method for bridge erecting machine to pass roadbed
CN201746779U (en) Prestressed tension jack moving frame
CN202090925U (en) Automatic suspension trolley for tunnel waterproof plate
CN102587951B (en) Hydraulic U-type steel bracket supporting machine
CN205101008U (en) Multi -functional arc -shaped rack of tunnel construction
CN201372800Y (en) Special trolley used in tunnel
CN102431907B (en) Walking type tunnel carriageway plate crane
CN203048443U (en) Hydraulic motor hoisting beam for monorail crane
CN205036389U (en) Novel tunnel water proofing board is spread and is hung platform truck
CN101824995A (en) Tunnel-dedicated trolley
CN201730625U (en) Concrete lining steel-form trolley traveling straight beam supporting device
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN105863686A (en) Invert formwork hosting traveling trolley
CN110683347A (en) Auxiliary device for laying track of monorail crane
CN203558748U (en) Wheeled crane
CN202768027U (en) Quick heading temporary shoring system matched and used with heading machine
CN206156620U (en) Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction
CN205152805U (en) Portable precast beam stretch -draw protector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Shanghai Xianwei Civil Engineering Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Shanghai Xianwei Civil Engineering Co., Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20160725