CN202175896U - Environment-friendly recycling permeable floor tile - Google Patents

Environment-friendly recycling permeable floor tile Download PDF

Info

Publication number
CN202175896U
CN202175896U CN2011201945965U CN201120194596U CN202175896U CN 202175896 U CN202175896 U CN 202175896U CN 2011201945965 U CN2011201945965 U CN 2011201945965U CN 201120194596 U CN201120194596 U CN 201120194596U CN 202175896 U CN202175896 U CN 202175896U
Authority
CN
China
Prior art keywords
floor tile
cement slurry
permeable
aggregate
permeable floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201945965U
Other languages
Chinese (zh)
Inventor
刘骥
桂祖华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINNING RUIDA NEW BUILDING MATERIAL CO Ltd
Original Assignee
JINNING RUIDA NEW BUILDING MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINNING RUIDA NEW BUILDING MATERIAL CO Ltd filed Critical JINNING RUIDA NEW BUILDING MATERIAL CO Ltd
Priority to CN2011201945965U priority Critical patent/CN202175896U/en
Application granted granted Critical
Publication of CN202175896U publication Critical patent/CN202175896U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides an environment-friendly recycling permeable floor tile, which is in a brick structure and consists of a face layer and a bottom layer which are bonded in adhesive mode by pressing. The face layer is formed by cement slurry and fine phosphor slag aggregate wrapped in the cement slurry. The bottom layer is formed by cement slurry, thick phosphor slag aggregate, coal ash and stone aggregate, wherein the thick phosphor slag aggregate, the coal ash and the stone aggregate are wrapped in the cement slurry. The permeable floor tile effectively resolves the problem that existing hardened floor is not permeable to rain and affects the traffic and the like. Average value of compression strength of the permeable floor tile is equal to or larger than 30.0 MPa, breaking strength ranges from 13000N to 25244N, and permeability coefficient is 0.03cm/s.

Description

The environmental protection and waste utilization pervious floor tile
Technical field
The utility model belongs to building material technical field, particularly a kind of pervious floor tile.
Background technology
Hardened ground is all adopted in existing urban street, and the environmental hazard that this hardened ground causes has:
Hardened ground can not penetrating rainwater, and rainwater is blocked phreatic replenishing fully when making rainfall, is relying on the city of underground water as the drinking water source, can make the groundwater table of decline be difficult to go up;
Hardened ground makes rainwater deposit on ground, and rainwater focuses on the motor vehicle and cycleway of road both sides in a large number, and this can cause traffic jam on the one hand, increases the weight of automotive emission and pollutes, and can dissolve in a large amount of urban pollutants when rainwater flows on the other hand;
Form the puddle on ground when hardened ground rains heavily summer, usually can there be several days in these puddles, greatly influence municipal sanitary, and the breeding of mosquito provides good place because these puddles are summer;
The ground of sclerosis can not drink up the rain, and when raining heavyly, rainwater row is logical freely will not to form water out behavior in the streets and lanes in city, and perhaps rainwater flows to the river course on limit, city rapidly, and the river water level is increased rapidly, and the floods problem takes place on the limit, city;
Hardened ground makes rainwater run off from ground or is fallen by solar evaporation, makes the city become dry water-deficient area, the face of land; Such city raised dust pollution can increase the weight of; And bring very big difficulty to afforestation of city because of the face of land is dry;
Hardened ground absorbs, stores and reflect the heat of the sun, and the ground average temperature is raise the several years; This can increase the city sweltering heat in summer, reduces townie comfort, increases the energy consumption of paying for cooling in the urban life simultaneously;
Hardened ground in the winter time the time temperature low, after the snowfall, ground freezes easily, and people's trip is brought multiple inconvenience even danger; And ice-cold hardened ground is unfavorable for the thawing of urban ground snowfall, thereby sweeps away snow to municipal administration and to increase burden, and also can't make full use of snow-broth and replenish urban groundwater.
The utility model content
The utility model provides a kind of environmental protection and waste utilization pervious floor tile, and its embodiment is following:
A kind of environmental protection and waste utilization pervious floor tile is the brick-shaped structure, and the surface layer and the bottom that are bonded together by compacting constitute;
Compressive strength average>=the 30.0MPa of above-mentioned permeable brick, rupture strength are that 13000N~25244N, coefficient of permeability are 0.03cm/s, satisfy JC/T945-2005<permeable brick>standard-required.
The length of above-mentioned environmental protection and waste utilization pervious floor tile is respectively 200mm, 100mm, 60mm, perhaps is respectively 250mm, 250mm, 60mm, perhaps is respectively 500mm, 250mm, 60mm.
This pervious floor tile that the utility model provides efficiently solves existing hardened ground can not penetrating rainwater, influence problem such as traffic, and the production method of above-mentioned environmental protection and waste utilization pervious floor tile is following:
(1) preparation of raw material:
Get following materials of weight proportions earlier: thick phosphorus slag 52%, cement 14%, flyash 4%, stone 30%, wherein, said thick phosphorus slag is meant the phosphorus slag of particle size range between 3 millimeters to 8 millimeters; Is that 23%~25% weight portion proportioning adds to mix behind the water and stirred 600 seconds with above-mentioned raw materials according to water/binder ratio, promptly gets the bottom compound; Then the bottom compound is poured in the die cavity of block machine;
Get following materials of weight proportions then: thin phosphorus slag 80%, cement 20%, wherein, said thin phosphorus slag is meant the phosphorus slag of particle size range between 1 millimeter to 2 millimeters; Is that 23%~25% weight portion proportioning adds to mix behind the water and stirred 1000 seconds with above-mentioned raw materials according to water/binder ratio, promptly gets the surface layer compound; Then the surface layer compound is poured on the bottom compound in the die cavity of above-mentioned block machine;
(2) moulding:
Earlier surface layer compound in the die cavity of block machine and bottom compound are vibrated 20 seconds, vibration frequency is 2900 hertz to 4800 hertz, and exciting force is 90,000 Ns of 50,000 wild marjorams; Under the condition that continues vibration, surface layer compound in the die cavity and bottom compound are imposed on 21MPa pressure then, suppress and promptly make the pervious floor tile base substrate after 13 seconds;
(3) maintenance:
After the pervious floor tile base substrate deviate from from the die cavity of block machine, maintenance 24 hours, the moisture content that makes the pervious floor tile base substrate promptly makes pervious floor tile below 20%.
Compressive strength average>=the 30.0MPa of the permeable brick that said method is produced, rupture strength are that 13000N~25244N, coefficient of permeability are 0.03cm/s, satisfy JC/T945-2005<permeable brick>standard-required.
Block machine in the aforementioned production method is Quanzhou, the Fujian different mountain plant equipment QFT10-15 of Co., Ltd block machine, is used to produce various wall body bricks, pavior brick, curb, bank protection, grassland brick, square, track, harbour brick, and its mechanical parameter is following:
Pallet size: 1100 * 950 * 30mm;
Three kinds of specifications are arranged: 200 * 100 * 60mm Dutch brick; 250 * 250 * 60mm; 500 * 250 * 60mm;
Molding cycle: 25s;
Productivity ratio: 62m 3/ day;
Vibration frequency: 2900~4800;
Exciting force: 50~90KN;
Main engine power: 31kW;
Rated operating pressure: 21MPa;
Maximum appearance and size: 7680 * 2100 * 3090mm;
Complete machine quality: 15.8T.
Description of drawings
Fig. 1 is the sectional view of the utility model environmental protection and waste utilization pervious floor tile.
The specific embodiment
Environmental protection and waste utilization pervious floor tile as shown in Figure 1 is the brick-shaped structure, and the surface layer 1 that is bonded together by compacting constitutes with bottom 2;
Said surface layer 1 is the fines layer, is made up of cement paste 4 and the thin phosphorus slag aggregate 3 that is wrapped in the cement paste 4;
Said bottom 2 is the coarse fodder layer, is made up of cement paste 4 and the thick phosphorus slag aggregate 7, flyash 5, the stone aggregate 6 that are wrapped in the cement paste 4.

Claims (3)

1. an environmental protection and waste utilization pervious floor tile is the brick-shaped structure, it is characterized in that: the surface layer (1) and the bottom (2) that are bonded together by compacting constitute; The length of said environmental protection and waste utilization pervious floor tile is respectively 200 mm, 100 mm, 60mm.
2. environmental protection and waste utilization pervious floor tile according to claim 1 is characterized in that: the length of said environmental protection and waste utilization pervious floor tile is respectively 250 mm, 250 mm, 60mm.
3. environmental protection and waste utilization pervious floor tile according to claim 1 is characterized in that: the length of said environmental protection and waste utilization pervious floor tile is respectively 500mm, 250mm, 60mm.
CN2011201945965U 2011-06-10 2011-06-10 Environment-friendly recycling permeable floor tile Expired - Fee Related CN202175896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201945965U CN202175896U (en) 2011-06-10 2011-06-10 Environment-friendly recycling permeable floor tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201945965U CN202175896U (en) 2011-06-10 2011-06-10 Environment-friendly recycling permeable floor tile

Publications (1)

Publication Number Publication Date
CN202175896U true CN202175896U (en) 2012-03-28

Family

ID=45865784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201945965U Expired - Fee Related CN202175896U (en) 2011-06-10 2011-06-10 Environment-friendly recycling permeable floor tile

Country Status (1)

Country Link
CN (1) CN202175896U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541288A (en) * 2013-09-29 2014-01-29 机械工业第三设计研究院 High-performance environment-friendly permeable brick and production method thereof
CN106045399A (en) * 2016-06-02 2016-10-26 北京建筑材料科学研究总院有限公司 Water permeable brick and preparation method thereof
CN106866031A (en) * 2017-03-15 2017-06-20 江苏维科海绵城市科技有限公司 A kind of composite water permeable brick
CN110183168A (en) * 2019-05-05 2019-08-30 贵州开磷磷石膏综合利用有限公司 A kind of Phosphorus Slag water-permeable brick and preparation method thereof
CN110922136A (en) * 2019-12-13 2020-03-27 福州大学 Water permeable brick prepared from dredged mud and preparation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541288A (en) * 2013-09-29 2014-01-29 机械工业第三设计研究院 High-performance environment-friendly permeable brick and production method thereof
CN106045399A (en) * 2016-06-02 2016-10-26 北京建筑材料科学研究总院有限公司 Water permeable brick and preparation method thereof
CN106045399B (en) * 2016-06-02 2018-05-04 北京建筑材料科学研究总院有限公司 A kind of water-permeable brick and preparation method thereof
CN106866031A (en) * 2017-03-15 2017-06-20 江苏维科海绵城市科技有限公司 A kind of composite water permeable brick
CN110183168A (en) * 2019-05-05 2019-08-30 贵州开磷磷石膏综合利用有限公司 A kind of Phosphorus Slag water-permeable brick and preparation method thereof
CN110922136A (en) * 2019-12-13 2020-03-27 福州大学 Water permeable brick prepared from dredged mud and preparation method thereof
CN110922136B (en) * 2019-12-13 2021-06-01 福州大学 Water permeable brick prepared from dredged mud and preparation method thereof

Similar Documents

Publication Publication Date Title
CN202031001U (en) Compound water-permeable road structure
CN102061652B (en) Ecological slag permeable bricks and preparation method thereof
CN202175896U (en) Environment-friendly recycling permeable floor tile
CN101973726B (en) Porous pavement partially taking steel slag as coarse aggregate
CN104276800B (en) A kind of manufacture method of drainage brick
CN103290753A (en) Nano-composite environment-friendly water permeable brick and production method thereof
CN107032670B (en) Composite water permeable brick with natural luster on surface and production method thereof
CN103553471B (en) Method for manufacturing water permeable brick from waste concrete, and pavement method of water permeable brick
CN105967753B (en) A method of freeze thawing resistance ground water-permeable brick is produced using golden antimony tailing
CN106242430B (en) A kind of permeable, moisture retention concrete pavior brick preparation method
CN108532407B (en) Anti-blocking quick-permeation water brick and method for selecting particle size of aggregate in anti-blocking surface layer
CN111501474B (en) Exposed aggregate ceramsite permeable concrete road structure based on solid waste recycling
CN104763017B (en) Ground permeating rainwater recovery system utilizing building waste materials and construction method of ground permeating rainwater recovery system
CN102249616B (en) Method for producing porous floor tile by using industrial by-product phosphorous slag
CN201620327U (en) Anti-block pervious concrete road surface brick
CN106677003A (en) Pervious concrete structure and preparation method thereof
CN204898456U (en) Asphalt pavement containing rubber asphalt stress absorbing layer
CN111041929A (en) Light-emitting pervious concrete road based on recycled aggregate and construction method thereof
CN201411615Y (en) City road water-permeable floor tile
CN103121830B (en) Ecological floor tile and manufacturing method thereof
CN109577130A (en) A kind of porous pavement of quaternity and preparation method thereof
CN101428990A (en) Novel water permeable brick
CN107419632A (en) A kind of water storage type grass-planting brick
CN1626472A (en) Environmental protection color pavement bricks
KR101183187B1 (en) Combined paving method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120328