CN202175518U - Attached type light derrick - Google Patents

Attached type light derrick Download PDF

Info

Publication number
CN202175518U
CN202175518U CN2011201755778U CN201120175577U CN202175518U CN 202175518 U CN202175518 U CN 202175518U CN 2011201755778 U CN2011201755778 U CN 2011201755778U CN 201120175577 U CN201120175577 U CN 201120175577U CN 202175518 U CN202175518 U CN 202175518U
Authority
CN
China
Prior art keywords
pole
pulley
derrick
arm
pulley wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201755778U
Other languages
Chinese (zh)
Inventor
张弓
吴尧成
孙伟军
刘金富
方孔承
王卫刚
龚飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG FUDA ENGINEERING CONSTRUCTION Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Original Assignee
ZHEJIANG FUDA ENGINEERING CONSTRUCTION Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG FUDA ENGINEERING CONSTRUCTION Co Ltd, Zhejiang Electric Power Transmission and Transforming Engineering Co filed Critical ZHEJIANG FUDA ENGINEERING CONSTRUCTION Co Ltd
Priority to CN2011201755778U priority Critical patent/CN202175518U/en
Application granted granted Critical
Publication of CN202175518U publication Critical patent/CN202175518U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

An attached type light derrick comprises a derrick body. A balance arm is installed on one side at the upper end of the derrick body, a suspension arm is installed on the other side at the upper end of the derrick body, a first pulley wheel is installed on the balance arm, and a second pulley wheel is installed on the suspension arm. A first steel wire rope on a first pulley sequentially penetrates through the first pulley wheel and the second pulley wheel, and the tail end of the first steel wire rope is connected with a headframe to be hoisted. A lifting ring is installed at the lower portion of the derrick body, a first hoop is installed on the derrick body at the lower portion of the lifting ring, two second hoops are installed on the derrick body at the upper portion of the lifting ring, and the two second hoops are in loose fit with a steel pipe of the headframe. A third pulley wheel is installed at the upper end of the headframe, a second steel wire rope on a second pulley penetrates through the third pulley wheel, and the tail end of the second steel wire rope is connected with the lifting ring. The attached type light derrick reduces weight and is convenient to use.

Description

The light-duty pole of adhesion type
Technical field
The utility model belongs to lifting device, especially a kind of pole.
Background technology
Lift many columns and cross over to set up in the meter and can adopt pole usually, in order to guarantee the support strength of pole, can truss structure, the technological deficiency of existence be set in the pole upper end usually: weight is big, it is inconvenient to use.
Summary of the invention
Big for the weight that overcomes existing pole, use inconvenient deficiency, the utility model that a kind of expendable weight, the light-duty pole of adhesion type easy to use are provided.
The utility model solves the technical scheme that its technical matters adopted:
The light-duty pole of a kind of adhesion type comprises pole, and upper end one side of said pole is installed equilibrium arm; The upper end opposite side of said pole is installed arm, and first pulley is installed on the said equilibrium arm, and second pulley is installed on the said arm; First supratrochlear first steel rope passes said first pulley and second pulley successively, and the end of said first steel rope is connected with derrick to be lifted, and enhancing ring is installed in said pole bottom; First anchor ear is installed on the pole of the bottom of said enhancing ring; Two second anchor ears are installed on the pole on the top of said enhancing ring, and said two second anchor ears and said pole are easy fit, and the 3rd pulley is installed in the upper end of derrick; Said the 3rd pulley of second supratrochlear second steel wire penetrating, the end of said second steel rope is connected with said enhancing ring.
Further, said derrick installation is installed the 4th pulley on the said base on base, and said second steel rope passes said the 4th pulley and the 3rd pulley successively.
The beneficial effect of the utility model mainly shows: expendable weight, easy to use.
Description of drawings
Fig. 1 is the lifting view of the light-duty pole of adhesion type.
Fig. 2 is the arrangement plan of the light-duty pole of adhesion type.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
See figures.1.and.2, the light-duty pole of a kind of adhesion type comprises pole 1; Upper end one side of said pole 1 is installed equilibrium arm, and the upper end opposite side of said pole 1 is installed arm, and first pulley is installed on the said equilibrium arm; Second pulley is installed on the said arm, and first steel rope on first coaster 2 passes said first pulley and second pulley successively, and the end of said first steel rope is connected with derrick to be lifted; Enhancing ring 3 is installed in said pole 1 bottom, and first anchor ear is installed on the pole of the bottom of said enhancing ring 3, and two second anchor ears are installed on the pole on the top of said enhancing ring 3; Said two second anchor ears and pole are easy fit; The 3rd pulley is installed in the upper end of derrick, said the 3rd pulley of second steel wire penetrating on second coaster 4, and the end of said second steel rope is connected with said enhancing ring.
Said derrick installation is installed the 4th pulley on the said base 5 on base 5, said second steel rope passes said the 4th pulley and the 3rd pulley successively.
In the present embodiment, the top does not have backguy, 7 meters of height overalls, and 80 kilograms of total weightes, 260 kilograms of rated loads are done the effect of lifting derrick; Pole rises to and clamps two anchor ears when pole lower end enhancing ring ring is run into first anchor ear respectively, and pole is done the effect of second samsara lifting derrick, and the operation handlebar derrick lifts certain altitude successively, sheds pole, and derrick is just established completion.
Hang first coaster (3t coaster, i.e. winch) in pole 1 upper end, first lattice and the about 1.4m of second lattice place in the pole upper end; Connect with 2 second anchor ears respectively; The fastening bolt of second anchor ear and pole master material should be fastening, and anchor ear contacts with steel pipe and is easy fit, connects enhancing ring with ∮ 11 steel ropes then and slowly promotes; Rise to be higher than the about 5m in pole upper end after; First anchor ear is installed, and first anchor ear should withstand the diagonal brace of the 3rd lattice below the pole upper end, the unified at last anchor ear bolt of tightening below enhancing ring.
The light-duty pole of second lift, first coaster (3t coaster, i.e. winch) suspension, the second joint pole upper end; At pole first lattice and the about 1.4m of second lattice place topmost; Assemble 2 anchor ears respectively, matching requirements are identical, then with ∮ 11 steel ropes connect enhancing ring and the tension after; Ease out 3 anchor ear bolts of hypomere, the lifting order is identical with last time.
Light-duty pole unloading process: at second coaster (3t coaster; Be winch) the suspension second joint pole upper end, after connecting enhancing ring and strain with ∮ 11 steel ropes, ease out 3 anchor ear bolts of hypomere; 2 anchor ears of first lattice and second lattice topmost contact with steel pipe and are easy fit; The anchor ear of the 3rd lattice is pine entirely, slowly puts down then, under light-duty pole, in the process of landing, has two anchor ears to contact with steel pipe all the time.
In the present embodiment, the column section is 500 * 500, and the design maximum height is 43 meters; By every joint 500 * 500 * 4300 totally 10 joints assemble, every joint weight 166k, assembling need to adopt the light-duty pole of adhesion type to lift; The lifting program is; Pole is attached on the column, column lifting one joint, and pole is along with the desired height that is elevated to next joint of lifting.
The holding pole technology characteristic of present embodiment: 1, pole overall height 7m, the cross section is ∮ 102 * 5mm; 2, the maximum drift angle of lifting by crane is 10 degree, and tricing line angle over the ground is not more than 45 degree; 3, be not more than under the condition of 5m in drift, allowing lift heavy is 166 kilograms; 4, mechanical test is undertaken by specified lifting 166kg * 1.25 times; 5, excess load test is undertaken by specified lifting 166kg * 1.5 times, and pole has good stability.

Claims (2)

1. the light-duty pole of adhesion type comprises pole, it is characterized in that: upper end one side of said pole is installed equilibrium arm; The upper end opposite side of said pole is installed arm, and first pulley is installed on the said equilibrium arm, and second pulley is installed on the said arm; First supratrochlear first steel rope passes said first pulley and second pulley successively, and the end of said first steel rope is connected with derrick to be lifted, and enhancing ring is installed in said pole bottom; First anchor ear is installed on the pole of the bottom of said enhancing ring; Two second anchor ears are installed on the pole on the top of said enhancing ring, and said two second anchor ears and pole are easy fit, and the 3rd pulley is installed in the upper end of derrick; Said the 3rd pulley of second supratrochlear second steel wire penetrating, the end of said second steel rope is connected with said enhancing ring.
2. the light-duty pole of adhesion type as claimed in claim 1 is characterized in that: said derrick installation is installed the 4th pulley on the said base on base, said second steel rope passes said the 4th pulley and the 3rd pulley successively.
CN2011201755778U 2011-05-27 2011-05-27 Attached type light derrick Expired - Fee Related CN202175518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201755778U CN202175518U (en) 2011-05-27 2011-05-27 Attached type light derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201755778U CN202175518U (en) 2011-05-27 2011-05-27 Attached type light derrick

Publications (1)

Publication Number Publication Date
CN202175518U true CN202175518U (en) 2012-03-28

Family

ID=45865413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201755778U Expired - Fee Related CN202175518U (en) 2011-05-27 2011-05-27 Attached type light derrick

Country Status (1)

Country Link
CN (1) CN202175518U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102910532A (en) * 2012-05-23 2013-02-06 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN105858510A (en) * 2015-01-22 2016-08-17 吴江市明港预应力桥梁构件厂 Hoisting equipment for bridge construction
CN109138581A (en) * 2018-08-15 2019-01-04 江苏省送变电有限公司 A kind of big section lattice steel tube holding pole formal dress method for improving
CN109252733A (en) * 2018-10-26 2019-01-22 中国葛洲坝集团电力有限责任公司 Adhesion type is from climbing pole lifting system
CN110054097A (en) * 2019-03-20 2019-07-26 湖南双达机电有限责任公司 The synchronous telescoping mechanism of lorry-mounted crane
CN110817697A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Servo motor control and protection circuit of combined electric holding pole
CN110817692A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Combined electric holding pole for erecting power transmission tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102910532A (en) * 2012-05-23 2013-02-06 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN102910532B (en) * 2012-05-23 2014-08-13 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN105858510A (en) * 2015-01-22 2016-08-17 吴江市明港预应力桥梁构件厂 Hoisting equipment for bridge construction
CN109138581A (en) * 2018-08-15 2019-01-04 江苏省送变电有限公司 A kind of big section lattice steel tube holding pole formal dress method for improving
CN109138581B (en) * 2018-08-15 2020-06-09 江苏省送变电有限公司 Normal installation lifting method for large-section lattice type steel pipe holding pole
CN109252733A (en) * 2018-10-26 2019-01-22 中国葛洲坝集团电力有限责任公司 Adhesion type is from climbing pole lifting system
CN110054097A (en) * 2019-03-20 2019-07-26 湖南双达机电有限责任公司 The synchronous telescoping mechanism of lorry-mounted crane
CN110817697A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Servo motor control and protection circuit of combined electric holding pole
CN110817692A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Combined electric holding pole for erecting power transmission tower

Similar Documents

Publication Publication Date Title
CN202175518U (en) Attached type light derrick
CN205204612U (en) Heavy tower segment lifts by crane turnover device
CN102674136A (en) Lifting method for large-scale tower equipment
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN102351129B (en) Super-lifting device for improving lifting performance of crane and crane
CN102910532A (en) Method for butting and hoisting large box type derricks in air
CN203513079U (en) Multi-segment lifting device for large tower device
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN206665952U (en) A kind of novel hanging tool
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN204265218U (en) A kind of power station unit internal head cover special hanger
CN202519621U (en) Steel hoop used for suspending support system
CN202625662U (en) Self-balancing amplitude modulation hold pole
CN204689351U (en) A kind of H profile steel structural elements suspender
CN202575762U (en) Electric lifting rod for construction elevator
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN202348255U (en) Frame-type calibration device of double-attitude induction logging instrument
CN201236098Y (en) Combined pressure bar sling
CN201882809U (en) Door type cantilever steel frame hoisting equipment used for high hoisting
CN204643648U (en) Pylon and hanging basket thereof
CN204825670U (en) Inclined to one side hanging beam frame device is prevented turning round by eccentric case roof beam
CN2401647Y (en) Prestressed iron tower for power transmission
CN202466428U (en) Hoisting structure for hoisting prefabricated box girder segment
CN203707659U (en) Rapid installation suspender for distribution grid cross arms
CN209131948U (en) A kind of low level reaction frame vertical stability test device for multifunctional

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120328

Termination date: 20130527