CN202172274U - Power grid maintenance management device - Google Patents

Power grid maintenance management device Download PDF

Info

Publication number
CN202172274U
CN202172274U CN2011203020511U CN201120302051U CN202172274U CN 202172274 U CN202172274 U CN 202172274U CN 2011203020511 U CN2011203020511 U CN 2011203020511U CN 201120302051 U CN201120302051 U CN 201120302051U CN 202172274 U CN202172274 U CN 202172274U
Authority
CN
China
Prior art keywords
module
maintenance
maintenance flow
power grid
data memory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203020511U
Other languages
Chinese (zh)
Inventor
李敏
许梅
王亨桂
王龙箭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
SICHUAN ELECTRIC POWER CO Ltd GUANGAN ELECTRIC POWER BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ELECTRIC POWER CO Ltd GUANGAN ELECTRIC POWER BUREAU filed Critical SICHUAN ELECTRIC POWER CO Ltd GUANGAN ELECTRIC POWER BUREAU
Priority to CN2011203020511U priority Critical patent/CN202172274U/en
Application granted granted Critical
Publication of CN202172274U publication Critical patent/CN202172274U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Control By Computers (AREA)

Abstract

The utility model discloses a power grid maintenance management device, comprising a workflow engine module, a maintenance flow modeling module, a maintenance flow model data storage module, a maintenance flow monitoring module, a task data storage module and an interface module; wherein, the input end of the workflow engine module is connected with the output end of the maintenance flow model data storage module, and the output end is connected with the maintenance flow monitoring module and the task data storage module separately; the input end of the maintenance flow modeling module is connected with the interface module and the output end is connected with the input end of the maintenance flow mold data storage module, and the input end of the interface module is connected with a client terminal. By using the power grid maintenance management device of the utility model, the problem is solved effectively that there has not existed a special device of carrying out network informatization control on the power grid maintenance flow, and the power grid maintenance management device is suitable for carrying out network informatization control on the power grid maintenance flow.

Description

A kind of electrical network overhaul management device
Technical field
The utility model relates to a kind of electrical network maintenance flow process control technology, specifically is a kind of electrical network overhaul management device.
Background technology
Along with the high speed development of electrical network, grid structure is more and more numerous and diverse, and power equipment is complicated day by day, and electrical network maintenance flow process is also more and more complicated.At present, mainly rely on artificial the completion to the control of electrical network maintenance flow process, this kind flow process control technology ubiquity coverage rate is little, information processing is dumb does not concentrate and the problem of inefficiency.And along with the development of software information technology, computer hardware, electronic device informationization, electrical network maintenance flow process is carried out network information control become trend.Based on this, be necessary to invent a kind of special device that carries out network information control to electrical network maintenance flow process.Yet do not have a kind of like this device at present.
Summary of the invention
The utility model does not still have a kind of special problem that electrical network maintenance flow process is carried out the device of network information control that is directed against at present in order to solve, and a kind of electrical network overhaul management device is provided.
The utility model is to adopt following technical scheme to realize: a kind of electrical network overhaul management device comprises workflow engine module, maintenance flow process MBM, maintenance procedural model data memory module, maintenance flow monitoring module, task data memory module and interface module; Wherein the input of workflow engine module links to each other with the output of maintenance procedural model data memory module, and the output of workflow engine module is connected with maintenance flow monitoring module and task data memory module respectively; The input of maintenance flow process MBM is connected with interface module, and the output of maintenance flow process MBM links to each other with the input of maintenance procedural model data memory module; The input of interface module is connected with client.Said workflow engine module, maintenance flow process MBM, maintenance procedural model data memory module, maintenance flow monitoring module, task data memory module, interface module, client are existing known configurations.
During work; Overhaul flow data through client, interface module to the transmission of maintenance flow process MBM successively earlier; Set up maintenance procedural model data by maintenance flow process MBM then; The maintenance procedural model transfer of data of being set up is stored to overhauling the procedural model data memory module; Transfer to the workflow engine module through maintenance procedural model data memory module simultaneously, carry out task by the workflow engine module to maintenance procedural model data and generate, the task data that is generated transfers to the task data memory module and stores and export.Can monitor in real time the task generative process of workflow engine module through maintenance flow monitoring module.Pass through said process; The described electrical network overhaul management of the utility model device can be realized electrical network maintenance flow process is carried out network information control; Compare with existing electrical network maintenance flow process control technology, network information control has series of advantages such as broad covered area, information processing are concentrated flexibly, efficient height.
The utility model is simple in structure, reasonable in design, and efficiently solving does not still have a kind of special problem that electrical network maintenance flow process is carried out the device of network information control that is directed against at present, is applicable to electrical network maintenance flow process is carried out network information control.
Description of drawings
Accompanying drawing is the structural representation of the utility model.
Among the figure: 1-workflow engine module, 2-maintenance flow process MBM, 3-maintenance procedural model data memory module, 4-maintenance flow monitoring module, 5-task data memory module, 6-interface module, 7-client.
Embodiment
For the purpose, technical scheme and the advantage that make the utility model is clearer,, the utility model is done further explain below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
Shown in accompanying drawing, the utility model comprises workflow engine module 1, maintenance flow process MBM 2, maintenance procedural model data memory module 3, maintenance flow monitoring module 4, task data memory module 5 and interface module 6; Wherein the input of workflow engine module 1 links to each other with the output of maintenance procedural model data memory module 3, and the output of workflow engine module 1 is connected with maintenance flow monitoring module 4 and task data memory module 5 respectively; The input of maintenance flow process MBM 2 is connected with interface module 6, and the output of maintenance flow process MBM 2 links to each other with the input of maintenance procedural model data memory module 3; The input of interface module 6 is connected with client 7.

Claims (1)

1. electrical network overhaul management device; It is characterized in that: comprise workflow engine module (1), maintenance flow process MBM (2), maintenance procedural model data memory module (3), maintenance flow monitoring module (4), task data memory module (5) and interface module (6); Wherein the input of workflow engine module (1) links to each other with the output of maintenance procedural model data memory module (3), and the output of workflow engine module (1) is connected with maintenance flow monitoring module (4) and task data memory module (5) respectively; The input of maintenance flow process MBM (2) is connected with interface module (6), and the output of maintenance flow process MBM (2) links to each other with the input of maintenance procedural model data memory module (3); The input of interface module (6) is connected with client (7).
CN2011203020511U 2011-08-18 2011-08-18 Power grid maintenance management device Expired - Lifetime CN202172274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203020511U CN202172274U (en) 2011-08-18 2011-08-18 Power grid maintenance management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203020511U CN202172274U (en) 2011-08-18 2011-08-18 Power grid maintenance management device

Publications (1)

Publication Number Publication Date
CN202172274U true CN202172274U (en) 2012-03-21

Family

ID=45830460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203020511U Expired - Lifetime CN202172274U (en) 2011-08-18 2011-08-18 Power grid maintenance management device

Country Status (1)

Country Link
CN (1) CN202172274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105375374A (en) * 2015-12-17 2016-03-02 贵州南源电力科技股份有限公司 Intelligent toolset for transformer station unkeep and usage method for the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105375374A (en) * 2015-12-17 2016-03-02 贵州南源电力科技股份有限公司 Intelligent toolset for transformer station unkeep and usage method for the same

Similar Documents

Publication Publication Date Title
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN203941434U (en) Tricot machine Wireless remote control and early warning system
EP2575285A3 (en) Maritime data centre and working method
CN103413182A (en) Monthly electricity generation and transmission integrated maintenance optimization method based on induced function
CN102222981A (en) Wind power converter monitoring system and wind power generation system
CN202205065U (en) Acquisition and monitoring integrated system for output parameters of electric welding machines
CN202172274U (en) Power grid maintenance management device
CN203745808U (en) Power system hybrid real-time simulation platform
CN203239484U (en) Industrial circulating water electrical power generating system
CN202772610U (en) Monitoring system for battery management systems of electric vehicles
CN204904426U (en) Individual power generation system based on identity recognition technology
CN102437526A (en) Rapid repairing and integral dispatching system of power grid
CN204996987U (en) Computer control network system of hydraulic forging press group based on field bus
CN204231294U (en) A kind of remote monitoring device of solar power system
CN204013324U (en) For the interface adaptive device of servo-driver
CN205692209U (en) A kind of dispatching of power netwoks information processor
CN202472382U (en) A data communication device
CN203552518U (en) Simulation device for electronic mutual inductor
CN204946102U (en) A kind of pretreatment unit of power transmission and transformation equipment state overhauling basic data
CN203278870U (en) Miner lamp charging cabinet communication system employing wired and wireless data connection
CN202548833U (en) High-speed transmission controllable management serial protocol PCIE (peripheral component interface express) bus
CN203084520U (en) Communication apparatus of locomotive general information transmission equipment
CN105577467A (en) Real-time data interruption rate statistical method
CN202406145U (en) Shield programmable logic controller (PLC) remote debugging system based on virtual private network
CN203910002U (en) Power information acquisition system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20140228

C56 Change in the name or address of the patentee

Owner name: GUANG'AN POWER SUPPLY COMPANY, STATE GRID SICHUAN

Free format text: FORMER NAME: GUANG'AN ELECTRIC POWER BUREAU OF SICHUAN ELECTRIC POWER CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 199 No. 638000 Guang'an city of Sichuan Province, Jinan Avenue

Patentee after: GUANG'AN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.,Ltd.

Address before: 199 No. 638000 Guang'an city of Sichuan Province, Jinan Avenue

Patentee before: Sichuan Electric Power Co.,Ltd. Guangan Electric Power Bureau

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20140228

Address after: 199 No. 638000 Guang'an city of Sichuan Province, Jinan Avenue

Patentee after: GUANG'AN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.,Ltd.

Patentee after: State Grid Corporation of China

Address before: 199 No. 638000 Guang'an city of Sichuan Province, Jinan Avenue

Patentee before: GUANG'AN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20120321

CX01 Expiry of patent term