CN202166295U CN2011202278615U CN201120227861U CN202166295U CN 202166295 U CN202166295 U CN 202166295U CN 2011202278615 U CN2011202278615 U CN 2011202278615U CN 201120227861 U CN201120227861 U CN 201120227861U CN 202166295 U CN202166295 U CN 202166295U
Authority
CN
China
Prior art keywords
air
cooling chamber
barn
temperature
winter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202278615U
Other languages
Chinese (zh)
Inventor
曹晓根
薛杰
姚瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Wall Motor Co Ltd
Original Assignee
Great Wall Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Motor Co Ltd filed Critical Great Wall Motor Co Ltd
Priority to CN2011202278615U priority Critical patent/CN202166295U/en
Application granted granted Critical
Publication of CN202166295U publication Critical patent/CN202166295U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model relates to a technical field of drying and processing of workpieces, in particular to a winter and summer dual-purpose heating barn. The winter and summer dual-purpose heating barn comprises a barn drying tunnel (1) arranged on a workpiece drying and processing travel path; the barn drying tunnel (1) is provided with a warming section (2), a heat preservation section (5) and a cooling chamber (7) which are arranged in sequence; heat or cold air is conveyed by a temperature conveying device through an air flue communicated with the cooling chamber (7) into the cooling chamber (7), so that the cooling chamber (7) has the reserved temperature environment; and the temperature conveying device consist of a burning and heating device (8) and an air cooling device (9). With the adoption of the above structure, the common use of the barn in summer and winter is realized, and while the stability of the barn is improved, the waste of energy sources is avoided.

Description

Winter-summer dual purpose heating barn
Technical field
The utility model relates to dries processing technique field to workpiece, relates in particular to a kind of Winter-summer dual purpose heating barn.
Background technology
As thermal source, the hot-air after the burning is sent into the drying tunnel of barn through airduct to existing barn with natural gas, can adopt air-supply down air draft or down air-supply upward the mode of air draft in barn, form hot-air convection.Workpiece is along the direction section of process intensification successively and the soaking zone of barn, and with the baking of realization to workpiece, the workpiece process after the baking is cold section (cooling chamber) by force, workpiece is lowered the temperature cool off back entering subsequent processing.The operation principle of combustion chamber is that the hot-air after the burning is sent into heated parts in the drying tunnel through airduct under the effect of blower fan with air and the abundant mixed combustion of natural gas.And the barn section that heats up is that workpiece is slowly heated, the temperature that requires up to the condition of cure that workpiece is heated to the workpiece baking; The effect of barn soaking zone is that the workpiece that rises to the technological requirement temperature is toasted the regular hour at a certain temperature, workpiece is reached fully solidify; The operation principle of two ends air curtain be adopt air under certain speed to blowing, prevent that the hot-air in the barn drying tunnel from spreading to two ends; The effect of strong cold house is to adopt the high speed fresh air that workpiece is dried, and makes workpiece reach cool effect; The effect of filter is that impurity in hot-air or the fresh air or particle are filtered out, and reduces workpiece pollution.
The prior art barn is not according to controlling season, because ambient temperature and workpiece surface temperature are higher, under the prerequisite that satisfies workpiece baking standard, it is long the workpiece temperature retention time to occur, causes the waste of the energy in the time of summer; If adopt the method that reduces furnace temperature to shorten temperature retention time, it is elongated to occur drying tunnel body of heater and workpiece heating-up time again, has the waste of the energy equally; And winter ambient temperature and workpiece surface temperature lower, rely on the nature cooling just can reach the effect of work-piece cools, there are waste in the strong cold house and the idleness of equipment thereof.
The utility model content
Be to solve the deficiency that exists in the prior art, the utility model provides a kind of can be implemented in summer and general Winter-summer dual purpose heating barn in winter, in the stability while of improving barn, has avoided the waste of the energy.
For realizing above-mentioned purpose; The Winter-summer dual purpose heating barn of the utility model; Comprise the barn drying tunnel on the travel path that is arranged on the workpiece baking processing; Described barn drying tunnel has the intensification section that is provided with in order, in the section that heats up, carries heat energy so that workpiece is heated through the air channel that is communicated with the section that heats up by first heating plant; Soaking zone is carried heat energy through the air channel that is communicated with soaking zone so that keep a preset steady temperature in the soaking zone by second heating plant in soaking zone; Cooling chamber, by the temperature transport through the air channel that is communicated with cooling chamber in cooling chamber transfer heat or cold wind so that cooling chamber has the temperature environment of reservation; Described temperature transport is made up of combustion heat supplying device and air cooling equipment, and cooling chamber is selectable to be communicated with combustion heat supplying device and air cooling equipment to obtain the air themperature of the external environment that heat that the combustion heat supplying device produces or air cooling equipment obtain.
As the qualification to aforesaid way, described combustion heat supplying device comprises first combustion chamber, first blower fan and first air-valve, and the heat that described first combustion chambers burn produces blows through first blower fan, is delivered in the cooling chamber through first air channel.
As improvement, on first air channel between first combustion chamber and the cooling chamber, be provided with first high-temperature filter to aforesaid way.
As qualification to aforesaid way; Described air cooling equipment comprises strong air-cooler and second air-valve that links to each other with strong air-cooler; Described strong air-cooler places the ambient atmosphere environment, starts through it second air channel of the air under ambient temperature through second air-valve, connection second air-valve and the cooling chamber of conducting is delivered in the cooling chamber.
As the improvement to aforesaid way, described second channel is provided with low-temperature filter.
Adopt technique scheme, the temperature transport is made up of combustion heat supplying device and air cooling equipment, when using summer, because ambient temperature is higher, only needs to start air cooling equipment, realizes the balance of ambient temperature and cooling chamber temperature, can realize air cooling effect; And when winter, according to temperature required, optionally start the combustion heat supplying device cooling chamber is carried out heat delivery, cooling chamber is temperature required until reaching, and when having realized that the winter, the summer was general, has practiced thrift energy resource consumption.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further to specify:
Fig. 1 is the whole annexation block diagram of the utility model.
Among the figure: 1, barn drying tunnel; 2, intensification section; 3, first heating plant; 4, air channel; 5, soaking zone; 6, second heating plant; 7, cooling chamber; 8, combustion heat supplying device; 9, air cooling equipment; 10, first combustion chamber; 11, first blower fan; 12, first air-valve; 13, first air channel; 14, first high-temperature filter; 15, strong air-cooler; 16, second air-valve; 17, second air channel; 18, low-temperature filter; 19, combustion chamber; 20, blower fan; 21, air-valve; 22, high-temperature filter; 23, air curtain.
The specific embodiment
Know by shown in Figure 1; The Winter-summer dual purpose heating barn of the utility model; Comprise the barn drying tunnel 1 on the travel path that is arranged on the workpiece baking processing; Barn drying tunnel 1 has setting in order: the section 2 that heats up, and in intensification section 2, carry heat energy through the air channel 4 that is communicated with the section 2 that heats up by first heating plant 3 so that workpiece is heated; Wherein, First heating plant 3 is made up of combustion chamber 19, blower fan 20, air-valve 21 and high-temperature filter 22; The air outlet of blower fan 20 links to each other with air-valve 21, and the heat output of combustion chamber 19 links to each other with the outlet of air-valve 21, on the air channel 4 between combustion chamber 19 and the intensification section 2, is provided with high-temperature filter 22.The heat that combustion chamber 19 produces enters into after the filtration of high-temperature filter 22 in the section 2 that heats up through the startup of blower fan 20 and the conducting of air-valve 21, and the temperature height that combustion chamber 19 produces can be controlled through adjustment combustion chamber 19 heat capacity sizes.
Soaking zone 5 is carried heat energy through the air channel 4 that is communicated with soaking zone 5 so that keep a preset steady temperature in the soaking zone 5 by second heating plant 6 in soaking zone 5; Wherein, second heating plant 6 has the composition identical with first heating plant 3, and difference is the temperature that the two combustion chamber produces, and it can regulate control according to heat up section 2 and 5 calorific requirements of soaking zone different.
Cooling chamber 7, by the temperature transport through the air channel that is communicated with cooling chamber 7 in cooling chamber 7 transfer heat so that cooling chamber 7 has the temperature environment of reservation.
In addition, be respectively equipped with air curtain 23 in the import department and the exit of barn drying tunnel 1, its concrete structure is identical with existing structure, no longer too much gives unnecessary details at this.
The improvements of the utility model are the change to the temperature transport; Specifically; The temperature transport is made up of combustion heat supplying device 8 and air cooling equipment 9; Cooling chamber 7 is selectable to be communicated with the air themperature of the external environment of obtaining with the heat that obtains 8 generations of combustion heat supplying device or air cooling equipment 9 with combustion heat supplying device 8 and air cooling equipment 9; That is to say that combustion heat supplying device 8 and air cooling equipment 9 are two groups of parallel heat feedwaies that are provided with, and can select a startup according to real needs in use.
Specifically; Combustion heat supplying device 8 comprises first combustion chamber 10, first blower fan 11 and first air-valve 12; Heat the blowing that described first combustion chamber, 10 burnings produce through first blower fan 11; Be delivered in the cooling chamber 7 through first air channel 13, on first air channel 13 between first combustion chamber 10 and the cooling chamber 7, be provided with first high-temperature filter 14.This shows that combustion heat supplying device 8 has identical formation with first heating plant 3 or second heating plant 6.
Air cooling equipment 9 comprises strong air-cooler 15 and second air-valve 16 that links to each other with strong air-cooler 15; Strong air-cooler 15 places the ambient atmosphere environment, starts through it air under ambient temperature is delivered in the cooling chamber 7 through second air-valve 16 of conducting, second air channel 17 that is communicated with second air-valve 16 and cooling chamber 7.On second air channel 17, be provided with low-temperature filter 18.It mainly acts on is to obtain extraneous environment temperature through strong air-cooler 15, so that the temperature in the cooling chamber 7 is with extraneous identical.
It is to be noted for simplified structure that at this unified air channel can be adopted in first air channel 13 and second air channel 17, promptly on the path, air channel behind the output of the low-temperature filter 18 and first high-temperature filter 14, above-mentioned two air channels are cascaded.
Focus on below the use of the utility model improvements (temperature transport) is described: summer is because ambient temperature and processed workpiece surface temperature are higher; Heat loss is little; The barn ability to cure satisfies the oven dry code requirement; Combustion heat supplying device 8 is out of service, opens the strong air-cooler 15 and second air-valve 16 of air cooling equipment 9, and this moment, cooling chamber 7 played strong cold-working usefulness; Winter, barn baking scarce capacity started combustion heat supplying device 8 separately because ambient temperature and processed workpiece surface temperature are low, and the heat that is produced by first combustion chamber 10 passes through first air channel 13 transfer heat in cooling chamber 7; At this moment, because the winter environment temperature is low, also can cancel cooling to workpiece.And can adjust the size of first combustion chamber, 10 heat capacities other seasons according to environment temperature.

Claims (5)

1. a Winter-summer dual purpose heats barn; Comprise the barn drying tunnel (1) on the travel path that is arranged on the workpiece baking processing; Described barn drying tunnel (1) has the intensification section (2) that is provided with in order, in the section (2) that heats up, carries heat energy so that workpiece is heated through the air channel (4) that is communicated with the section (2) that heats up by first heating plant (3); Soaking zone (5) is carried heat energy through the air channel (4) that is communicated with soaking zone (5) so that keep a preset steady temperature in the soaking zone (5) by second heating plant (6) in soaking zone (5); Cooling chamber (7), by the temperature transport through the air channel that is communicated with cooling chamber (7) in cooling chamber (7) transfer heat or cold wind so that cooling chamber (7) has the temperature environment of reservation; It is characterized in that: described temperature transport is made up of combustion heat supplying device (8) and air cooling equipment (9), and cooling chamber (7) is selectable to be communicated with combustion heat supplying device (8) and air cooling equipment (9) to obtain the air themperature of the external environment that heat that combustion heat supplying device (8) produces or air cooling equipment (9) obtain.
2. Winter-summer dual purpose heating barn according to claim 1; It is characterized in that: described combustion heat supplying device (8) comprises first combustion chamber (10), first blower fan (11) and first air-valve (12); The heat that described first combustion chamber (10) burning produces blows through first blower fan (11), is delivered in the cooling chamber (7) through first air channel (13).
3. Winter-summer dual purpose heating barn according to claim 1 is characterized in that: on first air channel (13) between first combustion chamber (10) and the cooling chamber (7), be provided with first high-temperature filter (14).
4. Winter-summer dual purpose heating barn according to claim 1; It is characterized in that: described air cooling equipment (9) comprises strong air-cooler (15) and second air-valve (16) that links to each other with strong air-cooler (15); Described strong air-cooler (15) places the ambient atmosphere environment, starts through it second air-valve (16), connection second air-valve (16) of the air under ambient temperature through conducting is delivered in the cooling chamber (7) with second air channel (17) of cooling chamber (7).
5. Winter-summer dual purpose heating barn according to claim 4, it is characterized in that: described second channel (17) is provided with low-temperature filter (18).
CN2011202278615U 2011-06-30 2011-06-30 Winter and summer dual-purpose heating barn Expired - Fee Related CN202166295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202278615U CN202166295U (en) 2011-06-30 2011-06-30 Winter and summer dual-purpose heating barn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202278615U CN202166295U (en) 2011-06-30 2011-06-30 Winter and summer dual-purpose heating barn

Publications (1)

Publication Number Publication Date
CN202166295U true CN202166295U (en) 2012-03-14

Family

ID=45802114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202278615U Expired - Fee Related CN202166295U (en) 2011-06-30 2011-06-30 Winter and summer dual-purpose heating barn

Country Status (1)

Country Link
CN (1) CN202166295U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108895473A (en) * 2018-07-18 2018-11-27 汽-大众汽车有限公司 A kind of drying oven exhaust gas heat recovery system and heat recovery method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108895473A (en) * 2018-07-18 2018-11-27 汽-大众汽车有限公司 A kind of drying oven exhaust gas heat recovery system and heat recovery method

Similar Documents

Publication Publication Date Title
CN201233183Y (en) Waste heat recovery system for tunnel kiln
CN102798142B (en) A kind of combustion control system
CN205262173U (en) Double -deck sintering furnace
CN105202912A (en) Gas roller way kiln
CN204535377U (en) A kind of baked brick tunnel kiln cooling system
CN201867043U (en) Tunnel kiln for roasting quartz crucibles
CN104121591A (en) Energy-saving efficient incinerator
CN104279853B (en) A kind of air-source fluorine pump type dries dehumidifier all-in-one and drying system thereof
CN207936746U (en) Kiln for ceramic post sintering de-waxing
CN202166295U (en) Winter and summer dual-purpose heating barn
CN202852867U (en) Combustion control system
JP5726875B2 (en) Waste heat system
CN103961955A (en) Preheating process of dust remover for filtering combustible dusty gas
CN201323862Y (en) Combined-type intelligent electromagnetic tobacco curing room
CN214172902U (en) High-efficiency energy-saving tunnel kiln
CN204007123U (en) A kind of high efficiency solar battery Fast Sintering equipment
CN203980296U (en) A kind of staggered regenerative apparatus of energy-saving incinerator
CN203336958U (en) Energy saving tunnel kiln
CN101571356B (en) Method for collecting residual heat of tunnel kiln
CN204115496U (en) A kind of residual heat of tunnel kiln utilize device
CN204104150U (en) The shaping firing equipment of a kind of luggage case sidewall
CN203980301U (en) A kind of efficient energy-saving incinerator
CN106847427A (en) Paint baking oven hot wind exchanging type automatic cooling system
CN113915980A (en) Pole piece drying system for lithium ion battery coating process and technological method thereof
CN202297701U (en) Single-roller inclined hardening furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20170630