CN202163770U - An assembled powder tank - Google Patents
An assembled powder tank Download PDFInfo
- Publication number
- CN202163770U CN202163770U CN2011201429374U CN201120142937U CN202163770U CN 202163770 U CN202163770 U CN 202163770U CN 2011201429374 U CN2011201429374 U CN 2011201429374U CN 201120142937 U CN201120142937 U CN 201120142937U CN 202163770 U CN202163770 U CN 202163770U
- Authority
- CN
- China
- Prior art keywords
- storehouse
- silo
- piece
- flange
- awl
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Storage Of Harvested Produce (AREA)
Abstract
The utility model relates to an assembled powder tank, comprising a top cabin, a plurality of silos, and a cone cabin. The top cabin, the silos and the cone cabin are connected and/or welded together through flanges; the plurality of silos are connected and/or welded together through flanges; the top cabin is provided with a plurality of top cabin sections, which are connected and/or welded together through flanges; each silo comprises a plurality of silo sections, which are connected and/or welded together through flanges; and the cone cabin is provided with a plurality of cone cabin sections, which are connected and/or welded together through flanges. The assembled powder tank integrates the advantages of a splicing powder tank and a welding powder tank and improves installing speed; most parts of the assembled powder tank can be manufactured in factories and thus require assembly and spare welding only on site, and can be recycled; the prefabricated parts realize reduction of installation procedures on site and work intensity and have high circular degree; and by employing sealing strips, sealing gaskets and sealant for sealing, the assembled powder tank guarantees that the assembly structure has the same tightness as a welding structure does.
Description
Technical field
The utility model relates to a kind of powder jar, particularly a kind of pin-connected panel powder jar.
Background technology
Along with being on the increase of construction projects such as railway, highway, skyscraper, bridge; Required material also sharply strengthens; The powder jar is an equipment commonly used in concrete mixing plant or other building yards, is used to store granular materials such as cement, admixture, dry type powder additive.At present; Most of silo manufacturing enterprise adopts the mode of field fabrication, and there are condition restriction such as equipment, personnel, place in field fabrication, and the duration is longer; When if the project site changes in the use, silo can only be handle on the spot or gas cutting after be transported to new scene and weld again.So both increase human and material resources, also increased the time and the cost of engineering.A small amount of enterprise adopts the powder jar of pin-connected panel, and capacity surpasses 200t, bigger powder jar, and transportation is difficulty very, generally makes at concrete mixing plant or building yard scene.
Fig. 1 is the structural representation of existing powder jar.The powder jar generally is made up of the more piece silo, comprises top tube 101, silo 102 and awl storehouse 103; Awl storehouse 103 is positioned at the lower end, and multi-node silo 102 fixed order are on awl 103 tops, storehouse, and storehouse 101, top is fixed on silo 102 tops that are positioned at the upper end, passes through welded seal between each silo, and fixing, so just in the inner space of storing granular material that forms of silo.Usually the powder jar is placed on the corresponding support; In Fig. 1; The powder jar is placed on the support 105 in the on-site installation and each item work of concrete mixing plant through awl storehouse 103, and the making of powder jar is a manufacture difficulty maximum in the field-mounted process, the part that fabrication cycle is the longest.And there is more potential safety hazard in this part work.
Every joint silo of welded type powder jar is earlier two or three block plates to be welded into a monoblock steel plate; Tens people are together with 180 ° of steel plate upsets then; By suspender or topotype steel plate is surrounded round warehouse; The part of steel plate butt joint is welded when surrounding warehouse at last, forms the single-unit silo, like Fig. 2.Every block welding steel plate together is near 1 ton, and this process need a large amount of workmans operate simultaneously, and working strength is very big, and inefficiency, and the mode of production falls behind.
When welded type powder jar docked at every adjacent two joint silos, joint will carry out outside weldings earlier, and then carries out interior welds; In inside is an osed top space; The workman is when carrying out welding operation, and producing a large amount of pernicious gases can not in time discharge, and workers ' health is damaged easily.
When silo docks, because surrounding round warehouse with steel plate, suspender or topotype be difficult to guarantee its circularity that what cause that the place of silo butt joint suits is bad, brings very big difficulty for riveter rivet welding two adjacent warehouse joints.Be difficult to two joint silos are linked together.
Silo and silo all adopt the mode be welded to connect between silo and the stirrup, the not only adjacent silo joint of butt joint needs the two-sided full weld of executing, and the junction also need weld the reinforcement stirrup, and the welding job amount is big, and cycle of operations is long.
The object that welded type powder jar transports from the factory to the place comprises steel plate, Cang Ding, support, cone piece etc., because these object specifications differ greatly, is difficult to once transportation and accomplishes, and causes the transport space waste, and traffic cost increases.
The utility model content
In order to overcome the above-mentioned defective and the deficiency of prior art, the utility model provides a kind of pin-connected panel powder jar.The powder jar adopts splicing structure, and easy for installation, labour intensity is low.
A kind of pin-connected panel powder jar that the utility model provides comprises top storehouse, silo and awl storehouse, and the quantity of said silo is a plurality of, and flange connects and/or welding between storehouse, said top, silo and the awl storehouse.
Preferably, flange connects and/or welding between described a plurality of silos, and storehouse, said top comprises storehouse, a plurality of top piece.
Preferably, flange connects and/or welding between the piece of storehouse, described a plurality of top.
Preferably, described each silo comprises a plurality of silo pieces, and flange connects and/or welding between described a plurality of silo pieces, and said awl storehouse comprises a plurality of awls storehouse piece, and flange connects and/or welding between the piece of described a plurality of awls storehouse.
Preferably, storehouse, said top piece, silo piece and awl storehouse piece are preformed part.
Storehouse, said top is formed with or is provided with and said silo flange connecting; Said each silo is formed with or is provided with and storehouse, said top, other said silos and said awl storehouse flange connecting, and said awl storehouse is formed with or is provided with and said silo flange connecting.
Described each storehouse, top piece is formed with or is provided with and other storehouse, said top piece flange connecting; Described each silo piece is formed with or is provided with and other said silo piece flange connecting, and described each awl storehouse piece is formed with or is provided with and other said awl storehouse piece flange connecting.
On the body of said flange at interval have an installation through holes, the installation through holes position of two said flanges connected to one another is corresponding.
Be provided with sealing band at said flange connections.
Apply sealant at said sealing band place, form sealing layer.
Also comprise support and bearing, said bearing is fixed on said silo or the awl storehouse, and said support is connected with said bearing flange or welds.
The beneficial effect that a kind of pin-connected panel powder jar that adopts the utility model to provide brings is: (1) is divided into storehouse, top, three parts of silo and awl storehouse with whole powder jar; Be assemblied to form the powder jar each other, will push up storehouse, silo and each part of awl storehouse again simultaneously and make assembled structure, splice each other to be assembled into by storehouse, a plurality of top piece and push up the storehouse; Each silo piece splices each other and is assembled into silo; Each awl storehouse piece splices to be assembled into each other bores the storehouse, adopts splicing stack-mounted structure, and an integral device is split into a plurality of assembling parts; Each assembling parts splits into a plurality of assembling pieces again; The piece volume is little, be convenient to transportation and be convenient to on-site installation, and assembly operation is very convenient, reduces field erected labour intensity greatly.(2) piece is formed with or is provided with flange, and is fixing through the flange connection between the piece, makes whole powder jar when mounted, and mounting structure is simple, installation is very convenient.Compare with the existing welding manner that adopts, greatly reduce working strength of workers and reduce greatly, improved packaging efficiency, shorten assembling cycle, and the infringement of health when reducing multiplex (MUX) people and welding, whole erection process cleaning, safety, environmental protection.In addition, adopt flange bonded assembly structure, convenient and swift when not only assembling, and also also very convenient quick when dismounting.(3) installation through holes of two flanges connected to one another, the position corresponds to each other, and when mounted, that has avoided two link joints suits bad and installation question that bring.(4) be provided with sealing band at each flange connections, increase the air-tightness of whole powder jar, guarantee that flange bonded assembly structure has the air-tightness the same with welding, on the basis of sealing band, apply one deck sealant again, further increase the air-tightness of powder jar.(5) this programme is divided into three parts with the powder jar; Each parts is divided into the piece of a plurality of mutual assembly units again; Storehouse, top piece, silo piece and awl storehouse piece, these pieces are prefabricate preformed part all, transport directly to the camp site assembling during use and get final product; Need not field fabrication again, improved installation effectiveness greatly.And the structure of assembled piece type is also for convenience detach, the use of packing and transporting and other workyards.Can accomplish recycling use.(6) the silo piece is the arc piece, and directly bolt together becomes silo at the scene, thereby has avoided that circularity is not enough in the welded type silo manufacturing process, labour intensity big and unsafe steel plate encloses round backward technology.
Description of drawings
Fig. 1 is the integral structure scheme drawing of existing powder jar.
Fig. 2 is the making scheme drawing of silo in the existing powder jar.
Fig. 3 is the integral structure scheme drawing of the utility model powder jar.
Fig. 4 is the plan structure figure in the utility model powder jar Zhong Ding storehouse.
Fig. 5 is an A-A cutaway view among Fig. 4, when flange bonded assembly structure is shown, the structure on the piece of being located at of flange welding is shown also.
Fig. 6 is the cutaway view in the utility model powder jar Zhong Ding storehouse.
Fig. 7 is the construction profile of the utility model powder jar Zhong Ding storehouse piece.
Fig. 8 is the plan structure figure of the utility model powder jar Zhong Ding storehouse piece.
Fig. 9 is the plan structure figure of silo in the utility model powder jar.
Figure 10 is the construction profile of silo in the utility model powder jar.
Figure 11 be among Figure 10 B-B to cutaway view.
Figure 12 is the partial enlarged drawing of C among Figure 11, when local bindiny mechanism is shown, the integrally formed structure of flange is shown also.
Figure 13 is the plan structure figure of silo piece in the utility model powder jar.
Figure 14 is the integral structure figure in awl storehouse in the utility model powder jar.
The specific embodiment
To combine the accompanying drawing among the utility model embodiment below, the technical scheme among the utility model embodiment is carried out clear, intactly description, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Like Fig. 3 to a kind of pin-connected panel powder jar that provides for the utility model shown in Figure 14; Comprise storehouse 1, top, silo 2 and awl storehouse 3; The quantity of said silo 2 is a plurality of; Flange connects between storehouse, said top 1, the uppermost silo 2, and flange is connected flange connection between described a plurality of silos 2 between nethermost silo 2 and the awl storehouse 3.Except flange connects, also can weld between a plurality of silos or be connected and be used in combination with flange, employing is welded between nethermost silo 2 and the awl storehouse 3.
To shown in Figure 8, storehouse, said top 1 comprises storehouse, a plurality of top piece 11 like Fig. 4, and storehouse, a plurality of top piece 11 is interconnected to form storehouse 1, top.Flange connects between the piece 11 of storehouse, described a plurality of top.Except flange connects, can weld between storehouse, a plurality of top piece 11.Or part is pushed up flange connection between the storehouse piece 11, welding between other storehouse, parts top pieces 11.
To shown in Figure 13, described each silo 2 comprises a plurality of silo pieces 21 like Fig. 9, and described each silo piece 21 is an arc, is connected to each other to form the silo 2 of a circle.Flange connects between described a plurality of silo piece 21.Except flange connects, can weld between a plurality of silo pieces 21.Or flange connects between the part silo piece 21, welding between other part silo pieces 21, and the flange connection combines with welding manner.
Shown in figure 14, said awl storehouse 3 comprises a plurality of awls storehouse piece 31, and a plurality of awls storehouse piece 31 is interconnected to form awl storehouse 3.Flange connects between the piece 31 of described a plurality of awls storehouse.Except flange connects, can weld between a plurality of awls storehouse piece 31.Or partly bore flange connection between the storehouse piece 31, and welding between other parts awl storehouse pieces 31, the flange connection combines with welding manner.
In the present embodiment; Storehouse, said top 1 is integrally formed just like Fig. 4, shown in Figure 8 and said silo 2 flange connecting 4; Said silo 2 is formed with shown in figure 13 and storehouse, said top 1, other said silos 2 and said awl storehouse 3 flange connecting 4, and said awl storehouse 3 is formed with and said silo 2 flange connecting 4.
Being provided with of the body welding of described each top storehouse piece 11 like Fig. 5, Fig. 6, shown in Figure 7 and other storehouse, said top piece 11 flange connecting 4; Described each silo piece 21 is integrally formed just like Figure 11, shown in Figure 12 and other said silo piece 21 flange connecting 4, and described each awl storehouse piece 31 is formed with and other said awl storehouse piece 31 flange connecting 4.
On the body of said flange 4 at interval have an installation through holes 41, installation through holes 41 positions of two said flanges 4 connected to one another are corresponding, when mounted, avoid bad and installation question that bring of suiting of two link joints.
Shown in figure 12, be provided with sealing band 5 in said flange 4 junctions.Locate to apply sealant 5 of said sealings, form sealing layer.To guarantee the air-tightness of whole powder jar.
After Jiang Dingcang 1, silo 2 and 3 assemblings of awl storehouse are accomplished, with bearing 7 fixing want on the silo 2 or awl storehouse 3 on, let the back be connected and fix with support 6 flanges, be generally the powder jar stable support be provided.Bottom in said awl storehouse 3 is provided with discharging opening 31, so that granular material flows out.
For the ease of transportation, on-site installation, storehouse, said top piece 11, silo piece 21 and awl storehouse piece 31 are preformed part, make in advance in factory, are transported to on-the-spot back and only need simply assemble, install and get final product.
When assembling at the scene; With between the top storehouse piece 11 each other flange connect to form complete storehouse, top 1, will push up again between storehouse 1 and the uppermost silo piece 21 and be connected, and then successively each silo piece 21 passed through the flange connection through flange; Be to bore storehouse piece flange connection or welding after installing nethermost silo piece 21; And then other awl storehouse pieces 21 welding successively or flange are coupled together, bearing is weldingly fixed on the awl storehouse piece 21, and the powder jar integral body that will connect completion is at last put on the support 6 through bearing 7; Then bearing 7 is connected with support 6 flanges and fixes, or welding is fixing.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; All within the spirit and principle of the utility model, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the utility model.
Claims (11)
1. a pin-connected panel powder jar comprises storehouse (1), top, silo (2) and awl storehouse (3), and the quantity of said silo (2) is a plurality of, it is characterized in that: storehouse, said top (1), a plurality of silo (2) and awl storehouse (3) flange each other are connected and/or weld.
2. pin-connected panel powder jar according to claim 1 is characterized in that: storehouse, said top (1) comprises storehouse, a plurality of top piece (11), and flange connects and/or welding between described a plurality of top storehouse piece (11).
3. pin-connected panel powder jar according to claim 1 and 2 is characterized in that: described each silo (2) comprises a plurality of silo pieces (21), and flange connects and/or welding between described a plurality of silo pieces (21).
4. pin-connected panel powder jar according to claim 3 is characterized in that: said awl storehouse (3) comprises a plurality of awls storehouse piece (31), and flange connects and/or welding between described a plurality of awls storehouse pieces (31).
5. pin-connected panel powder jar according to claim 1 is characterized in that: said awl storehouse (3) comprises a plurality of awls storehouse piece (31), and flange connects and/or welding between described a plurality of awls storehouse pieces (31).
6. according to claim 1 or 4 described pin-connected panel powder jars; It is characterized in that: storehouse, said top (1) is formed with or is provided with and said silo (2) flange connecting (4); Said each silo (2) is formed with or is provided with and storehouse, said top (1), other said silos (2) and said awl storehouse (3) flange connecting (4), and said awl storehouse (3) is formed with or is provided with and said silo (2) flange connecting (4).
7. pin-connected panel powder jar according to claim 6; It is characterized in that: described each top storehouse piece (11) is formed with or is provided with and other storehouse, said top piece (11) flange connecting (4); Described each silo piece (21) is formed with or is provided with and other said silo piece (21) flange connecting (4), and described each awl storehouse piece (31) is formed with or is provided with and other said awl storehouse piece (31) flange connecting (4).
8. pin-connected panel powder jar according to claim 7 is characterized in that: on the body of said flange (4) at interval have an installation through holes (41), installation through holes (41) position of two said flanges connected to one another (4) is corresponding.
9. pin-connected panel powder jar according to claim 8 is characterized in that: be provided with sealing band (5) in said flange (4) junction.
10. pin-connected panel powder jar according to claim 9 is characterized in that: locate to apply sealant at said sealing band (5), form sealing layer.
11. pin-connected panel powder jar according to claim 1 is characterized in that: also comprise support (6) and bearing (7), said bearing is fixed on said silo or the awl storehouse, and said support is connected with said bearing flange or welds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201429374U CN202163770U (en) | 2011-05-07 | 2011-05-07 | An assembled powder tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201429374U CN202163770U (en) | 2011-05-07 | 2011-05-07 | An assembled powder tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202163770U true CN202163770U (en) | 2012-03-14 |
Family
ID=45799613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201429374U Expired - Lifetime CN202163770U (en) | 2011-05-07 | 2011-05-07 | An assembled powder tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202163770U (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102730351A (en) * | 2012-06-18 | 2012-10-17 | 潍坊金河机械有限公司 | Storage silo and silo manufacturing method of storage silo |
CN104370009A (en) * | 2014-10-24 | 2015-02-25 | 潍坊金河机械有限公司 | Upper cone body of cerement bin and manufacturing process of upper cone body |
CN104370012A (en) * | 2014-10-24 | 2015-02-25 | 潍坊金河机械有限公司 | Lower cone body of cerement bin and manufacturing process of lower cone body |
CN104401604A (en) * | 2014-10-24 | 2015-03-11 | 潍坊金河机械有限公司 | Cement bin and manufacturing process thereof |
CN104477534A (en) * | 2014-12-03 | 2015-04-01 | 梁昌国 | Combined type cement silo cylinder sheet and producing method thereof |
CN105756399A (en) * | 2016-02-22 | 2016-07-13 | 中交路桥华东工程有限公司 | Combined type large-capacity typhoon-resistant silo and manufacturing method thereof |
CN106347889A (en) * | 2016-11-10 | 2017-01-25 | 长沙爱达环保科技有限公司 | Splitting powder material tank |
CN106429064A (en) * | 2016-11-22 | 2017-02-22 | 济南共建机械有限公司 | Flaky bin |
CN107973012A (en) * | 2017-11-14 | 2018-05-01 | 中国电建集团西北勘测设计研究院有限公司 | A kind of tile powder material tank and shelf type installation method |
CN108555547A (en) * | 2018-07-07 | 2018-09-21 | 郑州海特机械有限公司 | A kind of aerobic fermentation casing body manufacture craft |
CN109760965A (en) * | 2019-01-15 | 2019-05-17 | 安徽铜冠机械股份有限公司 | Flue dust transports tank |
CN110405076A (en) * | 2019-09-03 | 2019-11-05 | 潍坊市贝特工程机械有限公司 | The molding die and its forming method of pin-connected panel storage tank arc jigsaw |
CN110683159A (en) * | 2019-09-27 | 2020-01-14 | 中国科学院高能物理研究所 | Splicing side wall structure of sealed container and sealed container with splicing side wall structure |
CN111874471A (en) * | 2020-07-31 | 2020-11-03 | 河南实荣筒仓工程有限公司 | Novel steel plate bin circumferential sealing device |
CN112012546A (en) * | 2020-09-03 | 2020-12-01 | 河南实荣筒仓工程有限公司 | Super-huge type full-sealed assembly type industrial steel plate bin |
CN115075425A (en) * | 2022-07-21 | 2022-09-20 | 中国船舶重工集团国际工程有限公司 | Stud welding and box plate combined assembly type steel structure building unit and construction method |
-
2011
- 2011-05-07 CN CN2011201429374U patent/CN202163770U/en not_active Expired - Lifetime
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102730351B (en) * | 2012-06-18 | 2015-06-10 | 潍坊金河机械有限公司 | Storage silo and silo manufacturing method of storage silo |
CN102730351A (en) * | 2012-06-18 | 2012-10-17 | 潍坊金河机械有限公司 | Storage silo and silo manufacturing method of storage silo |
CN104370009A (en) * | 2014-10-24 | 2015-02-25 | 潍坊金河机械有限公司 | Upper cone body of cerement bin and manufacturing process of upper cone body |
CN104370012A (en) * | 2014-10-24 | 2015-02-25 | 潍坊金河机械有限公司 | Lower cone body of cerement bin and manufacturing process of lower cone body |
CN104401604A (en) * | 2014-10-24 | 2015-03-11 | 潍坊金河机械有限公司 | Cement bin and manufacturing process thereof |
CN104477534A (en) * | 2014-12-03 | 2015-04-01 | 梁昌国 | Combined type cement silo cylinder sheet and producing method thereof |
CN104477534B (en) * | 2014-12-03 | 2016-08-31 | 梁昌国 | A kind of Combined water hopper dredger cylinder sheet and manufacture method thereof |
CN105756399A (en) * | 2016-02-22 | 2016-07-13 | 中交路桥华东工程有限公司 | Combined type large-capacity typhoon-resistant silo and manufacturing method thereof |
CN106347889B (en) * | 2016-11-10 | 2018-07-27 | 长沙爱达环保科技有限公司 | A kind of assembled powder pot |
CN106347889A (en) * | 2016-11-10 | 2017-01-25 | 长沙爱达环保科技有限公司 | Splitting powder material tank |
CN106429064A (en) * | 2016-11-22 | 2017-02-22 | 济南共建机械有限公司 | Flaky bin |
CN107973012A (en) * | 2017-11-14 | 2018-05-01 | 中国电建集团西北勘测设计研究院有限公司 | A kind of tile powder material tank and shelf type installation method |
CN107973012B (en) * | 2017-11-14 | 2019-07-16 | 中国电建集团西北勘测设计研究院有限公司 | A kind of tile powder material tank and shelf type installation method |
CN108555547A (en) * | 2018-07-07 | 2018-09-21 | 郑州海特机械有限公司 | A kind of aerobic fermentation casing body manufacture craft |
CN109760965A (en) * | 2019-01-15 | 2019-05-17 | 安徽铜冠机械股份有限公司 | Flue dust transports tank |
CN110405076A (en) * | 2019-09-03 | 2019-11-05 | 潍坊市贝特工程机械有限公司 | The molding die and its forming method of pin-connected panel storage tank arc jigsaw |
CN110405076B (en) * | 2019-09-03 | 2024-04-23 | 潍坊市贝特工程机械有限公司 | Forming die and forming method for arc jointed boards of assembled storage tank |
CN110683159A (en) * | 2019-09-27 | 2020-01-14 | 中国科学院高能物理研究所 | Splicing side wall structure of sealed container and sealed container with splicing side wall structure |
CN111874471A (en) * | 2020-07-31 | 2020-11-03 | 河南实荣筒仓工程有限公司 | Novel steel plate bin circumferential sealing device |
CN112012546A (en) * | 2020-09-03 | 2020-12-01 | 河南实荣筒仓工程有限公司 | Super-huge type full-sealed assembly type industrial steel plate bin |
CN115075425A (en) * | 2022-07-21 | 2022-09-20 | 中国船舶重工集团国际工程有限公司 | Stud welding and box plate combined assembly type steel structure building unit and construction method |
WO2024016412A1 (en) * | 2022-07-21 | 2024-01-25 | 中国船舶重工集团国际工程有限公司 | Boxboard prefabricated steel structure building unit with combined bolts and welding, and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202163770U (en) | An assembled powder tank | |
CN103015536B (en) | Beam-column joint connecting device for multi-story/high-rise assembly type steel structure system | |
CN102071830B (en) | FRP (fiber reinforce plastic) tube-concrete-steel tube combined tube tower and segmented construction method thereof | |
CN205295918U (en) | Purlin piece is assembled to multipurpose standard | |
CN110748157B (en) | Silo conical hopper split type combined steel template and construction method thereof | |
CN102011432B (en) | Novel polygonal combined steel pipe | |
CN202379302U (en) | Assembled steel silo | |
CN201882475U (en) | Powder silo | |
CN201485968U (en) | Node connecting structure of box-shaped post and framework beam | |
CN103104034A (en) | Connected node of end plate type H-shaped steel beam and rectangular pipe column split bolt | |
CN215859344U (en) | Storehouse dome and steel sheet storehouse | |
CN202194250U (en) | Bolting-welding mixed joint for on-site butting of steel girders and flanges | |
CN112372172B (en) | Setting method of full-welded steel truss chord member block | |
CN205295915U (en) | Wave form steel web nose girder | |
CN204453425U (en) | A kind of steel floor of container underframe and freight container | |
CN209975752U (en) | Integrated prefabricated wallboard house structure | |
CN209308165U (en) | A kind of pin-connected panel lightweight steel construction face construction apply in feed bin canopy | |
CN204312009U (en) | Christmas tree platform and Christmas tree double-layer platform | |
CN202391141U (en) | Turnaround type assembly platform | |
CN202379303U (en) | Powder silo | |
CN203175124U (en) | Assembled steel plate bin | |
CN207332112U (en) | Box type steel beam structure | |
CN207620441U (en) | The detachable reinforcing steel processing shed of regularization | |
CN111074793A (en) | Cantilever construction steel beam segment butt welding temporary locking device and construction method | |
CN212583039U (en) | Z-shaped purline for light steel factory building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120314 |
|
CX01 | Expiry of patent term |