CN112012546A - Super-huge type full-sealed assembly type industrial steel plate bin - Google Patents

Super-huge type full-sealed assembly type industrial steel plate bin Download PDF

Info

Publication number
CN112012546A
CN112012546A CN202010917914.XA CN202010917914A CN112012546A CN 112012546 A CN112012546 A CN 112012546A CN 202010917914 A CN202010917914 A CN 202010917914A CN 112012546 A CN112012546 A CN 112012546A
Authority
CN
China
Prior art keywords
bin
wall
steel plate
silo
bin top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010917914.XA
Other languages
Chinese (zh)
Inventor
杨功晓
温鹏
李银豪
曹春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Shirong Silo Engineering Co ltd
Original Assignee
Henan Shirong Silo Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Shirong Silo Engineering Co ltd filed Critical Henan Shirong Silo Engineering Co ltd
Priority to CN202010917914.XA priority Critical patent/CN112012546A/en
Publication of CN112012546A publication Critical patent/CN112012546A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/30Constructions, with or without perforated walls, depending on the use of specified materials mainly of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses an oversize full-seal assembled industrial steel plate bin, wherein a bin top and a bin wall are spliced through a bin top and bin wall connecting node to form the industrial steel plate bin, the bin top comprises a bin top platform, a bin top support frame and a plurality of bin top plates, the bin top support frame is fixed on the bin top platform, the bin top plates are fixed on the bin top support frame, the bin top plates are fixedly connected through bin top flange splicing nodes, and the bin wall is composed of a plurality of bin wall plates which are spliced through a bin wall circumferential flange splicing node and a bin wall vertical splicing node, the structural safety and the whole air tightness of the industrial steel plate bin body are improved.

Description

Super-huge type full-sealed assembly type industrial steel plate bin
Technical Field
The invention relates to the technical field of industrial steel plate bins, in particular to an oversize full-seal assembly type industrial steel plate bin.
Background
With the industrial steel plate bin entering the international market in China, competition is carried out. The diameter of a large industrial steel plate warehouse is generally more than 10 meters, due to the difficulty in transportation, parts must be delivered, and foreign welding construction is carried out, due to the restriction of regions and foreign labor policies, constructors of our part often cannot smoothly distribute and stay on the site, and professional construction technologies, equipment and personnel are lacked locally, so that the overseas construction period is long, the construction quality is difficult to control, the construction cost is high, and the bottleneck that the industrial steel plate warehouse technology in China is restricted to move to the internationalization is formed. Therefore, how to ensure the rapid installation and forming of the steel plate silo in foreign projects and ensure the air tightness of the steel plate silo in a construction site become the primary problem in the industry of the steel plate silo in China.
Disclosure of Invention
The invention aims to provide an oversize full-seal assembly type industrial steel plate bin to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: the oversize full-seal assembly type industrial steel plate bin comprises a bin top and a bin wall, wherein the bin top and the bin wall are spliced through a bin top and bin wall connecting node to form the industrial steel plate bin;
the bin top comprises a bin top platform, a bin top support frame and a plurality of bin top plates, the bin top support frame is fixed on the bin top platform, the bin top plates are fixed on the bin top support frame, and the bin top plates are fixedly connected through bin top flange splicing nodes;
the bin wall is formed by splicing nodes of a plurality of bin wall plates through circumferential flanges of the bin wall and vertical splicing nodes of the bin wall.
Further, the upper part of the bin top plate is covered with a bin top sealing cover.
Further, the outer part of the silo wall annular flange splicing node is covered with a silo wall annular sealing cover, and the outer part of the silo wall vertical splicing node is covered with a silo wall vertical sealing cover.
Furthermore, the circumferential flange splicing node of the bin wall and the vertical splicing node of the bin wall are fixed on the bin wall plate.
Compared with the prior art, the invention has the beneficial effects that:
1. the cabin top platform, the cabin top support frame and a plurality of uniformly distributed cabin top plates in the super-huge type full-sealing assembly type industrial steel plate cabin form a cabin top support structure system, the safety of the steel plate cabin top structure is guaranteed, and the cabin top sealing cover is rain-proof and dust-proof, so that the air tightness of the cabin top plates is guaranteed. The uniformly distributed bin wall plates form a bin wall structure system through the circumferential bin wall flange splicing nodes and the vertical bin wall splicing nodes, and the safety of the steel plate bin wall structure is guaranteed. The circumferential sealing cover of the bin wall and the vertical sealing cover of the bin wall jointly form external sealing of the bin wall, and the sealing structure is rainproof and dustproof, prevents external rainwater from leaking into the bin, guarantees that materials in the bin are not affected with damp, and simultaneously prevents the materials in the bin from overflowing to cause environmental pollution. The bin top and the bin wall form the industrial steel plate bin through the bin top and bin wall connecting nodes with seals, so that the structural safety of the steel plate bin is guaranteed, and the air tightness of the steel plate bin is also guaranteed.
2. This kind of super-huge totally enclosed assembled industry steel sheet storehouse not only can practice thrift artifical and shorten construction period greatly, realizes quick erection construction, makes things convenient for the quality management and control moreover, when promoting power efficiency by a wide margin, has promoted the structural security and the whole gas tightness of industry steel sheet storehouse body, greatly reduces steel sheet storehouse construction cost, can gain very big economic benefits to the erection construction of international engineering very much.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure a of the present invention;
FIG. 3 is a top plan view of the overall structure of the present invention;
FIG. 4 is a schematic view of the structure of the present invention in the direction A-A;
FIG. 5 is a schematic view of the structure of the present invention in the direction B-B;
FIG. 6 is a schematic view of the C-C direction structure of the present invention.
In the reference symbols: 1. the top of the bin; 2. a wall of the silo; 3. the bin top is connected with the bin wall through a joint; 4. a bin top platform; 5. a bin top support frame; 6. a bin roof; 7. splicing nodes of the bin top flanges; 8. a bin wall panel; 9. splicing nodes of circumferential flanges on the bin wall; 10. the vertical splicing nodes of the bin wall; 11. a cabin top sealing cover; 12. a circumferential sealing cover on the wall of the bin; 13. the vertical sealed cowling of bulkhead.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. In which like parts are designated by like reference numerals. It should be noted that as used in the following description, the terms "front," "back," "left," "right," "upper," and "lower" refer to directions in the drawings, and the terms "bottom" and "top," "inner," and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
Referring to fig. 1-6, the present invention provides a technical solution: an oversize full-seal assembly type industrial steel plate bin comprises a bin top 1 and a bin wall 2, wherein the bin top 1 and the bin wall 2 are spliced through a bin top and bin wall connecting node 3 to form the industrial steel plate bin;
the bin top 1 comprises a bin top platform 4, a bin top support frame 5 and a plurality of bin top plates 6, the bin top support frame 5 is fixed on the bin top platform 4, the bin top plates 6 are fixed on the bin top support frame 5, and the bin top plates 6 are fixedly connected through bin top flange splicing nodes 7;
the bin wall 2 is composed of a plurality of bin wall plates 8 and bin wall vertical splicing nodes 10 through bin wall circumferential flange splicing nodes 9.
The upper part of the bin top plate 6 is covered with a bin top sealing cover 11, so that the rainproof and dustproof effects are achieved, and the air tightness of the bin top plate is guaranteed.
The outside of bulkhead circumferential flange concatenation node 9 covers there is bulkhead circumferential sealed cowling 12, and the outside of the vertical concatenation node 10 of bulkhead covers there is bulkhead vertical sealed cowling 13, and bulkhead circumferential sealed cowling 12 and the vertical sealed cowling 13 of bulkhead constitute bulkhead external seal jointly, and is rain-proof dustproof, prevents that outside rainwater from leaking toward storehouse internal seepage, guarantees that the interior material of storehouse does not wet, prevents simultaneously that the interior material dust is excessive and causes environmental pollution.
The bin wall circumferential flange splicing node 9 and the bin wall vertical splicing node 10 are fixed on the bin wall plate 8.
The working principle is as follows: a bin top platform 4, a bin top support frame 5 and a plurality of equally-divided bin top plates 6 in the industrial steel plate bin are connected into a whole through a bin top flange splicing node 7 to form an industrial steel plate bin top 1, a bin top sealing cover 11 covers the upper part of the bin top flange splicing node 7, a plurality of equally-divided bin wall plates 8 form a bin wall through a bin wall circumferential flange splicing node 9 and a bin wall vertical splicing node 10, a bin wall circumferential sealing cover 12 covers the outer part of the bin wall circumferential flange splicing node 9, a bin wall vertical sealing cover 13 covers the outer part of the bin wall vertical splicing node 10, the bin top 1 and the bin wall 2 are spliced together through the bin top and the bin wall connecting node 3 to form the industrial steel plate bin, the structural safety of the steel plate bin is guaranteed, the air tightness of the steel plate bin is also guaranteed, wherein the bin top platform 4, the bin top support frame 5 and the equally-divided bin top plates 6 form a bin top support structure system to guarantee the structural safety of the steel plate bin, the air tightness of the warehouse roof plate is guaranteed through rain prevention and dust prevention of the warehouse roof sealing cover, a plurality of equally divided warehouse wall plates 8 form a warehouse wall structure system through warehouse wall circumferential flange splicing nodes 9 and warehouse wall vertical splicing nodes 10, safety of a steel plate warehouse wall structure is guaranteed, warehouse wall circumferential sealing covers 12 and warehouse wall vertical sealing covers 13 jointly form warehouse wall external sealing, rain prevention and dust prevention are achieved, external rainwater is prevented from leaking in toward a warehouse in an infiltration mode, materials in the warehouse are guaranteed not to be damped, and meanwhile, environmental pollution is caused due to the fact that dust of the materials in the warehouse overflows.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides an oversize totally enclosed assembled industry steel sheet storehouse which characterized in that: the steel plate silo comprises a silo top (1) and a silo wall (2), wherein the silo top (1) and the silo wall (2) are spliced through a silo top and silo wall connecting node (3) to form an industrial steel plate silo;
the bin top (1) comprises a bin top platform (4), a bin top support frame (5) and a plurality of bin top plates (6), the bin top support frame (5) is fixed on the bin top platform (4), the bin top plates (6) are fixed on the bin top support frame (5), and the bin top plates (6) are fixedly connected through bin top flange splicing nodes (7);
the bin wall (2) is composed of a plurality of bin wall plates (8) and bin wall vertical splicing nodes (10) through bin wall circumferential flange splicing nodes (9).
2. The oversized fully-sealed assembled industrial steel plate bin according to claim 1, wherein: the upper part of the bin top plate (6) is covered with a bin top sealing cover (11).
3. The oversized fully-sealed assembled industrial steel plate bin according to claim 1, wherein: the outer part of the silo wall annular flange splicing node (9) is covered with a silo wall annular sealing cover (12), and the outer part of the silo wall vertical splicing node (10) is covered with a silo wall vertical sealing cover (13).
4. The oversized fully-sealed assembled industrial steel plate bin according to claim 1, wherein: and the circumferential bin wall flange splicing node (9) and the vertical bin wall splicing node (10) are fixed on the bin wall plate (8).
CN202010917914.XA 2020-09-03 2020-09-03 Super-huge type full-sealed assembly type industrial steel plate bin Pending CN112012546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010917914.XA CN112012546A (en) 2020-09-03 2020-09-03 Super-huge type full-sealed assembly type industrial steel plate bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010917914.XA CN112012546A (en) 2020-09-03 2020-09-03 Super-huge type full-sealed assembly type industrial steel plate bin

Publications (1)

Publication Number Publication Date
CN112012546A true CN112012546A (en) 2020-12-01

Family

ID=73517195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010917914.XA Pending CN112012546A (en) 2020-09-03 2020-09-03 Super-huge type full-sealed assembly type industrial steel plate bin

Country Status (1)

Country Link
CN (1) CN112012546A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653390A (en) * 2021-09-24 2021-11-16 华电重工股份有限公司 Storehouse dome and steel sheet storehouse
CN115030587A (en) * 2022-06-28 2022-09-09 河南实荣筒仓工程有限公司 Novel steel plate bin top plate connecting and sealing mode

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008051188A1 (en) * 2008-10-14 2010-04-15 Zeppelin Silos & Systems Gmbh Segmented round-silo consists of round-shaped segment walls, at whose vertical and horizontal front sides profile flanges are arranged, where profile flanges are joined together at angle of ninety degrees
CN202163770U (en) * 2011-05-07 2012-03-14 三一重工股份有限公司 An assembled powder tank
CN108220124A (en) * 2018-03-07 2018-06-29 江苏恒欣仓储设备有限公司 Steel silo formula fermentation tank
CN209145383U (en) * 2018-11-16 2019-07-23 厦门陆威工程机械有限公司 A kind of detachable assembling type silo
CN209943508U (en) * 2019-06-17 2020-01-14 姜起文 Wedge-type radial sealing ring
CN210598344U (en) * 2019-08-12 2020-05-22 河南工业大学 Hybrid connection prefabricated prestressed concrete circular storage bin structure
CN211140361U (en) * 2019-11-30 2020-07-31 山东涵轲尔建设机械有限公司 Split type cement bin

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008051188A1 (en) * 2008-10-14 2010-04-15 Zeppelin Silos & Systems Gmbh Segmented round-silo consists of round-shaped segment walls, at whose vertical and horizontal front sides profile flanges are arranged, where profile flanges are joined together at angle of ninety degrees
CN202163770U (en) * 2011-05-07 2012-03-14 三一重工股份有限公司 An assembled powder tank
CN108220124A (en) * 2018-03-07 2018-06-29 江苏恒欣仓储设备有限公司 Steel silo formula fermentation tank
CN209145383U (en) * 2018-11-16 2019-07-23 厦门陆威工程机械有限公司 A kind of detachable assembling type silo
CN209943508U (en) * 2019-06-17 2020-01-14 姜起文 Wedge-type radial sealing ring
CN210598344U (en) * 2019-08-12 2020-05-22 河南工业大学 Hybrid connection prefabricated prestressed concrete circular storage bin structure
CN211140361U (en) * 2019-11-30 2020-07-31 山东涵轲尔建设机械有限公司 Split type cement bin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653390A (en) * 2021-09-24 2021-11-16 华电重工股份有限公司 Storehouse dome and steel sheet storehouse
CN115030587A (en) * 2022-06-28 2022-09-09 河南实荣筒仓工程有限公司 Novel steel plate bin top plate connecting and sealing mode

Similar Documents

Publication Publication Date Title
CN112012546A (en) Super-huge type full-sealed assembly type industrial steel plate bin
US4698941A (en) Framework for dome-shaped roofs
CN110748157B (en) Silo conical hopper split type combined steel template and construction method thereof
CN111550116A (en) Double-layer socket-and-spigot chimney
CN204456772U (en) The spliced glass fiber reinforced plastic smoke exhaust barrel of arc sheet
CN214313378U (en) Lightweight box structure for power battery
CN206220591U (en) A kind of modular individual layer air-tightness containment system of checking compressed steel construction cooling tower
CN215167340U (en) Quick-mounting energy-saving roof for work shed
CN201472916U (en) Sectional type floating cover of external floating roof tank single-deck buoyancy module
CN105514311A (en) Battery pack housing and battery pack with battery pack housing
CN212405662U (en) Film framework structure of garbage disposal plant
CN106522603A (en) Wind pressure reduction unit type single-layer air-tightness enclosure system of steel structure cooling tower
CN111874471A (en) Novel steel plate bin circumferential sealing device
CN101613020B (en) Blocked floating roof of single deck buoyancy chamber of external floating top tank and design method thereof
CN201494817U (en) Single-disk inner-outer buoyancy module floating roof of external floating-roof tank
CN206681174U (en) A kind of building splice seam sealing fixture construction
CN201756171U (en) Assembly jig technical equipment component for blook-combination construction of a longitudinal bulkhead
CN212359303U (en) Double-layer socket-and-spigot chimney
CN216720682U (en) Modular box-type substation with nonmetal structure
CN204552147U (en) A kind of durable interim firmly canopy
CN214166031U (en) Combined split type cement bin
CN211058423U (en) Freely-detachable foundation connecting seat for granary
CN211200431U (en) Novel steel-concrete composite round open caisson
CN201569116U (en) End flashing structure of ventilator
CN111877829A (en) Novel steel plate bin wall connection and sealing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination