CN202158580U - Energy-saving preheating pipeline - Google Patents

Energy-saving preheating pipeline Download PDF

Info

Publication number
CN202158580U
CN202158580U CN2011202245058U CN201120224505U CN202158580U CN 202158580 U CN202158580 U CN 202158580U CN 2011202245058 U CN2011202245058 U CN 2011202245058U CN 201120224505 U CN201120224505 U CN 201120224505U CN 202158580 U CN202158580 U CN 202158580U
Authority
CN
China
Prior art keywords
sealing
shaped sleeve
tube
preheating
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202245058U
Other languages
Chinese (zh)
Inventor
王一新
黎立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Guangrun Metallic Products Co., Ltd.
Original Assignee
WUXI SHUNTE METAL PRODUCT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI SHUNTE METAL PRODUCT CO Ltd filed Critical WUXI SHUNTE METAL PRODUCT CO Ltd
Priority to CN2011202245058U priority Critical patent/CN202158580U/en
Application granted granted Critical
Publication of CN202158580U publication Critical patent/CN202158580U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

An energy-saving preheating pipeline comprises an air tube, and also comprises a preheating tube and a U-shaped sleeve, wherein one end of the U-shaped sleeve covers the preheating tube, the bottom of the U-shaped sleeve is provided with a sealing end, the upper end of the preheating tube is sealed, the lower end of the preheating tube is sealed so as to be fixedly connected at the bottom of the sealing end, an air discharge tube arranged at the side of the bottom penetrates through the sealing end, the air tube penetrates through the bottom of the sealing end so as to be inserted in the preheating pipe, the sealing end is provided with a smoke outlet, the other end of the U-shaped sleeve is provided with a smoke inlet, the diameter of the smoke outlet is smaller than that of the smoke inlet, and the sealing end and one end of the U-shaped sleeve are connected through a flange structure. The energy-saving preheating pipeline has a simple structure, is easy to realize, and utilizes the waste heat of smoke to heat air transmitted by the air tube through the preheating tube and supplies the heated air to a furnace, so that the combustion efficiency is higher, the use ratio of the furnace is improved, and the consumption and the cost are lowered.

Description

The energy-saving preheating pipeline
Technical field
The utility model relates to a kind of heating furnace, is specifically related to a kind of energy-saving preheating pipeline.
Background technology
In machining, in technical process such as galvanizing, all can use gas furnace and come to carry out to machined part preheating; Usually the pipeline of gas furnace has only and simply advances Gas Pipe, air hose and smoke evacuation tracheae; Combustion gas produces heat energy with air mixing after-combustion heats, yet the flue gas that discharge the burning back all has the above high temperature of 200 degree usually, and this has just caused a large amount of heat-energy losses; Cause bigger waste virtually, improved the production cost of gas consumption and enterprise.
The utility model content
The utility model provides a kind of energy-saving preheating pipeline, can recycle the heat of flue gas, has improved the combustion gas utilization rate, has reduced cost.
For realizing above-mentioned purpose, adopt following technical scheme:
A kind of energy-saving preheating pipeline comprises air hose, also comprises an economizer bank and U-shaped sleeve pipe; Said U-shaped sleeve pipe one end shield is on economizer bank, and its bottom is equipped with a sealing termination, the sealing of economizer bank upper end; The lower end sealing is fixed in the sealing head bottom part; Have an escape pipe to pass the sealing termination in sides, said air hose passes from the sealing head bottom part and is inserted in the economizer bank, and the sealing termination is provided with an exhanst gas outlet; The U-shaped sleeve pipe other end has smoke inlet, and exhanst gas outlet relative aperture smoke inlet bore is little.
As the preferred version of the utility model, respectively there is flange arrangement at said U-shaped sleeve pipe two ends, and the sealing termination is connected with flange arrangement with U-shaped Guan Yiduan.
The utility model is through adopting a U-shaped sleeve pipe and economizer bank, supplies with burner after the air heat that the waste heat that utilizes flue gas feeds air hose through economizer bank, makes efficiency of combustion higher, improved the burner utilization rate, reduced consumption, reduced cost.
Description of drawings
According to embodiment and accompanying drawing the utility model is done further explain below.
Fig. 1 is the utility model general structure sketch map;
Among the figure:
1, air hose; 2, economizer bank; 3, U-shaped sleeve pipe; 4, flange; 5, exhanst gas outlet; 6, sealing termination; 7, inlet of cold air; 8, escape pipe; 9, smoke inlet; 10, flange.
The specific embodiment
As shown in Figure 1, provided the described specific embodiment of the utility model, among the figure; U-shaped sleeve pipe 3 one end shields are on economizer bank 2, and its bottom is equipped with a sealing termination 6, the sealing of economizer bank 2 upper ends; The lower end sealing is fixed in sealing 6 bottoms, termination, has an escape pipe 8 to pass sealing termination 6 in sides, and air hose 1 passes from sealing 6 bottoms, termination and is inserted in the economizer bank 2; Sealing termination 6 is provided with an exhanst gas outlet 5, and U-shaped sleeve pipe 3 other ends have smoke inlet 9, and exhanst gas outlet 5 relative aperture smoke inlets 9 bores are little; Respectively there are flange 4 structures at U-shaped sleeve pipe 3 two ends, and sealing termination 6 is connected with flange 4 with U-shaped sleeve pipe 3 one ends.
Can the smoke inlet end of U-shaped sleeve pipe 3 be connected to the exhanst gas outlet of burner; The outlet of escape pipe 8 is connected to the burner combustion chamber, and flue gas gets into U-shaped sleeve pipe 3 along the direction of arrow, and its waste heat is with economizer bank 2 heating; The air that gets into economizer bank 2 bottoms through air hose 1 is by economizer bank 2 heating; Through escape pipe 8 entering combustion chambers,, improved the efficiency of combustion of combustion gas then through behind the air and combustion gas mixing of preheating.
The utility model is simple in structure, is easy to realize, through adopting a U-shaped sleeve pipe and economizer bank; Supply with burner after the air heat that the waste heat that utilizes flue gas feeds air hose through economizer bank; Make efficiency of combustion higher, improved the burner utilization rate, reduced consumption; Reduce cost, improved the performance of enterprises.

Claims (2)

1. an energy-saving preheating pipeline comprises air hose, it is characterized in that; Also comprise an economizer bank and U-shaped sleeve pipe, said U-shaped sleeve pipe one end shield is on economizer bank, and its bottom is equipped with a sealing termination; The sealing of economizer bank upper end, the lower end sealing is fixed in the sealing head bottom part, has an escape pipe to pass the sealing termination in sides; Said air hose passes from the sealing head bottom part and is inserted in the economizer bank; The sealing termination is provided with an exhanst gas outlet, and the U-shaped sleeve pipe other end has smoke inlet, and exhanst gas outlet relative aperture smoke inlet bore is little.
2. a kind of energy-saving preheating pipeline according to claim 1 is characterized in that, respectively there is flange arrangement at said U-shaped sleeve pipe two ends, and the sealing termination is connected with flange arrangement with U-shaped Guan Yiduan.
CN2011202245058U 2011-06-29 2011-06-29 Energy-saving preheating pipeline Expired - Fee Related CN202158580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202245058U CN202158580U (en) 2011-06-29 2011-06-29 Energy-saving preheating pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202245058U CN202158580U (en) 2011-06-29 2011-06-29 Energy-saving preheating pipeline

Publications (1)

Publication Number Publication Date
CN202158580U true CN202158580U (en) 2012-03-07

Family

ID=45766219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202245058U Expired - Fee Related CN202158580U (en) 2011-06-29 2011-06-29 Energy-saving preheating pipeline

Country Status (1)

Country Link
CN (1) CN202158580U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367956A (en) * 2011-06-29 2012-03-07 无锡舜特金属制品有限公司 Energy-saving preheating pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367956A (en) * 2011-06-29 2012-03-07 无锡舜特金属制品有限公司 Energy-saving preheating pipeline

Similar Documents

Publication Publication Date Title
CN203949519U (en) A kind of biological fuel gas Industrial Stoves combustion system with flue gas waste heat-recovering
CN202158579U (en) Energy-saving furnace
CN202158580U (en) Energy-saving preheating pipeline
CN101428958A (en) Glass fibre tank furnace channel oxygen combustion method
CN102364251A (en) Energy-saving furnace
CN202083238U (en) Novel combustion air preheating system of galvanizing furnace
CN102367956A (en) Energy-saving preheating pipeline
CN202793121U (en) Novel high-efficiency superconductive heat pipe flue smoke residual heat collector
CN202482413U (en) Energy-saving system for inward purging steam boiler of hot-dipped-galvanized production line
CN202660945U (en) Coil type waste heat utilization device of smoke tube of thermal treatment furnace
CN206787031U (en) A kind of UTILIZATION OF VESIDUAL HEAT IN energy-saving steam boiler
CN201731617U (en) Horizontal pipe array hot water boiler
CN104913498A (en) High-efficiency energy-saving normal-pressure horizontal super-conducting gas boiler
CN204358777U (en) A kind of Household boiler with honeycomb briquette as fuel
CN203443097U (en) Energy-saving environment-friendly boiler
CN204301291U (en) A kind of gas fired-boiler
CN201724202U (en) High-efficiency recycling device for waste heat of boiler tail gas
CN201992805U (en) Tank liquid direct heating device
CN202024602U (en) Novel gas pipe type furnace
CN201935383U (en) High-efficiency hot blast stove
CN202835753U (en) Circulating preheating type diesel heater
CN208269186U (en) A kind of heated by natural gas system
CN202626113U (en) Asphalt heating tank
CN202066203U (en) Gas-fired water boiler
CN202546726U (en) Boiler combustor tail waste heat utilization device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUXI GUANGRUN METALLIC PRODUCTS CO., LTD.

Free format text: FORMER OWNER: WUXI SHUNTE METAL PRODUCT CO., LTD.

Effective date: 20130822

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130822

Address after: 214000 Jiangsu city of Wuxi province Qiaoshun Qian Ke Cun

Patentee after: Wuxi Guangrun Metallic Products Co., Ltd.

Address before: 214000 Jiangsu province Wuxi city Huishan District Industrial Zone Outang Shunte metal company

Patentee before: Wuxi Shunte Metal Product Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20140629

EXPY Termination of patent right or utility model