CN204301291U - A kind of gas fired-boiler - Google Patents

A kind of gas fired-boiler Download PDF

Info

Publication number
CN204301291U
CN204301291U CN201420670079.4U CN201420670079U CN204301291U CN 204301291 U CN204301291 U CN 204301291U CN 201420670079 U CN201420670079 U CN 201420670079U CN 204301291 U CN204301291 U CN 204301291U
Authority
CN
China
Prior art keywords
boiler
combustion chamber
water
communicated
smoke box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420670079.4U
Other languages
Chinese (zh)
Inventor
蔡军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Taihe Environmental Protection And Energy Saving Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420670079.4U priority Critical patent/CN204301291U/en
Application granted granted Critical
Publication of CN204301291U publication Critical patent/CN204301291U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of gas fired-boiler, comprise boiler shell, be positioned at the combustion chamber below boiler internal, the fire door just right with combustion chamber, the smoke box of built-in three return structures, the smoke pipe be connected with smoke box and boiler intracavity, combustion chamber runs through to have to organize the inner conduit be connected with boiler intracavity more near the position of inwall, outside combustion chamber, sleeve pipe is set, inside pipe casing is provided with several and is communicated with inner conduit and forms the cannula cavity of water channel with inner conduit, boiler intracavity is communicated with the cannula cavity being positioned at water channel one end, the cannula cavity being positioned at the water channel other end is communicated with extraneous, smoke box and fire door are respectively equipped with to be communicated with and are provided with smoke box water pipe and short piece in boiler, water filling port is positioned at above boiler.The utility model makes the heat heating surface area of combustion gas in combustion chamber and smoke pipe increase, and have employed the forced circulation outside combustion chamber, and the water of the identical initial temperature of heating equal in quality, saves combustion gas more than 5%, and the heat time shortens, and utilization rate and efficiency all have a distinct increment.

Description

A kind of gas fired-boiler
Technical field
The utility model relates to boiler technology, is specifically related to a kind of gas fired-boiler.
Background technology
Along with the development of combustion gas industry and the extensive use of gas fired-boiler, right gas fired-boiler technical requirement is also more and more higher.In known technology, the combustion chamber of existing gas fired-boiler is mainly light wall and waveform locular wall, and the heat conduction efficiency of light wall is low, and waveform process chamber is complicated, difficult quality guarantee.The locular wall that gas gun is just right simultaneously adopts refractory material usually, and also do not have energy recycle device between combustion chamber and flue, this part is in the flame envelope of flame, and such structure causes waste huge on the energy.
Summary of the invention
The utility model realizes by the following technical solutions: a kind of gas fired-boiler, comprise boiler shell, be positioned at the combustion chamber below boiler internal, smoke pipe that the smoke box of the fire door just right with combustion chamber, built-in three return structures is connected with smoke box and boiler intracavity, described combustion chamber runs through to have to organize the inner conduit be connected with boiler intracavity more near the position of inwall, water in inner conduit is applied in combustion chamber inner chamber, do not affect combustion gas normal combustion, increase heating surface area.
Preferably, outside described combustion chamber, sleeve pipe is set, inside pipe casing is provided with several and is communicated with inner conduit and forms the cannula cavity of water channel with inner conduit, boiler intracavity is communicated with the cannula cavity being positioned at water channel one end, the cannula cavity being positioned at the water channel other end is communicated with extraneous, cannula cavity and inner conduit composition water channel, make boiler intracavity water discharge boiler after outer wall of combustion chamber flowing heating.
Preferably, some smoke box water pipes be connected with boiler intracavity are provided with the smoke box inwall place of junction, combustion chamber.
Preferably, be provided with some short pieces be communicated with boiler intracavity by external pipe near fire door inwall place inside described fire door, it is higher that smoke box and fire door place accept flame energy, is provided with pipeline herein and at utmost can utilizes heat.
Preferably, described inner conduit is 4 groups, and about described combustion chamber, two groups vertically arrange, and is that one end is inclined upwardly setting at upper and lower two groups, vertically and be obliquely installed can make water be heated after convection circulation up and down.
Preferably, boiler water filling port is positioned at upper boiler, and top water filling can make water first through the preheating of smoke pipe, more makes full use of waste heat.
Usefulness of the present utility model is that the heat heating surface area that many water pipe structures make combustion gas in combustion chamber and smoke pipe increases, Energy harvesting for the direct-fired fire door of combustion gas and flue is more scientific and reasonable, make water forced circulation outside combustion chamber, the water of the identical initial temperature of heating equal in quality, save combustion gas more than 5%, heat time shortens, utilization rate and efficiency all have lifting, and water pipe can adopt with miscellaneous part connected mode and welds various ways such as casting, reduce difficulty of processing, save production cost.
Accompanying drawing explanation
The master of embodiment illustrated in fig. 1 one looks sectional structure schematic diagram.
The section of combustion chamber structural representation of embodiment illustrated in fig. 2 one.
The section of combustion chamber structural representation of embodiment illustrated in fig. 3 two.
1. combustion chambers, 2. smoke box, 3. fire door, 4. sleeve pipe in figure, 41. cannula cavity, 5. short piece, 51. outlet pipes, 6. smoke box water pipe, 7. inner conduit, 8. boiler intracavity, 9. smoke pipe.
Detailed description of the invention
Embodiment one:
The structural representation of embodiment 1 and section of combustion chamber structural representation as depicted in figs. 1 and 2, a kind of gas fired-boiler comprises boiler shell, be positioned at the combustion chamber 1 below boiler internal, the fire door 3 just right with combustion chamber, the smoke box 2 of three built-in return structures and the smoke pipe 9 be communicated with smoke box, it is boiler intracavity 8 above combustion chamber 1, in combustion chamber 1, the inner place near inwall is provided with 4 groups of inner conduits 6, the left and right sides, combustion chamber 1 water pipe is vertically placed, be that one end is inclined upwardly setting in upper and lower both sides, inner conduit 6 can make water and combustion chamber contact area increase when not affecting gas flame normal combustion, improve heat transfer efficiency, smoke box 2 is provided with some smoke box water pipes 6 in the place near combustion chamber 1 end, the inwall of fire door 3 is provided with many short pieces 5, short piece 5 is communicated with boiler intracavity 8 by pipeline outside boiler, the direct heating of flame can be accepted, end in combustion chamber 1 of the flame of fuel gas buring and fire door 3 place have very high heat, arrange at this heat that water pipe effectively can utilize flame envelope part.The present embodiment water circulation is: combustion chamber is heated, the water convection circulation in inner conduit; Near combustion chamber, water temperature improves, and forms water circulation at boiler intracavity.The endless form of this embodiment is Natural Circulation, relies on the heat temperature raising of water to realize convection current, increases than traditional combustion chamber heating surface (area) (HS.
Embodiment two:
If Fig. 2 is the utility model embodiment two section of combustion chamber structural representation, compared with embodiment 1, one deck sleeve pipe 4 is added outside combustion chamber 1, be provided with between combustion chamber 1 and sleeve pipe 4 some by inner conduit 7 and and inner conduit 7 be combined to form the cannula cavity 41 of continuous water channel, being opened by the two ends baffle for separating of one or more water pipes among inner conduit 7 specifically makes it be connected according to pre-designed circuit, so just forms water channel with cannula cavity 41.One end of water channel is communicated with described boiler intracavity 8, and the other end is communicated with boiler delivery port by the outlet pipe 51 be located on affiliated sleeve pipe.The endless form of the present embodiment water is: water enters boiler intracavity 8 and carries out preheating at top flue 9 place after entering the water inlet on top, then the water channel formed by sleeve pipe 4, combustion chamber 1, water-stop sheet 41 and inner conduit 7 through the water of preheating is flowed, flowed out from delivery port by outlet pipe 51 after chamber wall circulation, complete whole circulation.This embodiment adopts forced circulation, make water in combustion chamber, keep flowing as much as possible, one whole boiler water to have been heated releasing different from tradition, heating energy through preheating and chamber wall keeps continuously hot water to flow out, substantially increase boiler efficiency, such as initial temperature is that 1 ton of water of 18 DEG C is heated to 42 DEG C, and plain cylindrical furnace needs the combustion gas of 4 ~ 5 cubic metres, and the boiler using the present embodiment to provide only needs the combustion gas of about 3 cubic metres, Be very effective.
The utility model can increase the heating surface (area) (HS of water effectively, the flue that rear end, Appropriate application combustion chamber temperature is higher and fire door heat, water is convection circulation in water pipe, after improvement, forced circulation makes current more scientific and reasonable, effectively can transmit temperature, the utilization rate of combustion gas can be made effectively to be promoted, simultaneously because water pipe adopts multiple processing mode, reduce production cost.

Claims (6)

1. a gas fired-boiler, comprise boiler shell, be positioned at the combustion chamber (1) of boiler lower inner, the smoke box (2) of the fire door just right with combustion chamber (3), built-in three return structures, the smoke pipe (9) be connected with smoke box and boiler intracavity (8), it is characterized in that: described combustion chamber (1) inner position near inwall runs through to have to organize the inner conduit (7) be connected with boiler intracavity (8) more.
2. gas fired-boiler according to claim 1, it is characterized in that: sleeve pipe (4) is set outside described combustion chamber (1), sleeve pipe (4) inside is provided with several and is communicated with inner conduit (7) and forms the cannula cavity (41) of water channel with inner conduit (7), boiler intracavity (8) is communicated with the cannula cavity being positioned at water channel one end, and the cannula cavity being positioned at the water channel other end is communicated with extraneous.
3. gas fired-boiler according to claim 1 and 2, is characterized in that: be provided with some smoke box water pipes (6) be connected with boiler intracavity (8) with smoke box (2) the inwall place of combustion chamber (1) junction.
4. gas fired-boiler according to claim 3, is characterized in that: described fire door (3) inner side is provided with some short pieces (5) be communicated with boiler intracavity (8) by external pipe near fire door inwall place.
5. gas fired-boiler according to claim 1, is characterized in that: described inner conduit (7) is 4 groups, vertically arranges two groups, described combustion chamber (1) left and right, is that one end is inclined upwardly setting at upper and lower two groups.
6. gas fired-boiler according to claim 4, is characterized in that: boiler water filling port is positioned at upper boiler.
CN201420670079.4U 2014-11-12 2014-11-12 A kind of gas fired-boiler Active CN204301291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420670079.4U CN204301291U (en) 2014-11-12 2014-11-12 A kind of gas fired-boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420670079.4U CN204301291U (en) 2014-11-12 2014-11-12 A kind of gas fired-boiler

Publications (1)

Publication Number Publication Date
CN204301291U true CN204301291U (en) 2015-04-29

Family

ID=53106824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420670079.4U Active CN204301291U (en) 2014-11-12 2014-11-12 A kind of gas fired-boiler

Country Status (1)

Country Link
CN (1) CN204301291U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353320A (en) * 2022-01-15 2022-04-15 芜湖能量热能设备有限公司 Heat recovery device in combustion furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353320A (en) * 2022-01-15 2022-04-15 芜湖能量热能设备有限公司 Heat recovery device in combustion furnace

Similar Documents

Publication Publication Date Title
CN204301291U (en) A kind of gas fired-boiler
CN105020703B (en) A kind of burner
CN205425020U (en) Heating stove with combustion -supporting device of oxyhydrogen
CN205717857U (en) Two-tube heating hot exchanger
CN203768418U (en) Metal component heating furnace
CN202485194U (en) Totally-enclosed safe energy-saving type biogas boiler
CN207585082U (en) A kind of π types fuel vapor organic heat carrier furnace
CN204227688U (en) A kind of gas-fired boiler
CN203068788U (en) Crude oil preheating device
CN212512532U (en) Tunnel cave waste heat secondary drying device
CN104152637B (en) A kind of aluminum aging furnace continuously
CN204084833U (en) A kind of coal heating heating stove
CN204648988U (en) Single excellent heating furnace hot-gas recoverer
CN206496332U (en) A kind of combustion furnace extracted for fir essential oil
CN203190630U (en) Energy-saving hot blast heater
CN204358777U (en) A kind of Household boiler with honeycomb briquette as fuel
CN204786418U (en) Be applied to I type two -stage heat exchanger of radiant tube nozzle
CN204187819U (en) A kind of boiler
CN204227920U (en) A kind of furnace construction with heat recovery function
CN203177650U (en) Integrated energy-saving shuttle kiln
CN206496333U (en) A kind of vapor heat riser produced for fir essential oil
CN206875727U (en) A kind of grain drier oil burner
CN202492549U (en) Device for ductile iron pipe annealing furnace
CN201637093U (en) High efficiency hot water furnace
CN202066183U (en) Gas type water boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180510

Address after: 276013 Zhou Jing Pu village, Yitang Town, Lanshan District, Linyi, Shandong

Patentee after: Linyi Taihe environmental protection and energy saving Technology Co., Ltd.

Address before: 276000 Feixian County, Linyi, Shandong

Patentee before: Cai Jun