CN202158295U - Assembly connection structure - Google Patents

Assembly connection structure Download PDF

Info

Publication number
CN202158295U
CN202158295U CN2011202339093U CN201120233909U CN202158295U CN 202158295 U CN202158295 U CN 202158295U CN 2011202339093 U CN2011202339093 U CN 2011202339093U CN 201120233909 U CN201120233909 U CN 201120233909U CN 202158295 U CN202158295 U CN 202158295U
Authority
CN
China
Prior art keywords
annular protrusion
steel pipe
annular
metallic sheath
sebific duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202339093U
Other languages
Chinese (zh)
Inventor
夏迎松
张培勇
唐之胜
陈小勇
汪计华
关毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhongding Keumah Auto Hose and Pipe Assembly Co Ltd
Original Assignee
Anhui Zhongding Keumah Auto Hose and Pipe Assembly Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhongding Keumah Auto Hose and Pipe Assembly Co Ltd filed Critical Anhui Zhongding Keumah Auto Hose and Pipe Assembly Co Ltd
Priority to CN2011202339093U priority Critical patent/CN202158295U/en
Application granted granted Critical
Publication of CN202158295U publication Critical patent/CN202158295U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an assembly connection structure, which comprises a steel tube (1), a metal sleeve (2) and a rubber tube (3). A first annular protrusion (4) is arranged at the end portion of the steel tube (1), and a second annular protrusion (5) and an annular check ring (6) are sequentially arranged at the positions of the steel tube from the end portion to inside. The metal sleeve (2) is sleeved on the periphery of the steel tube (1), and the diameter reducing part of the metal sleeve is located between the second annular protrusion (5) and the annular check ring (6). The rubber tube (3) is located between the steel tube (1) and the metal sleeve (2) and sleeved on the periphery of the section from the first annular protrusion (4) to the second annular protrusion (5). The metal sleeve (2) is tightly pressed and matched with the first annular protrusion (4) section and the second annular protrusion (5) section to achieve the assembly connection of the steel tube (1) and the rubber tube (3). The assembly connection structure has higher bearing pressure and excellent sealing performance and working reliability.

Description

A kind of assembling linkage structure
Technical field
The utility model relates to component mounting technology field, relates in particular to a kind of assembling linkage structure.
Background technique
In the existing technology; It with the linkage structure of steel pipe is automobile oil pipe in assembling: one of the termination welding that is connected at steel pipe becomes T-joint; The one-tenth T-joint of steel pipe is inserted in the sebific duct; And adopting a metallic sheath that sebific duct is locked on the steel pipe, above-mentioned one-tenth T-joint and metallic sheath all form through the metal machining.In this assembly process, complicated, many, the waste of material of manufacturing procedure of assembling linkage structure, thus increased the cost that assembles.
Improvement as said structure; Annular protrusion of connection end moulding at steel pipe is with sebific duct in the outside of annular protrusion section, and the sebific duct outer installment that is enclosed within the annular protrusion section has metallic sheath; And the both sides of the corresponding steel pipe annular protrusion of metallic sheath are provided with contraction flow region; Sebific duct is locked on the steel pipe, and wherein, metallic sheath adopts stamping forming mode.This assembly structure can solve problems such as oil pipe assembling linkage structure complicacy, waste material, manufacturing procedure are many, increase cost of production.
But for the part vehicle, the pressure in its oil pipe is higher, and is bigger to the impact of oil pipe joint, thereby the sealability of oil pipe joint is had higher requirement.Above-mentioned improved oil pipe Placement, for the applied environment of high pressure, elevated operating temperature, its sealability and functional reliability still can not satisfy the demands.Therefore, design oil pipe assembling linkage structure,, become those skilled in the art assistant officer's technical problem to be solved to satisfy application demand with high pressure or hyperpressure impact with excellent sealing performance and functional reliability.
The model utility content
To above defective, the purpose of the utility model is to provide a kind of assembling linkage structure, and it has the higher pressure that bears, and sealability and functional reliability are superior.
To achieve these goals, the technological scheme of the utility model is following:
A kind of assembling linkage structure; Comprise steel pipe 1; Metallic sheath 2 and sebific duct 3 are provided with first annular protrusion 4 in the end of steel pipe 1, inwardly be disposed with second annular protrusion 5 and annular retaining ring 6 by the end; Metallic sheath 2 is set in the periphery of steel pipe 1; And its reduced diameter portion places between second annular protrusion 5 and the annular retaining ring 6, and sebific duct 3 is between steel pipe 1 and the metallic sheath 2 and is sheathed on first annular protrusion 4 and the periphery of 5 sections of second annular protrusions, with metallic sheath 3 compression fit 4 sections of two annular protrusions of steel pipe 1 to realize that steel pipe 1 is connected with the assembling of sebific duct 3.
Preferably, the reduced diameter portion compression fit of metallic sheath 3 is 6 sections of second annular protrusion 5 to the annular retaining rings of steel pipe 1.
Compared with prior art, the utlity model has following beneficial effect:
In the utility model; Glue pipe socket is located at two annular protrusion sections of steel pipe, and is provided with metallic sheath in the outer race of the sebific duct of two annular protrusion sections, and extends to the annular retaining ring place; The metallic sheath compression fit realizes that in first annular protrusion to the annular retaining ring section of steel pipe steel pipe is connected with the assembling of sebific duct; Like this, between steel pipe and the sebific duct and the pulling-out force that is connected between metallic sheath and the steel pipe increase, increased a seal point in terms of existing technologies between steel pipe and the sebific duct; The reliability of connection is strengthened greatly, thereby can adapt to higher pressure and wideer temperature range.
Description of drawings
According to embodiment and accompanying drawing the utility model is done further explain below.
A kind of structural representation that assembles linkage structure that Fig. 1 proposes for the utility model.
A kind of generalized section of assembling linkage structure that Fig. 2 proposes for the utility model.
Reference character: 1, steel pipe; 2, metallic sheath; 3, sebific duct; 4, the first annular protrusions; 5, the second annular protrusions; 6, annular retaining ring.
Embodiment
Be illustrated in figure 1 as a kind of structural representation that assembles linkage structure that the utility model embodiment proposes, a kind of generalized section of assembling linkage structure that Fig. 2 proposes for the utility model embodiment.
With reference to accompanying drawing; A kind of assembling linkage structure that the utility model proposes comprises steel pipe 1, metallic sheath 2 and sebific duct 3; Be provided with first annular protrusion 4 in the end of steel pipe 1; Inwardly be disposed with second annular protrusion 5 and annular retaining ring 6 by the end, metallic sheath 2 is set in the periphery of steel pipe 1, and its reduced diameter portion places between second annular protrusion 5 and the annular retaining ring 6; Sebific duct 3 is between steel pipe 1 and the metallic sheath 2 and is sheathed on first annular protrusion 4 and the periphery of 5 sections of second annular protrusions, with metallic sheath 2 compression fit 4 sections of two annular protrusions of steel pipe 1 to realize that steel pipe 1 is connected with the assembling of sebific duct 3.Preferably, the reduced diameter portion compression fit of metallic sheath 2 is 6 sections of second annular protrusion 5 to the annular retaining rings of steel pipe 1.
Need to prove that the appeal metallic sheath can divide not two-part, wherein the less part of internal diameter is a reduced diameter portion, and it is set between second annular protrusion to the annular retaining ring of steel pipe, and reduced diameter portion cooperates with steel pipe like this; And the bigger part of internal diameter is set between first annular protrusion and second annular protrusion of steel pipe; Sebific duct is arranged between steel pipe and the metallic sheath and is sheathed on first annular protrusion and the periphery of the second annular protrusion section, realizes that through steel pipe is radially locked steel pipe is connected with the assembling of sebific duct.Wherein, first annular protrusion of steel pipe, second annular protrusion and annular retaining ring structure can form through the shaping die extruding.
In concrete application process, can be connected with assembling between the sebific duct with the realization steel pipe through following operation.As shown in Figure 2; At first metallic sheath 2 is enclosed within on the steel pipe 1; Metallic sheath 2 withstands on annular retaining ring 6 places; This moment metallic sheath the reducing position between second annular protrusion 5 and annular retaining ring 6, be inserted into sebific duct 35 sections of first annular protrusion 4 and second annular protrusions of steel pipe again, the front end of sebific duct 3 pushes up the reduced diameter portion of metallic sheath 2.
Like this, the outer surface of the metallic sheath 2 of 5 sections of first annular protrusion 4 and second annular protrusions is radially locked, form contraction flow region, then metal steel pipe 1 links together with sebific duct 3 very securely, and sebific duct 3 is blocked by two annular portions of steel pipe 1, and difficult quilt pulls.In addition, the outer surface of the metallic sheath 2 between second annular protrusion 5 and the annular retaining ring 6 is radially locked, make it tightly encase steel pipe 1, blocked by second annular protrusion 5 of steel pipe 1 simultaneously, difficult quilt pulls.
When metallic sheath 2 is radially locked; During near second annular protrusion 5 of steel pipe 1 sebific duct 3 pressurizeds, sizing material will extend forward, has been full of the gap between metallic sheath 2 and the steel pipe 1; Strengthen sealing greatly, thereby can adapt to higher pressure and wideer temperature range.
Combine accompanying drawing that the utility model has been carried out exemplary description above; Obviously the realization of the utility model does not receive the restriction of aforesaid way; As long as adopted method design of the utility model and the various improvement that technological scheme is carried out; Or the design of the utility model and technological scheme are directly applied to other occasion without improving, all in the protection domain of the utility model.

Claims (2)

1. one kind is assembled linkage structure; Comprise steel pipe (1), metallic sheath (2) and sebific duct (3) is characterized in that; Be provided with first annular protrusion (4) in the end of steel pipe (1); Inwardly be disposed with second annular protrusion (5) and annular retaining ring (6) by the end, metallic sheath (2) is set in the periphery of steel pipe (1), and its reduced diameter portion places between second annular protrusion (5) and the annular retaining ring (6); Sebific duct (3) is between steel pipe (1) and the metallic sheath (2) and is sheathed on first annular protrusion (4) and the periphery of second annular protrusion (5) section, and two annular protrusions (4) section of metallic sheath (2) compression fit at steel pipe (1) is connected with the assembling of sebific duct (3) to realize steel pipe (1).
2. assembling linkage structure as claimed in claim 1 is characterized in that, the reduced diameter portion compression fit of metallic sheath (2) is in second annular protrusion (5) to annular retaining ring (6) section of steel pipe (1).
CN2011202339093U 2011-07-05 2011-07-05 Assembly connection structure Expired - Fee Related CN202158295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202339093U CN202158295U (en) 2011-07-05 2011-07-05 Assembly connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202339093U CN202158295U (en) 2011-07-05 2011-07-05 Assembly connection structure

Publications (1)

Publication Number Publication Date
CN202158295U true CN202158295U (en) 2012-03-07

Family

ID=45765935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202339093U Expired - Fee Related CN202158295U (en) 2011-07-05 2011-07-05 Assembly connection structure

Country Status (1)

Country Link
CN (1) CN202158295U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103566989A (en) * 2013-11-08 2014-02-12 邢皓宇 Transfer pipette
CN111379912A (en) * 2020-04-08 2020-07-07 广东美的制冷设备有限公司 Working medium pipe connecting structure, assembling method thereof, connecting pipe assembly and automobile air conditioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103566989A (en) * 2013-11-08 2014-02-12 邢皓宇 Transfer pipette
CN103566989B (en) * 2013-11-08 2016-01-20 邢皓宇 A kind of pipette
CN111379912A (en) * 2020-04-08 2020-07-07 广东美的制冷设备有限公司 Working medium pipe connecting structure, assembling method thereof, connecting pipe assembly and automobile air conditioner
CN111379912B (en) * 2020-04-08 2024-03-26 广东美的制冷设备有限公司 Working medium pipe connecting structure, assembling method thereof, connecting pipe assembly and automobile air conditioner

Similar Documents

Publication Publication Date Title
CN100554717C (en) Combined ball hinged and the making assembling method of a kind of flexuose
CN202158295U (en) Assembly connection structure
CN111795103A (en) Two-way high damping hydraulic pressure sub vehicle frame bush and car
CN201866446U (en) Connecting structure of automobile steering oil tube
CN202165732U (en) Connecting structure for sealing
CN2828513Y (en) Wire wrapped superhigh-pressure hose assembly
CN201386876Y (en) Automobile oil pipe connecting mechanism
CN2795550Y (en) Automobile shock reducer hanging ring with inner bush
CN201723856U (en) Core pipe and automobile air conditioner hose assembly containing the same
CN201221656Y (en) Connecting structure of automobile oil conduit
JP2007309232A (en) High pressure fuel injection pipe including connecting head part and method for manufacturing same
CN101469798A (en) Sealing structure of diesel low-voltage fuel metal oil conduit and mounting method thereof
CN102518886A (en) High-temperature resisting oil pipe connection structure for engine
CN212338006U (en) Two-way high damping hydraulic pressure sub vehicle frame bush and car
CN201209718Y (en) Tube end structure for enhancing sealing performance and assembling performance
CN202418953U (en) High-temperature-resistant oil tube connection structure for engine
CN202274224U (en) Oil pipe connection structure for automobile
CN206398082U (en) A kind of steering gear input shaft sealing sheath structure
CN202338710U (en) Oil return pipe connecting device for turbocharger
CN201003666Y (en) Automobile oil pipe connection structure
CN205207652U (en) Vehicle air conditioner is seal structure for system
CN2864297Y (en) Metal joint for brake flexible pipe assembly
CN201521737U (en) Connecting structure of automobile power steering oil return pipe
CN203431357U (en) Rubber pipe connecting structure of auto oil pipe
CN201330899Y (en) Automobile oil pipe connecting structure riveted with flange sheet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20160705