CN202148513U - High pile beam plate type dock remedy structure with malposed sunk piles - Google Patents

High pile beam plate type dock remedy structure with malposed sunk piles Download PDF

Info

Publication number
CN202148513U
CN202148513U CN201120244606U CN201120244606U CN202148513U CN 202148513 U CN202148513 U CN 202148513U CN 201120244606 U CN201120244606 U CN 201120244606U CN 201120244606 U CN201120244606 U CN 201120244606U CN 202148513 U CN202148513 U CN 202148513U
Authority
CN
China
Prior art keywords
dock
piles
sunk
harbour
malposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120244606U
Other languages
Chinese (zh)
Inventor
费康一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201120244606U priority Critical patent/CN202148513U/en
Application granted granted Critical
Publication of CN202148513U publication Critical patent/CN202148513U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a high pile beam plate type dock remedy structure with malposed sunk piles, which comprises dock cross beams, dock longitudinal beams, sunk piles and malposed piles, wherein the dock cross beams are T-shaped and fixedly arranged on the sunk piles, and the dock longitudinal beams are reinforced concrete pre-cast beams which are arranged on the dock cross beams in parallel. The high pile beam plate type dock remedy structure is characterized in that the dock cross beams on the malposed sunk piles are provided with two adjacent crosscast-in-place quadrature reinforced longitudinal beams in the normal direction, and the structure that the malposed sunk piles are coated by the reinforced longitudinal beams, and the reinforced longitudinal beams, the sunk piles and the dock cross beams are in a whole is adopted. Compare with the prior art, the high pile beam plate type dock remedy structure has optimized structure force applying, and good wholeness, greatly reduces steel concrete consumption of members, is beneficial to reducing the construction costs, better adopts the remedy structure for solving larger offposition than an allowed offposition in construction of dock sunk piles on water.

Description

The high-pile beam formula harbour of pile sinking dislocation is remedied structure
Technical field
The utility model relates to high-pile beam formula harbour building technology field, and specifically a kind of being used for remedied structure because of the high-pile beam formula harbour of construction pile sinking dislocation.
Background technology
At present, the pile sinking of conventional high-pile beam formula harbour pile foundation is 200 millimeters by the permission off normal of current specifications pile sinking waterborne; Generally make the off normal of pile sinking up less than the method for 200 millimeters adopted part expansion crossbeam width for off normal; But for greater than 200 millimeters pile sinking off normal, generally all adopts the method for mending pile sinking to handle on the engineering, the benefit pile sinking must pull out the pile sinking of off normal; Again award the benefit pile sinking then; Mend pile sinking and not only take a lot of work, take material, also increase engineering construction cost, influence the duration.
The utility model content
The purpose of the utility model is that the high-pile beam formula harbour of a kind of pile sinking dislocation of designing to the deficiency of prior art is remedied structure; The crossbeam normal direction that it is employed in pile sinking off normal place increases by the adjacent two cast-in-place quadratures of striding and strengthens longeron, carries out structure and remedies to wrap full off normal stake, thereby avoided mending the loss that pile sinking brought; Convenient construction; It is good to remedy structural integrity, has significantly reduced the steel concrete material consumption of member, helps reducing construction costs.
The concrete technical scheme that realizes the utility model purpose is: a kind of high-pile beam formula harbour of pile sinking dislocation is remedied structure; Comprise harbour crossbeam, harbour longeron, pile sinking and dislocation pile sinking; The harbour crossbeam is the T-shape beam that is fixedly installed on the pile sinking; The harbour longeron is the reinforced concrete prefabricated beam that is set in parallel on the harbour crossbeam; Be characterized in that harbour crossbeam normal direction at the dislocation pile sinking is provided with the adjacent two cast-in-place quadratures of striding and strengthens longeron, with strengthen longeron bag completely wrong position pile sinking and with pile sinking and harbour crossbeam be the holistic structure of remedying.
The utility model compared with prior art has the following advantages:
The structure stress optimization that ① ﹑ remedies, good integrity, and reduced the steel concrete material consumption of member, help reducing construction costs;
② ﹑ can adapt to various construction situations, and the cost that increases can effectively be regulated and control strong operability;
The intensity that ③ ﹑ does not influence the harbour crossbeam can satisfy instructions for use, and the piling construction waterborne that has solved preferably because of harbour takes place greater than a kind of reinforcement of remedying that allows off normal to adopt.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 2.
The specific embodiment
Consult accompanying drawing 1; The utility model comprises: harbour crossbeam 1, harbour longeron 2, pile sinking 3 and dislocation pile sinking 4; Harbour crossbeam 1 is for being fixedly installed on the T-shape beam on the pile sinking 3; Harbour longeron 2 is for being set in parallel in the reinforced concrete prefabricated beam on the harbour crossbeam 1; In the normal direction of the harbour crossbeam 1 at dislocation pile sinking 4 places the adjacent two cast-in-place quadratures of striding are set and strengthen longeron 5, strengthen longeron 5 with wrap completely wrong position pile sinking 4 and with pile sinking 3 be an integrated member with harbour crossbeam 1, structure is carried out in the pile sinking dislocation of high-pile beam formula harbour remedies; Reducing the loss that brings because of the pile sinking dislocation, the utility model can be to off normal greater than 200 millimeters but carry out remedying of superstructure less than the pile sinking off normal of 1/10 net span.
More than just the utility model being further described, is not in order to the restriction this patent, and all is that the utility model equivalence is implemented, and all should be contained within the claim scope of this patent.

Claims (1)

1. the high-pile beam formula harbour of a pile sinking dislocation is remedied structure; Comprise harbour crossbeam (1), harbour longeron (2), pile sinking (3) and dislocation pile sinking (4); Harbour crossbeam (1) is for being fixedly installed on the T-shape beam on the pile sinking (3); Harbour longeron (2) is for being set in parallel in the reinforced concrete prefabricated beam on the harbour crossbeam (1); It is characterized in that harbour crossbeam (1) normal direction at dislocation pile sinking (4) is provided with the adjacent two cast-in-place quadratures of striding and strengthens longeron (5), with strengthen longeron (5) bag completely wrong position pile sinking (4) and with pile sinking (3) and harbour crossbeam (1) be the holistic structure of remedying.
CN201120244606U 2011-07-12 2011-07-12 High pile beam plate type dock remedy structure with malposed sunk piles Expired - Lifetime CN202148513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120244606U CN202148513U (en) 2011-07-12 2011-07-12 High pile beam plate type dock remedy structure with malposed sunk piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120244606U CN202148513U (en) 2011-07-12 2011-07-12 High pile beam plate type dock remedy structure with malposed sunk piles

Publications (1)

Publication Number Publication Date
CN202148513U true CN202148513U (en) 2012-02-22

Family

ID=45589576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120244606U Expired - Lifetime CN202148513U (en) 2011-07-12 2011-07-12 High pile beam plate type dock remedy structure with malposed sunk piles

Country Status (1)

Country Link
CN (1) CN202148513U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839589A (en) * 2016-05-27 2016-08-10 中交第航务工程局有限公司 Component assembly-type roll-on berth structure and assembly method
CN109898571A (en) * 2019-01-22 2019-06-18 南京林业大学 A kind of pile foundation deviation apron piece reinforcement means

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839589A (en) * 2016-05-27 2016-08-10 中交第航务工程局有限公司 Component assembly-type roll-on berth structure and assembly method
CN105839589B (en) * 2016-05-27 2018-05-04 中交第一航务工程局有限公司 A kind of component assembled roll-on berth structure and installation method
CN109898571A (en) * 2019-01-22 2019-06-18 南京林业大学 A kind of pile foundation deviation apron piece reinforcement means

Similar Documents

Publication Publication Date Title
CN102912896B (en) Separate type steel plate shear force wall
CN103161139B (en) Integrally assembled type flow guiding screen and construction method thereof
CN201962684U (en) Internal support wale reinforcing device
CN202148513U (en) High pile beam plate type dock remedy structure with malposed sunk piles
CN206245471U (en) A kind of dismountable assembled steel reinforced concrete column splices node with post
CN201206293Y (en) Wide span pre-stress hollow superimposed sheet
CN207891889U (en) A kind of recyclable lattice column guider
CN202139873U (en) Precasted environment-friendly pool structure for high-pile girder plate type wharf
CN202175949U (en) Cone-shaped light prefabricated concrete core pile
CN201531021U (en) Prefabricated member cement-treated-soil drilling and filling pile
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN201457715U (en) Underwater box type slipway
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN101666086B (en) Cement cast-in-situ pile of prefabricated part and construction method thereof
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN203238626U (en) Uplift pile with reinforcing bars distributed sectionally
CN202117049U (en) Latch type steel pipe pile
CN202767286U (en) Connection joint of precast concrete shear wall and main steel structure
CN203007973U (en) Combined type tower crane foundation
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN209443826U (en) A kind of underpinning device suitable for building with brick-concrete structure wall
CN211646943U (en) High-strength wallboard structure
CN203716162U (en) Inner-support free double-wall-lock steel jacket box cofferdam
CN203160513U (en) Floorboard
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120222