CN202139834U - Chamfer wall surface construction hanging basket - Google Patents

Chamfer wall surface construction hanging basket Download PDF

Info

Publication number
CN202139834U
CN202139834U CN201120185206U CN201120185206U CN202139834U CN 202139834 U CN202139834 U CN 202139834U CN 201120185206 U CN201120185206 U CN 201120185206U CN 201120185206 U CN201120185206 U CN 201120185206U CN 202139834 U CN202139834 U CN 202139834U
Authority
CN
China
Prior art keywords
hanging basket
wire rope
steel wire
wall surface
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120185206U
Other languages
Chinese (zh)
Inventor
谢家学
江炉平
王定川
王志华
田常录
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI COSMO SUSPENDED PLATFORM CO Ltd
Original Assignee
WUXI COSMO SUSPENDED PLATFORM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI COSMO SUSPENDED PLATFORM CO Ltd filed Critical WUXI COSMO SUSPENDED PLATFORM CO Ltd
Priority to CN201120185206U priority Critical patent/CN202139834U/en
Application granted granted Critical
Publication of CN202139834U publication Critical patent/CN202139834U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to a chamfer wall surface construction hanging basket, which comprises a suspension frame, a hanging head, a working steel wire rope, a safety steel wire rope, a hanging basket, a guide steel wire rope, a track pulley, a track ground lug and a chamfer wall surface. The hanging basket is hung on the suspension frame by the working steel wire rope through the hanging head, one end of the safety steel wire rope is hung on the suspension frame through the hanging head, and the other end of the safety steel wire rope is connected with the hanging basket. One end of the guide steel wire rope is connected with the suspension frame through the hanging head, and the other end of the guide steel wire rope is connected with the track ground lug. The track pulley is arranged on the lateral side of the hanging basket, the guide steel wire rope penetrates through the track pulley, and the suspension frame is arranged on the outer edge of a top layer of the chamfer wall surface. The chamfer wall surface construction hanging basket has the advantages that the guide steel wire rope can guarantee that a proper gap exists between the hanging basket and the chamfer wall surface, and the chamfer wall surface construction hanging basket is flexible to control, convenient to operate, simple in structure and the like.

Description

Bevelling wall construction hanging basket
Technical field
The utility model belongs to the building machinery technical field, relates to a kind of peculiar to vessel or aerial lift device that building is used, specifically is a kind of bevelling wall construction hanging basket.
Background technology
Hanging basket generally is made up of hitch, track, Rail climbing device, basket body and security system.The basket body can move with vertical along the track cross level walking, and the staff can arrive each facade of building, is mainly used in steamer, building or structure exterior window and operations such as outside Wall Cleaning, maintenance.
Because operation of inspection and maintenance outside vertical surface of building and common buildings beyond the region of objective existence facade condition of construction is different, common hanging basket is difficult to satisfy its job requirements.When existing common hanging basket is used for outer facade inspection and maintenance, the time regular meeting run into the construction metope uneven, be up big and down small bevelling metope sometimes.In this case, common hanging basket just can not be satisfied with its job requirements, can't make hanging basket and operating personnel near the construction metope, thereby research and development bevelling wall construction hanging basket equipment has important engineering application value.
Summary of the invention
The utility model purpose is to overcome the above-mentioned deficiency that exists in the prior art, and a kind of bevelling of hanging basket object of construction production wall construction hanging basket is provided.
The technical scheme that provides according to the utility model: said bevelling wall construction hanging basket comprises suspension, hangs head, load cable, safe wire rope, hanging basket, guiding wire rope, track pulley, track ground ear and bevelling metope.
As the further improvement of the utility model, through hanging head suspension on suspension, safe wire rope one end is through hanging head suspension on suspension by load cable for said hanging basket, and the other end is connected on the hanging basket.
As the further improvement of the utility model, said guiding wire rope one end is connected on the suspension through hanging head, and the other end is connected on the track ground ear.
As the further improvement of the utility model, said hanging basket side is provided with the track pulley, guiding steel wire penetrating track pulley, and suspension is arranged on the top layer outer rim of bevelling metope.
The utility model compared with prior art, advantage is: said guiding wire rope guarantees the appropriate gap of hanging basket and wall construction side, bevelling, has the characteristics such as flexible, easy to operate, simple in structure of controlling.
Description of drawings
Fig. 1 is the utility model overall structure sketch map;
Description of reference numerals: 1-suspension, 2-hang head, 3-load cable, 4-safety wire rope, 5-hanging basket, 6-guiding wire rope, 7-track pulley, 8-track ground ear, 9-bevelling metope.
The specific embodiment
Below in conjunction with concrete accompanying drawing and embodiment the utility model is described further.
As shown in Figure 1: the utility model mainly by suspension 1, hang 2, load cable 3, safe wire rope 4, hanging basket 5, guiding wire rope 6, track pulley 7, track ground ear 8 and bevelling metope 9 form; Said hanging basket 5 is suspended on the suspension 1 through hanging 2 by load cable 3, and safe wire rope 4 one ends are suspended on the suspension 1 through hanging 2, and the other end is connected on the hanging basket 5; Guiding wire rope 6 one ends are connected on the suspension 1 through hanging 2, and the other end is connected on the track ground ear 8; Hanging basket 5 sides are provided with track pulley 7, and guiding wire rope 6 passes track pulley 7, and suspension 1 is arranged on the top layer outer rim of bevelling metope 9.
During concrete the application; As shown in Figure 1; Said hanging basket 5 receives load cable 3 traction and moves up and down, and hanging basket 5 is pressed close to bevelling metope 9 construction sides through guiding wire rope 6, by hang 2 press close to bevelling metope 9 construction sides with the position assurance hanging basket 5 of track ground ear 8 appropriate gap.Safety wire rope 4 is inoperative during operate as normal, and when load cable 3 lost efficacy, safe wire rope 4 played the effect of protection staff safety.

Claims (4)

1. bevelling wall construction hanging basket is characterized in that: this bevelling wall construction hanging basket comprises suspension (1), hangs head (2), a load cable (3), safe wire rope (4), hanging basket (5), guiding wire rope (6), track pulley (7), track ground ear (8) and bevelling metope (9).
2. bevelling as claimed in claim 1 wall construction hanging basket; It is characterized in that: said hanging basket (5) is suspended on the suspension (1) through hanging head (2) by load cable (3); Safe wire rope (4) one ends are suspended on the suspension (1) through hanging head (2), and the other end is connected on the hanging basket (5).
3. bevelling as claimed in claim 1 wall construction hanging basket is characterized in that: said guiding wire rope (6) one ends are connected on the suspension (1) through hanging head (2), and the other end is connected on the track ground ear (8).
4. bevelling as claimed in claim 1 wall construction hanging basket is characterized in that: said hanging basket (5) side is provided with track pulley (7), and guiding wire rope (6) passes track pulley (7), and suspension (1) is arranged on the top layer outer rim of bevelling metope (9).
CN201120185206U 2011-06-03 2011-06-03 Chamfer wall surface construction hanging basket Expired - Fee Related CN202139834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120185206U CN202139834U (en) 2011-06-03 2011-06-03 Chamfer wall surface construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120185206U CN202139834U (en) 2011-06-03 2011-06-03 Chamfer wall surface construction hanging basket

Publications (1)

Publication Number Publication Date
CN202139834U true CN202139834U (en) 2012-02-08

Family

ID=45550897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120185206U Expired - Fee Related CN202139834U (en) 2011-06-03 2011-06-03 Chamfer wall surface construction hanging basket

Country Status (1)

Country Link
CN (1) CN202139834U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103626088A (en) * 2012-08-26 2014-03-12 江苏雄宇重工科技股份有限公司 Marine work platform
CN103626086A (en) * 2012-08-26 2014-03-12 江苏雄宇重工科技股份有限公司 Chamfer wall construction basket
CN110821138A (en) * 2019-11-28 2020-02-21 湖南青蓝文化传媒集团有限公司 Building decoration construction equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103626088A (en) * 2012-08-26 2014-03-12 江苏雄宇重工科技股份有限公司 Marine work platform
CN103626086A (en) * 2012-08-26 2014-03-12 江苏雄宇重工科技股份有限公司 Chamfer wall construction basket
CN110821138A (en) * 2019-11-28 2020-02-21 湖南青蓝文化传媒集团有限公司 Building decoration construction equipment

Similar Documents

Publication Publication Date Title
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs
CN203095547U (en) Hanging basket installation system used for beveled building
CN204703534U (en) A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN202139834U (en) Chamfer wall surface construction hanging basket
CN104973544A (en) Movable type single lifting basket
CN204510844U (en) A kind of large-span steel girder high-altitude mounting slip device
CN204211318U (en) A kind of structure of construction elevator of coming in and going out
CN203794533U (en) Light portable mobile lifting equipment
CN103626086A (en) Chamfer wall construction basket
CN201395455Y (en) Non-machinery room elevator
CN105035901B (en) Without pit lower-level elevator
CN204326493U (en) Unidirectional rising catching device
CN204022201U (en) A kind of weight-lifting equipment for vertical transport
CN102807178A (en) Chamfered hanging basket device with slide rail
CN102777048A (en) Vertical transportation device
CN203476246U (en) Sucker rod lifting system device
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN105155427A (en) Construction method for laying suspension bridge catwalk
CN202144440U (en) Inverted bevel slide rail lift basket device
CN214942249U (en) Novel indoor wall construction device
CN203555689U (en) Electric hanging basket for vertical shaft
CN203499232U (en) Attached lifting scaffold
CN204251144U (en) Compound type building hoist in a kind of bridge tower chamber
CN103359588B (en) Folding-jib Trapezoidal elevator hanging basket
CN208980193U (en) The curtain wall hanging apparatus of anticollision

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208

Termination date: 20120603