CN202134428U - Gis线性隔离开关用支撑架 - Google Patents
Gis线性隔离开关用支撑架 Download PDFInfo
- Publication number
- CN202134428U CN202134428U CN 201120192679 CN201120192679U CN202134428U CN 202134428 U CN202134428 U CN 202134428U CN 201120192679 CN201120192679 CN 201120192679 CN 201120192679 U CN201120192679 U CN 201120192679U CN 202134428 U CN202134428 U CN 202134428U
- Authority
- CN
- China
- Prior art keywords
- isolating switch
- bracing frame
- column
- gis
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
本实用新型公开了一种GIS线性隔离开关用支撑架,包括相对间隔平行设置的两支撑架焊装,两支撑架焊装分别包括底部的连接板、固定在连接板上的两个以上的立柱及固定在立柱顶部的支撑连接件,在两支撑连接件上分别开设有相对设置、用于装设相应隔离开关的圆弧形凹口,在各支撑连接件上分别沿圆弧形凹口的边沿开设有用于连接相应隔离开关的连接孔。本实用新型的结构简单,提高了隔离开关的可靠性和稳定性,有效避免了隔离开关触指、动触头的损坏,降低设备的成本,而且提高了设备的装配效率,保证了产品的交货时间。
Description
技术领域
本实用新型涉及一种GIS线性隔离开关使用的支撑架。
背景技术
现有的GIS线性隔离开关如ZF11-252(L)型高压隔离开关的结构较为复杂,其三相隔离开关之间需要通过相间连杆同步传动连接,但往往由于在安装过程中容易出现偏差,使得GIS中的三相隔离开关在实验过程中经常出现静触头部位电连接的触指被打坏的情况,这样不仅造成隔离开关零件的损坏,提高隔离开关的装配成本,更耽误了装配进度。
实用新型内容
本实用新型的目的是:提供一种GIS线性隔离开关用支撑架,以解决现有GIS线性隔离开关在安装实验过程中静触头部位电连接的触指经常被打坏的问题。
本实用新型的技术方案是:一种GIS线性隔离开关用支撑架,包括相对间隔平行设置的两支撑架焊装,两支撑架焊装分别包括底部的连接板、固定在连接板上的两个以上的立柱及固定在立柱顶部的支撑连接件,在两支撑连接件上分别开设有相对设置、用于装设相应隔离开关的圆弧形凹口,在各支撑连接件上分别沿圆弧形凹口的边沿开设有用于连接相应隔离开关的连接孔。
所述支撑连接件包括固定在相应侧立柱顶部的槽钢,该槽钢的槽口朝向为水平方向,槽钢的下侧槽壁与相应侧各立柱的顶端固定连接,在其上侧槽壁的外壁上垂直固定有支撑板,所述的圆弧形凹口开设在相应支撑板的上边沿上。
在所述槽钢的槽底沿其纵长方向并列开设有圆孔。
所述的两支撑板上相对的并列开设有三个圆弧形凹口,所述的各连接板上固定的立柱与各圆弧形凹口一一对应设置,立柱的竖向中心线的延长线通过相应圆弧形凹口的圆心。
所述两支撑架焊装底部还设置有大底板,所述的两连接板相对间隔固定在大底板上,在两连接板与大底板之间还分别垫设有垫板。
所述的立柱由槽钢构成。
在各立柱与对应的连接板之间还固定有加强筋。
在所述大底板上沿两连接板的中心连线对称安装有吊环。
本实用新型的结构简单,使用时,将隔离开关安装在相对间隔设置的支撑连接件上对应设置的圆弧形凹口中,用螺栓穿过对应设置的连接孔将隔离开关固定在该支撑架上,从而提高了隔离开关的可靠性和稳定性,不仅有效避免了隔离开关触指、动触头的损坏,降低设备的成本,而且提高了设备的装配效率,保证了产品的交货时间。
附图说明
图1为本实用新型GIS线性隔离开关用支撑架具体实施例的结构示意图;
图2为图1的侧视图。
具体实施方式
本实用新型的GIS线性隔离开关用支撑架的具体实施例如图1、图2所示,该支撑架两相对间隔设置的支撑架焊装,两支撑架焊装分别由底部的连接板2、沿连接板纵长方向并列固定在连接板上的三根立柱3及固定在各立柱3顶端的用于支撑连接GIS线性隔离开关的支撑连接件组成,其中,各支撑连接件主要由固定在相应侧立柱3顶部的槽钢4及垂直固定在相应槽钢4顶部的支撑板5组成,本实施例中,该槽钢4的槽口朝向为水平方向,槽钢4的下侧槽壁与对应连接板2上的各立柱3的顶部固定连接,支撑板5垂直固定在槽钢4上侧槽壁的外壁上,在两支撑板5的上边沿分别开设有三个并列排布、用于安装GIS线性隔离开关的圆弧形凹口9,在各支撑板5上分别沿圆弧形凹口的弧形边沿开设有用于穿装连接螺栓的连接孔。为保证支撑架的连接稳固性,本实施例中,各支撑架焊装上的三根立柱3分别对应固定在各圆弧形凹口9的正下方,各立柱3的竖向中心线的延长线均通过对应的圆弧形凹口9的圆心。为进一步的降低GIS线性隔离开关操作时对支撑架产生的扭矩,本实施例中,两支撑架焊装相对间隔平行固定安装在一个大底板1上,并在各连接板2与大底板1之间垫设有垫板6,同时,在各立柱3与连接板2之间增设加强筋7。另外,为降低整体支撑架的重心,保证GIS线性隔离开关的平稳,各立柱3的长度在保证GIS线性隔离开关正常工作的前提下应尽可能的缩短。为了在不降低支撑架稳定性的前提下降低支撑架的自重,本实施例中,在槽钢4的槽底沿其纵长方向并列的开设有若干圆孔8。
Claims (7)
1.一种GIS线性隔离开关用支撑架,其特征在于,包括相对间隔平行设置的两支撑架焊装,各支撑架焊装分别包括底部的连接板、固定在连接板上的两个以上的立柱及固定在立柱顶部的支撑连接件,在两支撑连接件上分别开设有相对设置、用于装设相应隔离开关的圆弧形凹口,在各支撑连接件上分别沿圆弧形凹口的边沿开设有用于连接相应隔离开关的连接孔。
2.根据权利要求1所述的GIS线性隔离开关用支撑架,其特征在于,所述支撑连接件包括固定在相应侧立柱顶部的槽钢,该槽钢的槽口朝向为水平方向,槽钢的下侧槽壁与相应侧各立柱的顶端固定连接,在其上侧槽壁的外壁上垂直固定有支撑板,所述的圆弧形凹口开设在相应支撑板的上边沿上。
3.根据权利要求2所述的GIS线性隔离开关用支撑架,其特征在于,在所述槽钢的槽底沿其纵长方向并列开设有圆孔。
4.根据权利要求2所述的GIS线性隔离开关用支撑架,其特征在于,所述的两支撑板上相对的并列开设有三个圆弧形凹口,所述的各连接板上固定的立柱与各圆弧形凹口一一对应设置,立柱的竖向中心线的延长线通过相应圆弧形凹口的圆心。
5.根据权利要求1所述的GIS线性隔离开关用支撑架,其特征在于,所述两支撑架焊装底部还设置有大底板,所述的两连接板相对间隔固定在大底板上,在两连接板与大底板之间还分别垫设有垫板。
6.根据权利要求1所述的GIS线性隔离开关用支撑架,其特征在于,所述的立柱由槽钢构成。
7.根据权利要求1所述的GIS线性隔离开关用支撑架,其特征在于,在各立柱与对应的连接板之间还固定有加强筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120192679 CN202134428U (zh) | 2011-06-09 | 2011-06-09 | Gis线性隔离开关用支撑架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120192679 CN202134428U (zh) | 2011-06-09 | 2011-06-09 | Gis线性隔离开关用支撑架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202134428U true CN202134428U (zh) | 2012-02-01 |
Family
ID=45523190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120192679 Expired - Lifetime CN202134428U (zh) | 2011-06-09 | 2011-06-09 | Gis线性隔离开关用支撑架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202134428U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103022914A (zh) * | 2012-12-11 | 2013-04-03 | 辽宁省电力有限公司朝阳供电公司 | 隔离刀闸解体检修辅助组件及利用该组件解体隔离刀闸的方法 |
CN103779120A (zh) * | 2012-10-17 | 2014-05-07 | 乐星湖开电气(湖北)有限公司 | 一种隔离开关移动快速安装平台 |
-
2011
- 2011-06-09 CN CN 201120192679 patent/CN202134428U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103779120A (zh) * | 2012-10-17 | 2014-05-07 | 乐星湖开电气(湖北)有限公司 | 一种隔离开关移动快速安装平台 |
CN103022914A (zh) * | 2012-12-11 | 2013-04-03 | 辽宁省电力有限公司朝阳供电公司 | 隔离刀闸解体检修辅助组件及利用该组件解体隔离刀闸的方法 |
CN103022914B (zh) * | 2012-12-11 | 2016-05-25 | 国网辽宁省电力有限公司朝阳供电公司 | 隔离刀闸解体检修辅助组件 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202134428U (zh) | Gis线性隔离开关用支撑架 | |
CN202240305U (zh) | 一种叉车侧板总成的焊接固定工装 | |
CN203722117U (zh) | 一种具有加强结构的全绝缘充气柜 | |
CN202672823U (zh) | 一种电力塔 | |
CN202953431U (zh) | U形板连接支腿 | |
CN203071409U (zh) | 稳固型重型电力控制柜 | |
CN203128036U (zh) | 转台及起重机 | |
CN203423604U (zh) | 一种防爆变频器 | |
CN206860759U (zh) | 一种抗振固定底座 | |
CN206807906U (zh) | 设备机柜柜体及设备机柜 | |
CN205070881U (zh) | 太阳能支架 | |
CN202804658U (zh) | 分体式机床架 | |
CN104918428A (zh) | 一种高强度网路机柜 | |
CN202414924U (zh) | 一种电梯下梁和托架结构 | |
CN106351500A (zh) | 一种通讯塔结构 | |
CN203747737U (zh) | 一种光伏支架连接件 | |
CN202785302U (zh) | 用于吊车梁结构的吊车梁机构 | |
CN203010125U (zh) | 渐变式电视机底座限位装置 | |
CN207250406U (zh) | 一种柱上户外真空断路器的机箱 | |
CN202550292U (zh) | 一种水平布置断路器的支撑架 | |
CN204451976U (zh) | 一种电动四轮车的电池箱 | |
CN202831210U (zh) | 用于基础钢结构的系杆机构 | |
CN203351949U (zh) | 大三角支架 | |
CN202391196U (zh) | 一种电力塔 | |
CN204668732U (zh) | 一种用于高压开关柜的线束定位装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120201 |