CN202132695U - Mobile liquefied natural gas supply device for drilling well site - Google Patents

Mobile liquefied natural gas supply device for drilling well site Download PDF

Info

Publication number
CN202132695U
CN202132695U CN201120220133U CN201120220133U CN202132695U CN 202132695 U CN202132695 U CN 202132695U CN 201120220133 U CN201120220133 U CN 201120220133U CN 201120220133 U CN201120220133 U CN 201120220133U CN 202132695 U CN202132695 U CN 202132695U
Authority
CN
China
Prior art keywords
valve
outlet
pipeline
gas
temperature type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120220133U
Other languages
Chinese (zh)
Inventor
张孔明
谢昕
王科
郭绪欣
王彦超
郭怀东
郭玉华
夏步前
张光
梅利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG GREEN ENERGY GAS INDUSTRIAL Co Ltd
ZHONGYUAN LUNENG HIGH-TECHNOLOGIES Co Ltd HENAN PROV
Original Assignee
SHANDONG GREEN ENERGY GAS INDUSTRIAL Co Ltd
ZHONGYUAN LUNENG HIGH-TECHNOLOGIES Co Ltd HENAN PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GREEN ENERGY GAS INDUSTRIAL Co Ltd, ZHONGYUAN LUNENG HIGH-TECHNOLOGIES Co Ltd HENAN PROV filed Critical SHANDONG GREEN ENERGY GAS INDUSTRIAL Co Ltd
Priority to CN201120220133U priority Critical patent/CN202132695U/en
Application granted granted Critical
Publication of CN202132695U publication Critical patent/CN202132695U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to a mobile liquefied natural gas supply device for a drilling well site, which belongs to the liquefied natural gas supply technology for oil field drilling wells. The outlet of a liquid storage pot is connected with the inlet of a vaporizing pry, and a stop valve, a decompression valve and a pipeline are connected in series at the gas phase top of the liquid storage pot. The outlet of the pipeline is connected with the pipeline between an emergent cutoff valve of the liquid storage pot and the stop valve. A first low-temperature stop valve, a second low-temperature stop valve, a first preheat-segment empty temperature type carburetor and a second preheat-segment empty temperature type carburetor are connected in parallel. A heating-segment empty temperature type carburetor is connected with the outlets of the first preheat-segment empty temperature type carburetor and the second preheat-segment empty temperature type carburetor, and the outlet of the heating-segment empty temperature type carburetor is connected with a pressure regulating valve unit. A meter wind valve is arranged on a pipeline between the heating-segment empty temperature type carburetor and the pressure regulating valve unit. The outlet of the pressure regulating valve unit is connected with the inlet of a buffer tank, and the outlet of the buffer tank is connected with the inlet of a natural gas engine through a hose string.

Description

A kind of movable liquefied natural gas air feeder that is used for drilling well site
One, technical field: the utility model relates to oil drilling liquefaction natural gas supply technology, especially a kind of movable liquefied natural gas air feeder that is used for drilling well site.
Two, background technique: at present, the LNG Liquefied natural gas air supply system that drilling well is used adopts the tooling at liquefied natural gas vaporization station, then seems obviously not enough being applied to drilling well special operation industry.Deficiency show as following some: 1, the tooling at liquefied natural gas vaporization station; As fixed vaporizing station, on the making volume, only consider that disposable resettlement puts in place, therefore the volume of vaporization sled is bigger; Be not suitable for the characteristics of drilling team's mobile operational process, be unfavorable for resettlement; 2, the LNG Liquefied natural gas air supply system gas consumption of civilian and general industry boiler, generating usefulness is more stable; And the load variations of the natural gas engine of drillng operation is frequent; Impact load is big; The maximum required natural gas amount of instantaneous load far surpasses the designed capacity of vaporization sled, and under this kind operating mode, gas discharge can not satisfy the instantaneous load needs and cause engine speed unstable or flame-out; 3, fixed vaporizing station can conveniently connect the external high pressure power supply, sets up special-purpose automatically controlled control machine room and electric heating system, and drillng operation is because operation in the open air, and Special Automatic automatically controlled control machine room and electric heating system make cost and installation difficulty increase undoubtedly; 4, the boil-off gas that produces in the process of unloading of fixed liquefied natural gas vaporization station storage tank, can through through emptying or directly transmission pipeline network reduce pressure, and, caused the waste and and the high-risk well site unsafe factor of rock gas in the drilling well site emptying.
Three, summary of the invention: the purpose of the utility model provides the drillng operation convenient removal; Safe and reliable, that energy consumption is low a kind of movable liquefied natural gas air feeder that is used for drilling well site, the tooling that it has overcome the liquefied natural gas vaporization station is applied to the defective of drillng operation.The purpose of the utility model is achieved in that it is to be revealed controller, rock gas import, gas outlet, end socket, heat exchange gas pipe, water jacket, intake pipe valve and outlet pipe valve and be formed by connecting natural gas storage tanks, Decompression valves, stop valve, fluid stop valve, Emergeny Cutoff Valves, the first preheating section air temperature type vaporizer, first cryogenic globe valve, the empty warm vaporizer of bringing-up section, the second preheating section air temperature type vaporizer, second cryogenic globe valve, instrument air valve, pressure regulator valve group, knock out drum, pressure controller, temperature controller, combustion gas; The outlet of liquid container is connected with the inlet of vaporization sled; Gas phase top at liquid container; Stop valve, Decompression valves and pipeline are connected in series, and pipeline outlet is connected with pipeline between liquid container Emergeny Cutoff Valves, the stop valve.
First cryogenic globe valve, second cryogenic globe valve, the first preheating section air temperature type vaporizer, the second preheating section air temperature type vaporizer are connected in parallel; The empty warm vaporizer of bringing-up section is connected with the outlet of the first preheating section air temperature type vaporizer, the second preheating section air temperature type vaporizer; The outlet of the empty warm vaporizer of bringing-up section connects the pressure regulator valve group; On the pipeline between empty warm vaporizer of bringing-up section and the pressure regulator valve group; An instrument air valve is arranged, and the outlet of instrument air valve connects the import of the Emergeny Cutoff Valves of liquid container through soft pipeline; The outlet of pressure regulator valve group is connected with the import of knock out drum, and the outlet of knock out drum is connected through the soft pipeline pipeline with the natural gas engine import.
The valve upper end, top that temperature transducer is installed on the pipeline between empty warm vaporizer of bringing-up section and the pressure regulator valve group, pressure controller is installed in knock out drum, the gas leakage controller is installed in an end of storage device, and the circuit of three controllers is connected in series; Storage battery is connected with high-voltage power; The signal source outlet of three sensors is connected with the inlet line of intelligent controller, and the egress line of intelligent controller and monitoring alarm display unit and Emergeny Cutoff Valves are connected in parallel.
Promising rock gas import on water cycle heating equipment end socket in front has heating back gas outlet on the end socket of back; The intake pipe valve is fixed on the bottom of end socket one end, and is connected with the motor water outlet, and the outlet pipe valve is fixed on the top of end socket one end, and is connected with the water intake of motor; The heat exchange gas pipe is welded in the end socket; The tubular space that circularizes of water jacket and heat exchange gas, the intake pipe valve is fixed on the bottom of end socket one end, and the outlet pipe valve is fixed on the top of end socket one end.
Workflow is: LNG Liquefied natural gas with liquid state flow into vaporizer preheating section or, two vaporizers can be switched use in turn.After preheating, the cryogenic gas that exists with gas phase, in the further heat exchange of the bringing-up section of vaporizer, gas gets into the pressure regulator valve group with the temperature that is lower than environment 5-10 ℃.The pressure regulator valve group is through after the pressure regulation, and the knock out drum that the gas warp is 0.5 cube gets into water-cycle heating unit feeding motor and uses.When liquid container pressure raises, reach the setting pressure of pressure releaser Decompression valves, boil-off gas is through by stop valve, Decompression valves and pipeline outlet, makes the LNG of gaseous state be discharged into the outlet of storage tank, gets into vaporizing unit.
The meaning of the utility model is: make the drillng operation convenient removal, and safe and reliable, energy consumption is lower.It is big on the skid volume that it has mainly solved same device, is unfavorable for the problem of the resettlement of drilling team; Guaranteed drilling well natural gas engine air feed continuous and stable in load variations and assault load; Foundation meets well site actual with safe automatical control system, heating system; When the boil-off gas that liquid container produced raises jar internal pressure, can be discharged into vaporization to pressure automatically and pry into mouth, avoided having increased the well site Security because emptying causes the waste of combustion gas.
Four, description of drawings: Fig. 1 is a kind of movable liquefied natural gas air feeder flow chart that is used for drilling well site, among the figure 1, the empty warm vaporizer of stop valve 2, Decompression valves 3, fluid stop valve 4, Emergeny Cutoff Valves 5, the first preheating section air temperature type vaporizer 6, first cryogenic globe valve 7, bringing-up section 8, the second preheating section air temperature type vaporizer 9, second cryogenic globe valve 10, instrument air valve 11, pressure regulator valve group 12, knock out drum 13 pressure controllers 14, temperature controller 15, combustion gas reveal controller.
Fig. 2 is a kind of water cycle heating equipment structural representation that is used for the movable liquefied natural gas air feeder of drilling well site, among the figure 16, rock gas import 17, gas outlet 18, end socket 19, heat exchange gas pipe 20, water jacket 21, intake pipe valve 22, outlet pipe valve.
Five, embodiment: embodiment 1, the utility model are to be revealed controller 15, rock gas import 16, gas outlet 17, end socket 18, heat exchange gas pipe 19, water jacket 20, intake pipe valve 21 and outlet pipe valve 22 and be formed by connecting the empty warm vaporizer of natural gas storage tanks, stop valve 1, Decompression valves 2, fluid stop valve 3, Emergeny Cutoff Valves 4, the first preheating section air temperature type vaporizer 5, first cryogenic globe valve 6, bringing-up section 7, the second preheating section air temperature type vaporizer 8, second cryogenic globe valve 9, instrument air valve 10, pressure regulator valve group 11, knock out drum 12, pressure controller 13, temperature controller 14, combustion gas; The outlet of liquid container is connected with the inlet of vaporization sled; Gas phase top at liquid container; Stop valve 2, Decompression valves 1 and pipeline are connected in series, being connected of the pipeline between pipeline outlet and the storage tank Emergeny Cutoff Valves 4 fluid stop valves 3.
Embodiment 2, first cryogenic globe valve 6, second cryogenic globe valve 9, the first preheating section air temperature type vaporizer 5, the second preheating section air temperature type vaporizer 8 are connected in parallel; The empty warm vaporizer 7 of bringing-up section is connected with the outlet of the first preheating section air temperature type vaporizer 5, the second preheating section air temperature type vaporizer 8; The outlet of the empty warm vaporizer 7 of bringing-up section connects pressure regulator valve group 11; On the pipeline between empty warm vaporizer 7 of bringing-up section and the pressure regulator valve group 11; An instrument air valve 10 is arranged, and 10 outlets of instrument air valve connect the import of the Emergeny Cutoff Valves 4 of liquid container through soft pipeline; The outlet of pressure regulator valve group 11 is connected with the import of knock out drum, and the outlet of knock out drum is connected through the soft pipeline pipeline with the natural gas engine import.
The valve upper end, top that embodiment 3, temperature transducer 14 are installed on the pipeline between empty warm vaporizer 7 of bringing-up section and the pressure regulator valve group 11, pressure controller 13 is installed in knock out drum 12; Gas leakage controller 15 is installed in an end of storage device, and the circuit of three controllers is connected in series; Storage battery is connected with high-voltage power; The signal source outlet of three sensors is connected with the inlet line of intelligent controller, and the egress line of intelligent controller and monitoring alarm display unit and Emergeny Cutoff Valves 4 are connected in parallel.
Embodiment 4, promising rock gas import 16 on water cycle heating equipment end socket 18 in front have heating back gas outlet 17 on the end socket of back; Intake pipe valve 21 is fixed on the bottom of end socket 18 1 ends, and is connected with the motor water outlet, and outlet pipe valve 22 is fixed on the top of end socket 18 1 ends, and is connected with the water intake of motor; Heat exchange gas pipe 19 is welded in the end socket 18; Water jacket 20 forms annular space with heat exchange gas pipe 19, and intake pipe valve 21 is fixed on the bottom of end socket 18 1 ends, and outlet pipe valve 22 is fixed on the top of end socket 18 1 ends.

Claims (4)

1. movable liquefied natural gas air feeder that is used for drilling well site; It is to be revealed controller (15), rock gas import (16), gas outlet (17), end socket (18), heat exchange gas pipe (19), water jacket (20), intake pipe valve (21) and outlet pipe valve (22) and be formed by connecting natural gas storage tanks, stop valve (1), Decompression valves (2), fluid stop valve (3), Emergeny Cutoff Valves (4), the first preheating section air temperature type vaporizer (5), first cryogenic globe valve (6), the empty warm vaporizer (7) of bringing-up section, the second preheating section air temperature type vaporizer (8), second cryogenic globe valve (9), instrument air valve (10), pressure regulator valve group (11), knock out drum (12), pressure controller (13), temperature controller (14), combustion gas; It is characterized in that: the outlet of liquid container is connected with the inlet of vaporization sled; Gas phase top at liquid container; Stop valve (1), Decompression valves (2) and pipeline are connected in series, being connected of the pipeline between pipeline outlet and storage tank Emergeny Cutoff Valves (4) the fluid stop valve (3).
2. a kind of movable liquefied natural gas air feeder that is used for drilling well site according to claim 1 is characterized in that: first cryogenic globe valve (6), second cryogenic globe valve (9), the first preheating section air temperature type vaporizer (5), the second preheating section air temperature type vaporizer (8) are connected in parallel; The empty warm vaporizer of bringing-up section (7) is connected with the outlet of the first preheating section air temperature type vaporizer (5), the second preheating section air temperature type vaporizer (8); The outlet of the empty warm vaporizer of bringing-up section (7) connects pressure regulator valve group (11); On the pipeline between empty warm vaporizer (7) of bringing-up section and the pressure regulator valve group (11); An instrument air valve (10) is arranged, and instrument air valve (10) outlet connects the import of the Emergeny Cutoff Valves (4) of liquid container through soft pipeline; The outlet of pressure regulator valve group (11) is connected with the import of knock out drum (12), and the outlet of knock out drum (12) is connected through the soft pipeline pipeline with the natural gas engine import.
3. a kind of movable liquefied natural gas air feeder that is used for drilling well site according to claim 1; It is characterized in that: the valve upper end, top that temperature transducer (14) is installed on the pipeline between empty warm vaporizer (7) of bringing-up section and the pressure regulator valve group (11), pressure controller (13) is installed in knock out drum (12); Gas leakage controller (15) is installed in an end of storage device, and the circuit of three controllers is connected in series; Storage battery is connected with high-voltage power; The signal source outlet of three sensors is connected with the inlet line of intelligent controller, and the egress line of intelligent controller and monitoring alarm display unit and Emergeny Cutoff Valves (4) are connected in parallel.
4. a kind of movable liquefied natural gas air feeder that is used for drilling well site according to claim 1; It is characterized in that: go up promising rock gas import (16) at water cycle heating equipment end socket in front (18), heating back gas outlet (17) is arranged on the end socket of back; Intake pipe valve (21) is fixed on the bottom of end socket (18) one ends, and is connected with the motor water outlet, and outlet pipe valve (22) is fixed on the top of end socket (18) one ends, and is connected with the water intake of motor; Heat exchange gas pipe (19) is welded in the end socket (18); Water jacket (20) forms annular space with heat exchange gas pipe (19), and intake pipe valve (21) is fixed on the bottom of end socket (18) one ends, and outlet pipe valve (22) is fixed on the top of end socket (18) one ends.
CN201120220133U 2011-06-27 2011-06-27 Mobile liquefied natural gas supply device for drilling well site Expired - Fee Related CN202132695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120220133U CN202132695U (en) 2011-06-27 2011-06-27 Mobile liquefied natural gas supply device for drilling well site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120220133U CN202132695U (en) 2011-06-27 2011-06-27 Mobile liquefied natural gas supply device for drilling well site

Publications (1)

Publication Number Publication Date
CN202132695U true CN202132695U (en) 2012-02-01

Family

ID=45521462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120220133U Expired - Fee Related CN202132695U (en) 2011-06-27 2011-06-27 Mobile liquefied natural gas supply device for drilling well site

Country Status (1)

Country Link
CN (1) CN202132695U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583210A (en) * 2012-03-12 2012-07-18 无锡辉腾科技有限公司 Removable skid-mounted equipment
CN104406048A (en) * 2014-10-28 2015-03-11 成都创源油气技术开发有限公司 Gas supply structure for liquefied low-pressure shale gas
CN106085529A (en) * 2016-06-04 2016-11-09 常州大学 A kind of portable adsorption-type natural gas recycling device and method
CN106122759A (en) * 2016-08-17 2016-11-16 舟山博睿船舶科技开发有限公司 A kind of LNG cargo ship self-circulating energy-saving energy supplying system
CN111623240A (en) * 2020-06-16 2020-09-04 盘锦奥德燃气装备制造有限公司 Pressure regulating metering device based on liquefied natural gas and compressed natural gas

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583210A (en) * 2012-03-12 2012-07-18 无锡辉腾科技有限公司 Removable skid-mounted equipment
CN104406048A (en) * 2014-10-28 2015-03-11 成都创源油气技术开发有限公司 Gas supply structure for liquefied low-pressure shale gas
CN106085529A (en) * 2016-06-04 2016-11-09 常州大学 A kind of portable adsorption-type natural gas recycling device and method
CN106122759A (en) * 2016-08-17 2016-11-16 舟山博睿船舶科技开发有限公司 A kind of LNG cargo ship self-circulating energy-saving energy supplying system
CN106122759B (en) * 2016-08-17 2018-10-12 舟山博睿船舶科技开发有限公司 A kind of LNG cargo ships self-circulating energy-saving energy supplying system
CN111623240A (en) * 2020-06-16 2020-09-04 盘锦奥德燃气装备制造有限公司 Pressure regulating metering device based on liquefied natural gas and compressed natural gas

Similar Documents

Publication Publication Date Title
CN104265512B (en) High-pressure/low-pressure gas supply system of ship power plant
CN202132695U (en) Mobile liquefied natural gas supply device for drilling well site
CN207514561U (en) A kind of LNG fuel feeder peculiar to vessel
CN101520128A (en) Movable type method and device for supplying liquid phase natural gas and gas phase natural gas
CN102679414B (en) The multifunction range of high-efficient energy-saving environment friendly
CN201547497U (en) Compressed natural gas pressure regulating gas supply device by adopting air-temperature heat exchanger
CN204060975U (en) A kind of high voltage/low voltage fuel gas supply system of Ship Power Equipment
CN102537656A (en) Independent liquefied natural gas supply device
CN202660230U (en) Phase change-less LNG (liquefied natural gas) cold energy utilization device for cold storage
CN202442107U (en) Independent liquefied natural gas supply device
CN201526804U (en) Liquid oxygen gasification device specially used for oxygen-richened micro-oil ignition and combustion stabilization device
CN108204522A (en) A kind of liquefied natural gas gasifying voltage-regulating system for combustion gas revolution cupola furnace
CN102425725A (en) System and method for reclaiming boil off gas (BOG) in liquefied natural gas (LNG) storage tank
CN202791322U (en) LNG (liquefied natural gas) gasification station
CN202327654U (en) System for recycling boil-off gas (BOG) in liquefied natural gas (LNG) storage tank
CN202660240U (en) LNG (liquefied natural gas) and CNG (compressed natural gas) combined gas supplying device with gas peak regulating function
CN114688445B (en) Hydrogen liquid hydrogen hydrogenation station
CN201335394Y (en) Light hydrocarbon fuel-gas generating device
CN103615660A (en) Water bath vaporizer using waste heat energy of engine
CN102095071A (en) Method and device for supplying multifunctional mobile liquid-phase natural gas and gas-phase natural gas
CN211600224U (en) Gasification sled
CN204100214U (en) A kind of alcohol-group fuel steam generator
CN204201473U (en) A kind of BOG of LNG landing stage formula gas station reclaims power generation system
CN206647753U (en) CNG gas stations intelligent control and monitoring system and its gas station
CN106082218A (en) Prepare the device of dry ice

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201