CN202131090U - Electric heating brimstone melting pool of small-sized brimstone furnace - Google Patents
Electric heating brimstone melting pool of small-sized brimstone furnace Download PDFInfo
- Publication number
- CN202131090U CN202131090U CN201120165803U CN201120165803U CN202131090U CN 202131090 U CN202131090 U CN 202131090U CN 201120165803 U CN201120165803 U CN 201120165803U CN 201120165803 U CN201120165803 U CN 201120165803U CN 202131090 U CN202131090 U CN 202131090U
- Authority
- CN
- China
- Prior art keywords
- electric heating
- brimstone
- melting pool
- sulfur melting
- heating body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Resistance Heating (AREA)
Abstract
The utility model discloses a high-efficiency direct contact type electric heating brimstone melting pool of a small-sized brimstone furnace in the sugar industry. The electric heating brimstone melting pool is in a dual-layer structure and is composed of a brimstone melting pool shell and a brimstone melting pool inner container. The electric heating brimstone melting pool is characterized in that: an electric heating body sleeve internally provided with an electric heating body is arranged below a bottom plate of the brimstone melting pool inner container; and a heat conducting material is stuffed between the bottom plate of the brimstone melting pool inner container and the electric heating body sleeve. The electric heating brimstone melting pool has the beneficial effects that: the electric heating body is used for uniformly distributing heat quantity on the bottom plate through a heat-transfer medium so that brimstone is uniformly and quickly melted, without a problem of local overheating. A plurality of electric heating bodies are respectively served as independent modules to use simultaneously, so that a heating system is not wholly halted even if part of electric heating bodies is damaged; moreover, a standby electric heating body is provided; when the heating system works, the damaged electric heating body can be conveniently exchanged so as to avoid economic loss due to stopping for maintenance; therefore, both the reliability and the safety are greatly improved and increased.
Description
Technical field
The utility model relates to a kind of molten sulphur device, the small-sized brimstone furnace electric heating of especially a kind of sugar industry high efficiency direct-contact electrically heated sulfur melting pool.
Background technology
The type of heating that sulfur melting groove adopted that present back yard industry brimstone furnace is used has two kinds, steam heating mode and heat-conducting oil heating mode.Sulfur melting groove structure formation generally is designed to square container, and distribution steam or heat-conducting oil heating pipe in the groove, steam or thermal oil are elevated to more than 120 degree pipeline temperature through pipeline, make the sulphur fusing of Contact Heating pipe, reach the purpose of molten sulphur.The essence of these two kinds of type of heating is the same, and the heating thermal source of promptly molten sulphur is beyond sulfur melting groove (steam-heated thermal source comes from boiler, and the thermal source of thermal oil is from the heated oil device) all, and heating tube is essentially the integral body of a connection.There are several problems such as energy saving is poor, heating efficiency is low, safe reliability difference in such type of heating.Because the heating thermal source outside sulfur melting groove, has the considerable part heat when transmitting, to cause damage, and causes energy-saving effect not good, and it is slow to heat up, molten sulphur speed is lower.Because the heating tube pipeline is essentially the integral body of a connection, in case leaking appears in the pipeline somewhere, whole heating system is just compelled to quit work, and the high temperature and high pressure steam in the pipeline and thermal oil might cause security incident to external eruption.Be positioned at the molten sulfur liquid level when following like partial information leakage, repair and more change jobs unusual difficulty.And heat-conducting oil system needs pumped oil circulation, in case oil pump damages, whole heating system also will quit work.
The utility model content
The purpose of the utility model provides the molten sulphur device of a kind of electrically heated, adopts electrically heated, and energy saving, heating efficiency and safe reliability aspect all are greatly improved.
The technical scheme that the utility model is taked is: many electric heating elements are evenly distributed under the sulfur melting pool base plate, through heat-conducting medium heat are delivered on the base plate uniformly, the sulphur in the fusion pond.
Sulfur melting pool adopts bilayer structure, is made up of sulfur melting pool shell and sulfur melting pool inner bag, it is characterized in that: the electric heating element sleeve pipe of dress electric heating element in below the sulfur melting pool interior plate, being provided with is filled with thermally conductive material between sulfur melting pool interior plate and the electric heating element sleeve pipe.
Sulfur melting pool shell and electric heating element sleeve pipe are sealed whole body.
The beneficial effect of the utility model is: electric heating element is evenly distributed to heat on the base plate through heat-transfer medium, and sulphur melts evenly fast, does not have the problem of local superheating.Many electric heating elements use as module independently separately simultaneously, and heating system is whole shuts down even have the part electric heating element to damage also can not cause, and leaves subsequent use electric heating element.Under the situation of heating system work, can change impaired electric heating element easily, the financial loss of avoiding shutdown maintenance to cause.Safety and security all are greatly improved and improve.
Description of drawings
Fig. 1 is the utility model structural representation.
Shown in the figure: sulfur melting pool shell 1; Sulfur melting pool inner bag 2; Electric heating element sleeve pipe 3; Thermally conductive material 4; Lagging material 5.
Embodiment
Sulfur melting pool adopts bilayer structure, is made up of sulfur melting pool shell 1 and sulfur melting pool inner bag 2, is filled with lagging material 5 between the outer internal layer.Be evenly distributed with electric heating element sleeve pipe 3 in sulfur melting pool inner bag 2 floor below, electric heating element is placed in the electric heating element sleeve pipe 3.Be filled with thermally conductive material 4 between sulfur melting pool inner bag 2 base plates and the electric heating element sleeve pipe 3, can change electric heating element easily.Sulfur melting pool shell 1 seals welding with the place that electric heating element sleeve pipe 3 contacts, and forms sealed whole body.So just realized double-layer seal,, also also had shell seal, improved the safety of equipment even inner bag has liquid-state sulfur to leak.
Claims (2)
1. small-sized brimstone furnace electric heating sulfur melting pool; Sulfur melting pool adopts bilayer structure; Constitute by sulfur melting pool shell (1) and sulfur melting pool inner bag (2); It is characterized in that: the electric heating element sleeve pipe (3) of dress electric heating element in sulfur melting pool inner bag (2) floor below is provided with is filled with thermally conductive material (4) between sulfur melting pool inner bag (2) base plate and the electric heating element sleeve pipe (3).
2. brimstone furnace electric heating sulfur melting pool according to claim 1 is characterized in that: sulfur melting pool shell (1) and electric heating element sleeve pipe (3) are sealed whole body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120165803U CN202131090U (en) | 2011-05-23 | 2011-05-23 | Electric heating brimstone melting pool of small-sized brimstone furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120165803U CN202131090U (en) | 2011-05-23 | 2011-05-23 | Electric heating brimstone melting pool of small-sized brimstone furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202131090U true CN202131090U (en) | 2012-02-01 |
Family
ID=45519867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120165803U Expired - Fee Related CN202131090U (en) | 2011-05-23 | 2011-05-23 | Electric heating brimstone melting pool of small-sized brimstone furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202131090U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103420343A (en) * | 2013-08-23 | 2013-12-04 | 长沙有色冶金设计研究院有限公司 | Continuous sulfur heating melting pool |
CN109336060A (en) * | 2018-10-31 | 2019-02-15 | 王清玉 | A kind of molten sulphur device of energy conservation and environmental protection |
-
2011
- 2011-05-23 CN CN201120165803U patent/CN202131090U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103420343A (en) * | 2013-08-23 | 2013-12-04 | 长沙有色冶金设计研究院有限公司 | Continuous sulfur heating melting pool |
CN103420343B (en) * | 2013-08-23 | 2015-02-11 | 长沙有色冶金设计研究院有限公司 | Continuous sulfur heating melting pool |
CN109336060A (en) * | 2018-10-31 | 2019-02-15 | 王清玉 | A kind of molten sulphur device of energy conservation and environmental protection |
CN109336060B (en) * | 2018-10-31 | 2021-12-10 | 浙江程阳机电有限公司 | Energy-saving and environment-friendly sulfur melter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102734929B (en) | Molten salt heating and discharging system for solar thermal power | |
CN105545618A (en) | Parabolic trough solar thermal power generation system and method utilizing fuse salt medium | |
CN202675673U (en) | Overheating prevention protection device of separating pressure-bearing solar water heater | |
CN104864613A (en) | Heat storage device | |
CN203837264U (en) | Fused salt heating system for wind power heat supply | |
CN105423795A (en) | Molten salt heat storage device | |
CN202675613U (en) | Photo-thermal power-generation fused salt heating and discharging system | |
CN105066447A (en) | Electromagnetic heating boiler system | |
CN202131090U (en) | Electric heating brimstone melting pool of small-sized brimstone furnace | |
CN202126087U (en) | Electric heater | |
CN202032726U (en) | Hydraulic pressure resisting liquid rapid heater | |
CN201755493U (en) | Circulation cooling system for reaction kettle | |
CN205227804U (en) | Boiler of intelligent regulation load | |
CN104653789A (en) | Electric heating liquid-state metal valve with leakage detection | |
CN204869772U (en) | Electrical heating hot press | |
CN102966935B (en) | Fused salt steam generator | |
CN204880724U (en) | Electromagnetic heating boiler system | |
CN104566975A (en) | Multi-functional heating furnace | |
CN105716462A (en) | Solid heat storage and exchange machine, solid heat storage system and solid heat storage method | |
CN103591688A (en) | Electric heating energy-saving storage unit | |
CN201184498Y (en) | Solar energy heating apparatus of oil delivery pipeline | |
CN103759237A (en) | Medium-temperature solar steam system | |
CN105444413A (en) | Electric power combustion device | |
CN201844725U (en) | Phase change thermal storage exchanger | |
CN109386972A (en) | A kind of multiple tank fused salt hold over system of compressed gas and pump for liquid salts coupling driving |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120201 Termination date: 20180523 |
|
CF01 | Termination of patent right due to non-payment of annual fee |