CN202126291U - Glass fiber reinforced plastic integral water meter box - Google Patents

Glass fiber reinforced plastic integral water meter box Download PDF

Info

Publication number
CN202126291U
CN202126291U CN2011202586391U CN201120258639U CN202126291U CN 202126291 U CN202126291 U CN 202126291U CN 2011202586391 U CN2011202586391 U CN 2011202586391U CN 201120258639 U CN201120258639 U CN 201120258639U CN 202126291 U CN202126291 U CN 202126291U
Authority
CN
China
Prior art keywords
hole
casing
reinforced plastic
meter box
plastic integral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202586391U
Other languages
Chinese (zh)
Inventor
隋江
周涛
秦永杰
栾厚森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiayuan Glass Fiber Reinforced Plastic Co Ltd Shandong
Original Assignee
Jiayuan Glass Fiber Reinforced Plastic Co Ltd Shandong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiayuan Glass Fiber Reinforced Plastic Co Ltd Shandong filed Critical Jiayuan Glass Fiber Reinforced Plastic Co Ltd Shandong
Priority to CN2011202586391U priority Critical patent/CN202126291U/en
Application granted granted Critical
Publication of CN202126291U publication Critical patent/CN202126291U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to a glass fiber reinforced plastic integral water meter box, which comprises a box body and a box cover. The box body and the box cover are connected in sealing mode. First through holes for enabling pipelines to penetrate in and second through holes for enabling the pipelines to penetrate out are arranged on the lateral wall of the box body. The water meter box is made of glass fiber reinforced plastics integrally and is low in manufacture cost, light in weight, convenient to install, high in strength, no easy to damage, long in service life and low in maintenance cost. The box body and the box cover are connected in sealing mode, the box body is an integral structure, and anti-leakage effect is good.

Description

The glass fibre reinforced plastic integral meter box
Technical field
The utility model relates to a kind of meter box, relates in particular to a kind of glass fibre reinforced plastic integral meter box.
Background technology
When running water pipe gets into each user, usually water meter need be installed on running water pipe, for the ease of reading of data of water meter, present water meter is installed concentratedly mostly in the underground water meter case at residential building front portion or rear portion; The underground water meter case is brick wall structure mostly, can only make at the scene, and meter box is made inconvenient, and manufacturing cost is high; The meter box of brick wall structure is prone to water inlet, and the antiseep weak effect is fragile; Serviceable life is short, is difficult for after the damage keeping in repair, and maintenance cost is high.
The utility model content
The problem that the utility model will solve is to above problem, provide a kind of low cost of manufacture, easy for installation, antiseep is effective, long service life, glass fibre reinforced plastic integral meter box that maintenance cost is low.
For addressing the above problem; The technical scheme that the utility model adopted is: the glass fibre reinforced plastic integral meter box; Comprise casing and case lid, said casing and case lid are tightly connected, and the sidewall of said casing is provided with and holds first through hole that pipeline penetrates and hold second through hole that pipeline passes.
A kind of concrete prioritization scheme, said casing be shaped as rectangle.
A kind of concrete prioritization scheme, said first through hole are positioned on one of them sidewall of casing, and said second through hole is positioned on the sidewall relative with first through hole place sidewall.
A kind of concrete prioritization scheme, said first through hole and second through hole are symmetrical set.
A kind of concrete prioritization scheme, said first through hole and second through hole are positioned at the bottom of casing.
A kind of concrete prioritization scheme, the quantity of said first through hole and second through hole is several.
As a kind of prioritization scheme, said first through hole and second through hole are respectively arranged with O-ring seal, are provided with O-ring seal between said casing and the case lid.
As a kind of prioritization scheme, the inside surface of said casing is provided with groove, is provided with reinforcement with the groove corresponding position on the outside surface of said casing.
As a kind of prioritization scheme, the bottom of said casing is provided with groove, and the upper surface of said casing is provided with the convexity of annular.
As a kind of prioritization scheme, said case lid is provided with draw ring.
The utility model is taked above technical scheme, has the following advantages: the glass fibre reinforced plastic integral meter box comprises casing and case lid, and casing and case lid are tightly connected; The sidewall of casing is provided with and holds first through hole that pipeline penetrates and hold second through hole that pipeline passes, and meter box adopts glass fibre reinforced plastic integral to make low cost of manufacture; In light weight, easy for installation, and glass fibre reinforced plastic integral meter box intensity is high; Not fragile, long service life, maintenance cost is low; Casing and case lid are tightly connected, and casing is an one-piece construction, and antiseep is effective.
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Description of drawings
Accompanying drawing 1 is the structural representation of glass fibre reinforced plastic integral meter box among the utility model embodiment;
Accompanying drawing 2 is the vertical view of casing in the accompanying drawing 1;
Accompanying drawing 3 is the cut-open view of casing in the accompanying drawing 1.
Among the figure:
The 1-casing; 2-first through hole; The 3-O-ring seal; The 4-reinforcement; The 5-O-ring seal; The 6-draw ring; The 7-groove; The 8-groove; The 9-projection; The 10-case lid; 11-second through hole.
Embodiment
Embodiment: shown in accompanying drawing 1, the glass fibre reinforced plastic integral meter box comprises casing 1 and case lid 10, casing 1 be shaped as rectangle; Casing 1 all adopts reinforced plastic glass fibre reinforced plastic global formation with case lid 10, and intensity is big, and load force is strong, and casing 1 is tightly connected with case lid 10; Be provided with O-ring seal 5 between casing 1 and the case lid 10, O-ring seal 5 is the O-ring seal of annular, and O-ring seal 5 is the ethylene-propylene-diene monomer cushion rubber, good airproof performance; Antiseep property is good, and case lid 10 is provided with draw ring 6, and the quantity of draw ring 6 is two.
With shown in the accompanying drawing 3, the sidewall of casing 1 is provided with and holds first through hole 2 that pipeline penetrates and hold second through hole 11 that pipeline passes like accompanying drawing 1.
First through hole 2 is positioned on one of them sidewall of casing 1, and second through hole 11 is positioned on the sidewall relative with first through hole, 2 place sidewalls.
First through hole 2 and second through hole 11 are positioned at the bottom of casing 1, and first through hole 2 and second through hole 11 are symmetrical set.
The quantity of first through hole 2 and second through hole 11 is three, can increase or reduce the quantity of first through hole 2 and second through hole 11 as required.
First through hole 2 and second through hole, 11 places are provided with O-ring seal 3 respectively, and O-ring seal 3 is the ethylene-propylene-diene monomer cushion rubber, good airproof performance, and antiseep property is good.
First through hole 2 and second through hole 11 also can be arranged on the adjacent sidewall as required.
With shown in the accompanying drawing 3, the inside surface of casing 1 is provided with groove 7, is provided with reinforcement 4 with groove 7 corresponding positions on the outside surface of casing 1 like accompanying drawing 2.
The sidewall that casing 1 length is long is provided with two grooves 7; The short sidewall of casing 1 length is provided with a groove 7; Groove 7 on the sidewall vertically is provided with, and the groove 7 on the opposing sidewalls is symmetrical set, and the bottom of casing 1 is provided with three grooves 7; Article three, groove 7 is interconnected; Wherein groove 7 is communicated with groove 7 on the short sidewall of length, and two other groove 7 is communicated with groove 7 on the long sidewall of length, groove 7 and the 7 vertical settings of two other groove that casing 1 bottom and length are communicated with than the groove 7 on the sidewall of weak point.
The bottom of casing 1 is provided with groove 8, and groove 8 is communicated with groove 7, and when the pipe leakage in the casing 1, water can flow in the groove 8 through groove 7, the water in the groove 8 is discharged to get final product then.
The upper surface of casing 1 is provided with the convexity 9 of annular, and projection 9 cooperates with O-ring seal 5, has improved the sealing between casing 1 and the case lid 10.
During use, can water meter be installed in advance, after installing, be transported to the position of need installing, then with after water pipe is connected, whole landfill, simple to operate, easy installation and removal, and can adjust at random according to physical features.
This meter box adopts macromolecular material to process, and intensity is big, and is corrosion-resistant, in light weight, and good heat insulating can guarantee that water meter normally uses at-20 °~40 °, is convenient to transportation, installation, repairing, and maintenance cost is low.

Claims (10)

1. glass fibre reinforced plastic integral meter box; Comprise casing (1) and case lid (10); It is characterized in that: said casing (1) and case lid (10) are tightly connected, and the sidewall of said casing (1) is provided with and holds first through hole (2) that pipeline penetrates and hold second through hole (11) that pipeline passes.
2. glass fibre reinforced plastic integral meter box as claimed in claim 1 is characterized in that: said casing (1) be shaped as rectangle.
3. according to claim 1 or claim 2 glass fibre reinforced plastic integral meter box, it is characterized in that: said first through hole (2) is positioned on one of them sidewall of casing (1), and said second through hole (11) is positioned on the sidewall relative with first through hole (2) place sidewall.
4. glass fibre reinforced plastic integral meter box as claimed in claim 3 is characterized in that: said first through hole (2) and second through hole (11) are symmetrical set.
5. glass fibre reinforced plastic integral meter box as claimed in claim 4 is characterized in that: said first through hole (2) and second through hole (11) are positioned at the bottom of casing (1).
6. glass fibre reinforced plastic integral meter box as claimed in claim 5 is characterized in that: the quantity of said first through hole (2) and second through hole (11) is several.
7. according to claim 1 or claim 2 glass fibre reinforced plastic integral meter box, it is characterized in that: said first through hole (2) and second through hole (11) locate to be provided with respectively O-ring seal (3), are provided with O-ring seal (5) between said casing (1) and the case lid (10).
8. according to claim 1 or claim 2 glass fibre reinforced plastic integral meter box; It is characterized in that: the inside surface of said casing (1) is provided with groove (7); Be provided with reinforcement (4) with groove (7) corresponding position on the outside surface of said casing (1); The bottom of said casing (1) is provided with groove (8), and said groove (8) is communicated with groove (7).
9. according to claim 1 or claim 2 glass fibre reinforced plastic integral meter box, it is characterized in that: the upper surface of said casing (1) is provided with the convexity (9) of annular.
10. according to claim 1 or claim 2 glass fibre reinforced plastic integral meter box, it is characterized in that: said case lid (10) is provided with draw ring (6).
CN2011202586391U 2011-07-21 2011-07-21 Glass fiber reinforced plastic integral water meter box Expired - Fee Related CN202126291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202586391U CN202126291U (en) 2011-07-21 2011-07-21 Glass fiber reinforced plastic integral water meter box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202586391U CN202126291U (en) 2011-07-21 2011-07-21 Glass fiber reinforced plastic integral water meter box

Publications (1)

Publication Number Publication Date
CN202126291U true CN202126291U (en) 2012-01-25

Family

ID=45489356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202586391U Expired - Fee Related CN202126291U (en) 2011-07-21 2011-07-21 Glass fiber reinforced plastic integral water meter box

Country Status (1)

Country Link
CN (1) CN202126291U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787615A (en) * 2012-08-28 2012-11-21 济南水务集团有限公司 Anti-seepage meter well
CN103308109A (en) * 2013-06-24 2013-09-18 连云港水表有限公司 Sealing device for valve control water meter actuator
CN104762994A (en) * 2015-02-27 2015-07-08 浙江邦德管业有限公司 Pre-formed plastic water meter chamber and water meter mounting method
CN108303155A (en) * 2018-02-05 2018-07-20 桐乡恒通道路设施有限公司 Meter box and its production and processing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787615A (en) * 2012-08-28 2012-11-21 济南水务集团有限公司 Anti-seepage meter well
CN103308109A (en) * 2013-06-24 2013-09-18 连云港水表有限公司 Sealing device for valve control water meter actuator
CN103308109B (en) * 2013-06-24 2015-09-30 连云港水表有限公司 A kind of valve control water meter actuator packoff
CN104762994A (en) * 2015-02-27 2015-07-08 浙江邦德管业有限公司 Pre-formed plastic water meter chamber and water meter mounting method
CN108303155A (en) * 2018-02-05 2018-07-20 桐乡恒通道路设施有限公司 Meter box and its production and processing method

Similar Documents

Publication Publication Date Title
CN202126291U (en) Glass fiber reinforced plastic integral water meter box
CN201459902U (en) Rotational moulding inspection well
CN202047064U (en) Methane generating tank
CN101539346B (en) Hybrid solar vacuum hot water thermal insulating residual water pipe
CN203475580U (en) Multi-functional combined rainwater plastic inspection well
CN202298873U (en) Novel GRP (glass-reinforced plastic) drainage inspection well
CN202000374U (en) Plastic inspection well with function of freely connecting pipes
CN202227461U (en) Inspection well component capable of being combined rapidly
CN201188433Y (en) Groud-imbededd case for solar storage battery
CN201972169U (en) Integrated reinforced plastic inspection well
CN203498234U (en) Top-and-bottom combined type plastic septic tank
CN202091662U (en) Clockwise inserting opening structure of plastic steel wound tube
CN203429771U (en) Manhole
CN204081034U (en) A kind of Integral glass fibre reinforced plastic inspection pit
CN202672705U (en) Lower cuplock of cuplock type scaffold
CN203960988U (en) A kind of mouthful embedded plastic inspection well
CN203284802U (en) Inspection well body
CN201908322U (en) Polyethylene rotational moulding cable inspection shaft
CN202297325U (en) Reinforced glass fiber reinforced plastic septic tank
CN202925660U (en) Glass fiber reinforced plastic inspection well
CN201883455U (en) Reinforced concrete prefabricated combined inspection shaft
CN203213149U (en) Inspection well
CN202298871U (en) Straight wall plastic inspection well
CN201317776Y (en) Biogas production tank
CN201771046U (en) One-time formed plastic water discharge inspection well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20130721