CN202121254U - Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower - Google Patents
Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower Download PDFInfo
- Publication number
- CN202121254U CN202121254U CN201120167782XU CN201120167782U CN202121254U CN 202121254 U CN202121254 U CN 202121254U CN 201120167782X U CN201120167782X U CN 201120167782XU CN 201120167782 U CN201120167782 U CN 201120167782U CN 202121254 U CN202121254 U CN 202121254U
- Authority
- CN
- China
- Prior art keywords
- cross
- jig
- arm
- screw mandrel
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a cross arm lateral side clamp of a double-fission double-suspension insulator string for erecting a tower, which comprises two symmetrically arranged clamp bodies, wherein each clamp body comprises a lead screw device, a clamp cross arm module, an aluminum alloy hook head, and a connection piece arranged between the aluminum alloy hook head and a lead screw. A clamping groove, a connection hole and a through hole which is used for installing the lead screw are clamped in the cross arm and arranged on the clamp cross arm module, and the through hole used for installing the lead screw arranged on the clamp cross arm module is in a T-shaped structure. A positioning steering shaft is arranged on the lead screw, vertical to the lead screw, and clamped in the T-shaped through hole on the clamp cross arm module. The cross arm lateral side clamp has the advantages of not being restricted by structural limitation of the cross arm of an iron tower, and enabling clamping installation to be performed smoothly, thereby being flexible and convenient to install and wide in application range.
Description
Technical field
The utility model relates to the two suspension insulator erection mode forthright shaft towers of a kind of two division and uses jig, and the two suspension insulators of particularly a kind of two divisions set up the cross-arm side jig of shaft tower.
Background technology
At at present 220kV and above transmission line, because transmission capacity is bigger, in order to suppress corona discharge and to reduce line reactance, that improves circuit send electric energy power, and newly-increased 220kV transmission line majority has adopted the two suspension insulator erection modes of double bundle conductor.But brought some stubborn problems also for thus the live line working of circuit: with 220GUZ31 drum type tower is example; Because 220GUZ31 drum type tower is two wiring on the same tower modes of returning; This sections tower is from the general safety structural design, and the cross-arm width is short, and cross-arm side shrouding area is big.If adopt common jig operation, stopped by two insulator string strings under the jig, can't the insulation pull-rod that have gib head be connected with the cross-arm jig; If adopt common side jig, because cross-arm side shrouding area is big, the cross-arm jig can only be installed in and the lead position on same vertical line not, and the insulation arm-tie also can't be connected with jig, so can't realize the charged for replacement insulator operation of this sections tower.
The utility model content
The purpose of the utility model is that the weak point according to prior art provides a kind of two suspension insulators of two divisions that do not receive iron tower cross-arm structure limitations restrict to set up the cross-arm side jig of shaft tower.
The two suspension insulators of a kind of two division set up the cross-arm side jig of shaft tower, comprise two jig body of two symmetric arrays, are connected with jockey between two jig body; Each jig body comprises lead screw device; Jig cross-arm module, aluminium alloy gib head, the connector between aluminium alloy gib head and the screw mandrel; Its structural feature is: described jig cross-arm module is provided with the draw-in groove that snaps in cross-arm; On jig cross-arm module, also be provided with the connecting hole that is used for fixing the jockey between two jig body, on jig cross-arm module, also be provided for installing the through hole of screw mandrel, the degree of depth of described draw-in groove trend, with the connecting hole of jockey, and the length direction that the through hole of screw mandrel is installed parallel; The through hole that being used to of being provided with on the described jig cross-arm module installed screw mandrel is a kind of T shape structure; Screw mandrel is provided with the location steering spindle, and described location steering spindle and screw mandrel are perpendicular, and positioning rotating shaft is stuck in the T shape through hole on the jig cross-arm module.
The two suspension insulators of two divisions of this structure set up the cross-arm side jig of shaft tower; Owing on jig cross-arm module, be provided with this T shape through hole; And the location steering spindle is set on screw mandrel, general side jig can only be installed in directly over the lead with the same vertical line of lead, receives force direction can only receive pulling force vertically downward; After the new jig Design Orientation steering spindle; The side jig can be done the vertical wires axis direction and do certain angle swing, thereby it is stressed to make screw mandrel tilt to the direction of lead, thereby makes jig not receive the restriction of iron tower cross-arm structure.
Described location steering spindle or for to constitute by a bearing pin that passes screw mandrel, or the location steering spindle that can be placed on the screw mandrel by cross constitutes.
Jockey between two jig body is a kind of length-adjustable connecting device.
Described length-adjustable connecting device is served as reasons above that and to be constituted along two pull bars of the jack in a row of its axial distribution or arm-tie, through two pull bars or arm-tie are connected the length that just can realize regulating jockey with respect to different jacks.
Described length-adjustable connecting device is for to be made up of the nut lead screw device.
The nut lead screw device of described adjustable in length includes one section hollow pipe, and the inner chamber at the hollow pipe two ends is provided with screw thread, is provided with two screw mandrels that are complementary with hollow pipe at the two ends of hollow pipe inner chamber, also is provided with the handle that is used to handle on the hollow pipe.
When shaking handle, can realize stretching and contract of the relative hollow pipe of two screw mandrels.
Connector between aluminium alloy gib head and the screw mandrel is articulated on the insulation arm-tie for insulation arm-tie, aluminium alloy gib head.
The aluminium alloy gib head is articulated on the insulation arm-tie; So just can avoid when the double bundle conductor of below and cross-arm jig installation site, top not on same vertical line; The shearing force that the insulation arm-tie will bear double bundle conductor; And if cause continue to tighten up the jig screw mandrel, the suffered shearing force of insulation arm-tie will continue increase, rupture because of shearing force is excessive easily.
Connector between aluminium alloy gib head and the screw mandrel or for the insulation jack line, hang a pulley in the lower end of screw mandrel, the insulation jack line hang on the pulley, then again with the aluminium alloy gib head hang on the insulation jack line on.
Adopt insulation jack line suspension aluminium alloy gib head, and the jack line that will insulate hangs on the pulley that is installed on the screw mandrel, so just can be as required adjustment voluntarily, thereby make jig be in good stress.
The connecting hole that is used for fixing the jockey between two jig body that on jig cross-arm module, is provided with is a screwed hole.
In sum, the advantage of the utility model is:
The two suspension insulators of two divisions of the utility model set up the cross-arm side jig of shaft tower; Can make side jig screw mandrel receive force direction perpendicular to traverse shaft to; The design that has added soft insulation jack line makes stressed connection of safety between jig and the lead; This kind side jig does not receive iron tower cross-arm structure limitations restrict, can carry out jig smoothly and install.Have convenient and flexible installation, have widely applicable advantage.
Description of drawings
Fig. 1 is that the two suspension insulators of the two divisions of the utility model set up the structural representation of the cross-arm side jig body of shaft tower.
Fig. 2 is the A place enlarged drawing of Fig. 1.
Fig. 3 is the structural representation behind the cross-arm side jig body swing certain angle.
Fig. 4 is the structural representation that two jig body link together.
Specific embodiment
Below in conjunction with embodiment the utility model is done and to be further described.
Most preferred embodiment:
A kind of two suspension insulators of two divisions shown in Fig. 1-4 set up the cross-arm side jig of shaft tower, comprise between jig body 1, two jig body of two symmetric arrays being connected with jockey 2; Each jig body comprises lead screw device 11; Jig cross-arm module 12, aluminium alloy gib head 13, the connector 3 between aluminium alloy gib head 13 and the screw mandrel 111; Described jig cross-arm module 12 is provided with the draw-in groove 121 that snaps in cross-arm; On jig cross-arm module, also be provided with the connecting hole 122 that is used for fixing the jockey between two jig body, on jig cross-arm module, also be provided for installing the through hole 123 of screw mandrel, the degree of depth of described draw-in groove trend, with the connecting hole of jockey, and the length direction that the through hole of screw mandrel is installed parallel; The through hole that being used to of being provided with on the described jig cross-arm module installed screw mandrel is a kind of T shape structure; Screw mandrel is provided with location steering spindle 1111, and described location steering spindle and screw mandrel are perpendicular, and positioning rotating shaft is stuck in the T shape through hole on the jig cross-arm module.Described location steering spindle is to be made up of the location steering spindle that cross can be placed on the screw mandrel.Jockey between two jig body is a kind of length-adjustable connecting device.Described length-adjustable connecting device is for to be made up of the nut lead screw device.The nut lead screw device of described adjustable in length includes one section hollow pipe, and the inner chamber at the hollow pipe two ends is provided with screw thread, is provided with two screw mandrels that are complementary with hollow pipe at the two ends of hollow pipe inner chamber, also is provided with the handle that is used to handle on the hollow pipe.Connector 3 between aluminium alloy gib head and the screw mandrel hangs a pulley 4 for the insulation jack line in the lower end of screw mandrel, the insulation jack line hangs on the pulley, then the aluminium alloy gib head is hung on the insulation jack line again.
It is identical with prior art that present embodiment is not stated part.
Claims (8)
1. one kind pair is divided the cross-arm side jig that two suspension insulators set up shaft tower, comprises two jig body of two symmetric arrays, is connected with jockey between two jig body; Each jig body comprises lead screw device; Jig cross-arm module, aluminium alloy gib head, the connector between aluminium alloy gib head and the screw mandrel; It is characterized in that: described jig cross-arm module is provided with the draw-in groove that snaps in cross-arm; On jig cross-arm module, also be provided with the connecting hole that is used for fixing the jockey between two jig body, on jig cross-arm module, also be provided for installing the through hole of screw mandrel, the degree of depth of described draw-in groove trend, with the connecting hole of jockey, and the length direction that the through hole of screw mandrel is installed parallel; The through hole that being used to of being provided with on the described jig cross-arm module installed screw mandrel is a kind of T shape structure; Screw mandrel is provided with the location steering spindle, and described location steering spindle and screw mandrel are perpendicular, and positioning rotating shaft is stuck in the T shape through hole on the jig cross-arm module.
2. the two suspension insulators of two division according to claim 1 set up the cross-arm side jig of shaft tower; It is characterized in that: described location steering spindle or for to constitute by a bearing pin that passes screw mandrel, or the location steering spindle that can be placed on the screw mandrel by cross constitutes.
3. the two suspension insulators of two division according to claim 2 set up the cross-arm side jig of shaft tower, and it is characterized in that: the jockey between two jig body is a kind of length-adjustable connecting device.
4. the two suspension insulators of two division according to claim 3 set up the cross-arm side jig of shaft tower, and it is characterized in that: described length-adjustable connecting device is for to be made up of the nut lead screw device.
5. the two suspension insulators of two division according to claim 4 set up the cross-arm side jig of shaft tower; It is characterized in that: the nut lead screw device of described adjustable in length includes one section hollow pipe; Inner chamber at the hollow pipe two ends is provided with screw thread; Be provided with two screw mandrels that are complementary with hollow pipe at the two ends of hollow pipe inner chamber, also be provided with the handle that is used to handle on the hollow pipe.
6. the two suspension insulators of two division according to claim 5 set up the cross-arm side jig of shaft tower, it is characterized in that: the connector between aluminium alloy gib head and the screw mandrel is articulated on the insulation arm-tie for insulation arm-tie, aluminium alloy gib head.
7. the two suspension insulators of two division according to claim 5 set up the cross-arm side jig of shaft tower; It is characterized in that: the connector between aluminium alloy gib head and the screw mandrel or for the insulation jack line; Hang a pulley in the lower end of screw mandrel; The insulation jack line hangs on the pulley, then the aluminium alloy gib head is hung on the insulation jack line again.
8. according to claim 6 or 7 described two cross-arm side jigs that two suspension insulators set up shaft tower that divide, it is characterized in that: the connecting hole that is used for fixing the jockey between two jig body that on jig cross-arm module, is provided with is a screwed hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120167782XU CN202121254U (en) | 2011-05-24 | 2011-05-24 | Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120167782XU CN202121254U (en) | 2011-05-24 | 2011-05-24 | Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202121254U true CN202121254U (en) | 2012-01-18 |
Family
ID=45462291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120167782XU Expired - Fee Related CN202121254U (en) | 2011-05-24 | 2011-05-24 | Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202121254U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102611036A (en) * | 2012-03-15 | 2012-07-25 | 福建省电力有限公司三明电业局 | Spacing-adjustable cross arm fixator |
CN102623927A (en) * | 2012-03-31 | 2012-08-01 | 湖南省电力公司株洲电业局 | Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line |
CN103715628A (en) * | 2013-12-16 | 2014-04-09 | 国家电网公司 | Clamp for charged replacement of tangent tower insulators |
CN103746313A (en) * | 2013-12-16 | 2014-04-23 | 国家电网公司 | Protection strengthening type wing-shaped fixture |
CN105186366A (en) * | 2015-09-21 | 2015-12-23 | 云南电网有限责任公司普洱供电局 | Vertical double-hanging clamp |
CN105186374A (en) * | 2015-09-29 | 2015-12-23 | 国网浙江省电力公司金华供电公司 | Line raising structure and universal support on 500kV power transmission line tower |
CN105261993A (en) * | 2015-09-30 | 2016-01-20 | 国家电网公司 | Power transmission line aerial work lifting platform |
CN108756435A (en) * | 2018-07-21 | 2018-11-06 | 国家电网有限公司 | Cross-arm locator |
CN109580212A (en) * | 2019-01-25 | 2019-04-05 | 广东电网有限责任公司 | A kind of cross arm lateral side clamp tension test tool |
-
2011
- 2011-05-24 CN CN201120167782XU patent/CN202121254U/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102611036A (en) * | 2012-03-15 | 2012-07-25 | 福建省电力有限公司三明电业局 | Spacing-adjustable cross arm fixator |
CN102623927A (en) * | 2012-03-31 | 2012-08-01 | 湖南省电力公司株洲电业局 | Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line |
CN102623927B (en) * | 2012-03-31 | 2015-09-16 | 湖南省电力公司株洲电业局 | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method |
CN103715628B (en) * | 2013-12-16 | 2017-01-11 | 国家电网公司 | Clamp for charged replacement of tangent tower insulators |
CN103715628A (en) * | 2013-12-16 | 2014-04-09 | 国家电网公司 | Clamp for charged replacement of tangent tower insulators |
CN103746313A (en) * | 2013-12-16 | 2014-04-23 | 国家电网公司 | Protection strengthening type wing-shaped fixture |
CN105186366A (en) * | 2015-09-21 | 2015-12-23 | 云南电网有限责任公司普洱供电局 | Vertical double-hanging clamp |
CN105186374A (en) * | 2015-09-29 | 2015-12-23 | 国网浙江省电力公司金华供电公司 | Line raising structure and universal support on 500kV power transmission line tower |
CN105261993A (en) * | 2015-09-30 | 2016-01-20 | 国家电网公司 | Power transmission line aerial work lifting platform |
CN105261993B (en) * | 2015-09-30 | 2019-02-26 | 国家电网公司 | Transmission line of electricity lifting highrise operation platform |
CN108756435A (en) * | 2018-07-21 | 2018-11-06 | 国家电网有限公司 | Cross-arm locator |
CN109580212A (en) * | 2019-01-25 | 2019-04-05 | 广东电网有限责任公司 | A kind of cross arm lateral side clamp tension test tool |
CN109580212B (en) * | 2019-01-25 | 2024-02-13 | 广东电网有限责任公司 | Cross arm side fixture tensile test instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202121254U (en) | Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower | |
CN106930594A (en) | A kind of insulator crossarm and power tower | |
CN102694284A (en) | Grounding wire clamp with universal joint | |
CN204885990U (en) | Transmission line yoke plate hoisting device | |
CN203732572U (en) | Telescopic high-altitude wire clamp | |
CN203747299U (en) | Mountable and dismountable dual-purpose airfoil-profile clamping device | |
CN208142787U (en) | Aluminium alloy aerial insulated cable fixes device | |
CN103779809B (en) | The two oidiospore wire pitch operational method of charged adjustment | |
CN203491604U (en) | High-voltage tension resistant insulator string auxiliary installation device | |
CN202260340U (en) | Power distribution network overhead line insulation tower head hoisting tool | |
CN211239257U (en) | Drainage line pair bracing strut convenient to installation | |
CN103606849B (en) | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof | |
CN202363811U (en) | Cross arm clamping device for replacing insulator of direct-current 500kv straight-line string | |
CN211088959U (en) | Distribution network uninterrupted operation integrated insulated wiring device | |
CN103762519B (en) | A kind of dual-purpose wing type clamp apparatus of self-mountable & dismountuble | |
CN107425466A (en) | Wire lifts insulating support and its application method | |
CN202423961U (en) | Triangular hook for leads | |
CN111682450A (en) | Universal clamp for live replacement of strain duplex insulator string and operation method | |
CN202423960U (en) | Electrified insulator fastening tool | |
CN201473241U (en) | Hoisting tool for overhead lines of power distribution network | |
CN221448049U (en) | Strain clamp | |
CN214942960U (en) | Tower pole body | |
CN220401395U (en) | Cable support | |
CN219329597U (en) | Double-split suspension clamp | |
CN218335017U (en) | Ground wire ice-melting wiring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120118 Termination date: 20180524 |
|