CN202120077U - Cement plant integrated system capable of monitoring, figuring and inquiring in real time - Google Patents

Cement plant integrated system capable of monitoring, figuring and inquiring in real time Download PDF

Info

Publication number
CN202120077U
CN202120077U CN2011200610536U CN201120061053U CN202120077U CN 202120077 U CN202120077 U CN 202120077U CN 2011200610536 U CN2011200610536 U CN 2011200610536U CN 201120061053 U CN201120061053 U CN 201120061053U CN 202120077 U CN202120077 U CN 202120077U
Authority
CN
China
Prior art keywords
production
cement
department
real time
enterprise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200610536U
Other languages
Chinese (zh)
Inventor
叶金辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200610536U priority Critical patent/CN202120077U/en
Application granted granted Critical
Publication of CN202120077U publication Critical patent/CN202120077U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a cement plant integrated system capable of monitoring, figuring and inquiring in real time. The integrated system includes a cement production line DCS system, an attendance management system, a security monitoring system, a production figuring system, a production marketing system, and a manager system. In the utility model, control stations of the security monitoring system, the attendance management system and the production line DCS system are connected with a multi-port switchboard in parallel and connected to an industrial Ethernet through the switchboard. The industrial Ethernet is an enterprise backbone network. Engineer stations (management data server) of the cement production DCS system and corresponding operator stations are connected to the enterprise backbone network. Office networks of a security department, a personnel department, a production figuring department, a production marketing department and a management department are connected to the enterprise backbone network. The integrated system capable of monitoring, figuring and inquiring in real time in the utility model enables enterprise managers and technicians to monitor and inquire the cement production and marketing conditions in real time in offices. Thus, the enterprise management process is simplified, and the enterprise management efficiency and production efficiency are improved.

Description

The cement mill is monitored the statistical query integral system in real time
Technical field
The utility model belongs to the technology of producing cement field, particularly relates to a kind of cement mill and monitors the statistical query integral system in real time.
Background technology
At present; Cement mill management and technician want to understand the ruuning situation of cement producing line; Comprise each equipment running, technological parameter and consumption of raw materials, output form etc., can only be through checking that to central control room the picture of DCS system or phone demand operating person's mode understand in person, and equipment running, operation trend and technological parameter can not be paid close attention in real time; Work efficiency is reduced, be unfavorable for improving the level of aggregation of production management.
Summary of the invention
Compared to prior art; The utility model provides a kind of cement mill to monitor the statistical query integral system in real time; Through to the monitoring camera-shooting collection of production scene, the collection of middle control DCS system, the collection that statistical department produces relevant form; Running status, operational factor, the consumption of raw material electric power, the alarm history in the operational process of having realized real-time monitoring production equipment writes down, manufacture of cement is correlated with form or the like; Make enterprise administrator and technician home-confined, the just operation of monitoring and inquiry manufacture of cement and sales situation in real time in oneself office, the management process of simplification enterprise; Improve the efficiency of management, the production efficiency of enterprise, reduced production cost.
The utility model solves the technical scheme that its technical matters adopted:
A kind of cement mill is monitored the statistical query integral system in real time, it is characterized in that: native system comprises cement producing line DCS system, Work attendance management system, safety defense monitoring system, production statistical system, product distribution system, supvr system.Cement producing line DCS system comprises raw material control station, kiln tail control station, kiln hood control station, cement grinding mill control station, cogeneration control station and engineer station, corresponding operator station.Safety defense monitoring system comprises camera facility, policer operation machine.Work attendance management system comprises attendance recorder, work attendance manipulator.
The parallel access of safety defense monitoring system, Work attendance management system and production line DCS system control station oral sex more than is changed planes, through switch access industrial Ethernet, i.e. enterprise's backbone network.The engineer station's (management data server) and the corresponding operator station of manufacture of cement DCS system are inserted enterprise's backbone network, and backbone network can be star topology, ring topology, also can be bus type topological structure.The office LAN at security protection department, personnel department, production statistical department, production marketing department, supvr department place is inserted enterprise's backbone network; Receive the infringement of virus, wooden horse for fear of the DCS system; Between DCS system and office LAN, set up a hardware firewall, have killing virus, prevent to invade function.So far, native system adopts Ethernet as the industrial control network agreement, and in native system, Ethernet is linked up the Industry Control layer of lower floor and the enterprise management information network on upper strata, has played the effect of fusion bridge for them.
Production automation DCS system and safety defense monitoring system, Work attendance management system exchange data and information through exchange data; Import management data server and Central Control Room engineer station of production department and operator station into; Operating personnel control production run according to the information data that feeds back; Work attendance after the management data server process and monitor data information are imported security protection portion and Human Resources Department into, carry out bookkeeping by the corresponding work personnel.The management data server is because be connected with the office computer crowd, and the departments such as producing and selling, security protection, occurrences in human life, logistics, storage of can handling official business to enterprise carry out data entry, statistics, storage, guidance, management.
Pass through shared same operating platform, same EPA, same database, same compatible brand system hardware based on supvr's computer cluster; Same software systems; Database in the Sharing Management data server; The supvr of different positions is assigned the different operation authority, on the net Anywhere, as long as the user name of input oneself and password just can get into data message in the system queries corresponding authority.
The cement mill is monitored the statistical query integral system in real time and for the supvr cost revenue and expenditure and accounting information, cost analysis and information of forecasting, production and operation information, product sale information in real time is provided; Make cement mill decision maker, supvr can grasp the production run and the distribution state of cement mill at any time; Analyze the enterprise cost alteration trend, for correct decisions provides foundation.
The beneficial effect of the utility model is, keep that the interdepartmental information in cement mill transmits in time with unobstructed, the leader is monitoring and inquiry Cement Production and marketing information in real time, makes correct decision-making, makes things convenient for the management and the control of enterprise.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is that the cement mill is monitored statistical query integral system synoptic diagram in real time.
Among the figure
1. cement producing line DCS active station 2. management data servers (production line engineer station)
3. 4. switch of enterprise's backbone network (EPA)
5. monitoring camera 6. policer operation machines
7. work attendance manipulator 8. attendance recorders
9. production equipment control station 10. hardware firewall
11. 12. Human Resources Departments of security protection portion
13. sales department's 14. Department of Statistics
15. supvr department
Embodiment
In Fig. 1; The described cement mill of the utility model is monitored the statistical query integral system in real time; Safety defense monitoring system (5,6), Work attendance management system (7,8) and raw material control station, kiln tail control station, kiln hood control station, cement grinding mill control station, the parallel access of cogeneration control station oral sex more than are changed planes (4), insert enterprise's backbone network (3) through switch (4).The engineer station (2) (management data server) of manufacture of cement DCS system, corresponding operator (1) are stood and insert enterprise's backbone network (3), and backbone network (3) can be star topology, ring topology, also can be bus type topological structure.The office LAN at security protection portion (11), Human Resources Department (12), production statistical department (14), production marketing department (13), supvr department (15) place is inserted enterprise's backbone network (3); Receive the infringement of virus, wooden horse for fear of the DCS system; Between DCS system and office LAN, set up a hardware firewall (10), have killing virus, prevent to invade function.

Claims (5)

1. a cement mill is monitored the statistical query integral system in real time; Comprise cement producing line DCS system, Work attendance management system, safety defense monitoring system, production statistical system, product distribution system, supvr system; It is characterized in that: native system is changed planes the parallel access of safety defense monitoring system, Work attendance management system and production line DCS system control station oral sex more than; Through switch access industrial Ethernet, i.e. enterprise's backbone network; The engineer station of manufacture of cement DCS system is inserted enterprise's backbone network with corresponding operator station, with the office LAN access enterprise backbone network at security protection department, personnel department, production statistical department, production marketing department, supvr department place.
2. cement mill according to claim 1 is monitored the statistical query integral system in real time, it is characterized in that: described cement producing line DCS system comprises raw material control station, kiln tail control station, kiln hood control station, cement grinding mill control station, cogeneration control station and engineer station, corresponding operator station.
3. cement mill according to claim 1 is monitored the statistical query integral system in real time, it is characterized in that: described safety defense monitoring system comprises camera facility, policer operation machine.
4. cement mill according to claim 1 is monitored the statistical query integral system in real time, it is characterized in that: described Work attendance management system comprises attendance recorder, work attendance manipulator.
5. cement mill according to claim 1 is monitored the statistical query integral system in real time, it is characterized in that: between production line DCS system and office LAN, set up a hardware firewall.
CN2011200610536U 2011-03-10 2011-03-10 Cement plant integrated system capable of monitoring, figuring and inquiring in real time Expired - Fee Related CN202120077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200610536U CN202120077U (en) 2011-03-10 2011-03-10 Cement plant integrated system capable of monitoring, figuring and inquiring in real time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200610536U CN202120077U (en) 2011-03-10 2011-03-10 Cement plant integrated system capable of monitoring, figuring and inquiring in real time

Publications (1)

Publication Number Publication Date
CN202120077U true CN202120077U (en) 2012-01-18

Family

ID=45461128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200610536U Expired - Fee Related CN202120077U (en) 2011-03-10 2011-03-10 Cement plant integrated system capable of monitoring, figuring and inquiring in real time

Country Status (1)

Country Link
CN (1) CN202120077U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103019184A (en) * 2012-11-22 2013-04-03 江苏新街南方水泥有限公司 Informationized cement production management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103019184A (en) * 2012-11-22 2013-04-03 江苏新街南方水泥有限公司 Informationized cement production management system

Similar Documents

Publication Publication Date Title
CN112165501A (en) Remote operation and maintenance system and method for product analysis based on industrial internet identification
CN102158401B (en) Flow monitoring model based on electric automation system
CN107200248A (en) A kind of elevator Internet of Things network operation real-time monitoring system based on cloud platform
CN109086895A (en) A kind of operation management system and method for heating ventilation air-conditioning system
CN107065802A (en) A kind of automatic management scheduling system of the energy
CN106651633A (en) Power utilization information acquisition system and method based on big data technology
CN105631522A (en) IT system operation and maintenance management system
CN107911367A (en) One kind digitlization workshop network and data exchange system
CN109190944A (en) Medicine enterprise manufactures execution system
CN105207853A (en) Local area network monitoring management method
CN102122374A (en) Intelligent analysis system for flow abnormity of power automation system
CN110995736A (en) Universal industrial Internet of things equipment management system
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN103093395A (en) Method and equipment of blackout monitoring service dispatching
CN102968696A (en) Marketing-distribution-dispatch business system information fusion and application method
CN101605065A (en) The implementation method of security incident monitoring in the system of security centre
CN106378436A (en) Die casting production information monitoring system based on mobile internet
CN206298231U (en) Elevator repair and maintenance managing device based on bluetooth and Mobile Data Communication Technology
CN106022487A (en) Intelligent device operation and maintenance management system
CN101707528B (en) Method for transmitting alarm data of centralized monitoring system
CN114254982A (en) Smart factory cloud management system
CN102591295A (en) Cement mill real-time monitoring statistics query integration system
CN102591289A (en) Cement plant managing and controlling integrated system
CN110263950B (en) Network management analysis system based on electric power wireless private network
CN102707686A (en) Injection molding machine networking system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Ye Jinhui

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Ye Jinhui

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20140310