CN202114804U - Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates - Google Patents

Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates Download PDF

Info

Publication number
CN202114804U
CN202114804U CN2011202393238U CN201120239323U CN202114804U CN 202114804 U CN202114804 U CN 202114804U CN 2011202393238 U CN2011202393238 U CN 2011202393238U CN 201120239323 U CN201120239323 U CN 201120239323U CN 202114804 U CN202114804 U CN 202114804U
Authority
CN
China
Prior art keywords
production
prestressed concrete
draw
steel
stretch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202393238U
Other languages
Chinese (zh)
Inventor
欧阳炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202393238U priority Critical patent/CN202114804U/en
Application granted granted Critical
Publication of CN202114804U publication Critical patent/CN202114804U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates, which is characterized by comprising one or a multiple production units. Each production unit includes four symmetrical production areas, each production area is provided with a steel model used for producing track plates, a transverse tensioning end beam, a transverse fixing end beam, a longitudinal tensioning end beam and a longitudinal fixing end beam which are used for fixing steel wires are respectively arranged at four edges of each production area, and a transverse tensioning mechanism or longitudinal tensioning mechanism corresponding to the position of the steel model is arranged between each two adjacent edges of each production area. In each production unit, at most six steel models can be in centrosymmetric arrangement transversely, and at least two steel models can be arranged longitudinally. During operation, the tensioning mechanisms in the middles can be used for completing tensioning operations at one step respectively, so that cost can be saved greatly, production efficiency can be improved and batch production can be carried out easily.

Description

Bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain
Technical field
The utility model belongs to the manufacturing technology field of high speed railway fragments-free track slab.More particularly, the utility model relates to a kind of bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain.
Background technology
Continuous development along with science and technology; There is tiny fragments of stone, coal, etc. track progressively to be eliminated because of its all drawback; And non-fragment orbit is because of its high reliability, high ride, high-durability and almost do not have characteristics such as track maintenance and in the construction of high-speed railway, progressively adopted, but the key technology of non-fragment orbit is track plate and manufacturing process thereof.
The track plate that is laid on above the roadbed bears the pressure from two rail because of it, along with the prolongation of time, often because of receiving external force deformation to cause that the phenomenon of crack or fracture appears in the track plate, therefore causes unnecessary loss.Simultaneously, safeguard also very inconvenience.For this reason, in the manufacture process of track plate,, and it is applied prestressing force, reduce the distortion that the track plate is caused by external force with this often to reinforcing bar or steel strand wires or rod iron or steel wire are set in the track plate.Applying of track slab prestress can be adopted pre-tensioning system and post stretching.In practical application, mostly existing track plate is post-tensioned prestressed concrete railway board, and its manufacturing process is very complicated, and production efficiency is low, and needs a large amount of ground tackles for the anchoring presstressed reinforcing steel.In addition; Current external various types of track plates all are arranged in prestressed steel bar on the kernel of section line; So must dispose the regular reinforcement cage in addition; Strengthen the intensity of track plate with this, this makes the cost of track plate increase greatly, and has brought in the upper and lower net sheet of steel reinforcement cage in length and breadth problem such as reinforcing bar insulation difficulty then.
Based on above reason, the scientific research personnel is carrying out unremitting effort always, and constantly seeks new, practical method to solve problems such as the concrete railway board manufacturing process is complicated, cost is high, track circuit is undesirable.Particularly; The present inventor has proposed a kind of bidirectional pre-tensioned prestressed concrete railway board and manufacturing process thereof respectively in one Chinese patent application No.200610017788.2 and one Chinese patent application No.201010136938.8, the full content in above-mentioned two patent applications combines in this application by reference.
Compare with common track plate of the prior art, above-mentioned bidirectional pre-tensioned prestressed concrete railway board has following feature and advantage:
(1) bidirectional pre-tensioned prestressed concrete railway board is symmetrically arranged in the both sides, cross section of track plate with the two dimension prestressing steel wire, can bear the multiple effect of cracking resistance, bending resistance and distributing bar simultaneously, and longitudinal reinforcement can also directly be used for vertical the couplet, and a muscle is used more.
(2) the vertical, horizontal steel wire of bidirectional pre-tensioned prestressed concrete railway board is in heavily stressed tensioned state, can keep the for example gap of 6mm, does not contact mutually.There is not any metallic closed loop in the track plate, on structural configuration, realizes insulation between the steel wire.
(3) the compressor wire cloth muscle of bidirectional pre-tensioned prestressed concrete railway board disperses, and the effective compressive pre-stress of concrete is more even, thereby has higher cracking resistance.
(4) because compressor wire is arranged in the natural axis both sides; Reduced the prestressing force eccentricity value of some pair cross-section with joint efforts; Simultaneously the steel wire arranged of both sides has certain inhibitory action to track slab warping distortion, thus bidirectional pre-tensioned pre-stress rail plate because of concrete shrinkage and creep or plate at the bottom of, the buckling deformation that produces of the plate face temperature difference is less.
(5) because bidirectional pre-tensioned prestressed concrete railway board steel content is lower; And no any metallic closed loop exists in the plate; The steel wire apart arrangement has good insulation, therefore need not add any insulation measures, can satisfy the track circuit demand of various signaling modes.
(6) bidirectional pre-tensioned prestressed concrete railway board structure has the high cracking resistance ability, is guaranteeing that the durability of pre-tensioned prestressed concrete track plate is fine under the condition that concrete batching, construction, maintenance require in strict conformity with durability concrete.
(7) owing to cancelled regular reinforcement cage, anchor plate and posttension ground tackle and saved insulation expense etc., compare with posttension track plate, the cost of bidirectional pre-tensioned prestressed concrete railway board is very cheap.
(8) bidirectional pre-tensioned prestressed concrete railway board is not only applicable to the spacing cell board of round boss, is applicable to the vertical spacing vertical yoke plate that joins yet.In addition, pre-tensioned prestressed concrete track plate can be used for cell board and vertical yoke plate, even the two ends of same block of track plate can adopt different limit methods, this for line get on the right track plate type selecting, arrange great flexibility be provided.
At present, a kind of technology that is used for the batch process of bidirectional pre-tensioned prestressed concrete railway board is the flowing water machine sets method production process.For example, the flowing water machine sets method production process that a kind of streamline that is suitable for above-mentioned bidirectional pre-tensioned prestressed concrete railway board is produced is disclosed among the aforementioned one Chinese patent application No.201010136938.8.In this technology, the pulling force that the prestressing force steel hinge line of the pulling force of the compressor wire that bear on steel model top and steel model bottom produces reaches equilibrium of forces through steel model under(-)chassis and template, and guarantees the flatness of product with this.Yet, in the long-term production practice, find that the prestressing force of steel model bottom is difficult to obtain effective monitoring and adjustment, so the flatness of product is difficult to guarantee.
Another kind of admissible track plate producing process is the long-line pedestal working system.Yet, need around steel model, all implement stretch-draw when producing and put Zhang Zuoye owing to bidirectional pre-tensioned prestressed concrete railway board, tensioning system that need be a large amount of, this causes the rapid rising of production line cost.And; Long-line pedestal method is along the unidirectional stretch-draw of pedestal direction; If use jack tension vertical direction reinforcing bar in its pedestal both sides, also can realize the production of existing product, but being exactly every mould, the problem that occurs needs one group of jack; Along with the increase of jack quantity, expense significantly rising, complicated operation, problem that effect is very low have been brought.In addition; With regard to high-speed railway developed country in the world; High-speed railway mainly adopts the I type track plate of Japan and the II type track plate of Germany in the world at present; Wherein the I type track plate of Japan adopts monolithic mould post stretching production technology, and the II template of Germany adopts unidirectional first Zhang Gong productions of planting, owing to bidirectional pre-tensioned prestressed concrete railway board is different fully with above two kinds of track intralamellar part structures; Therefore above two kinds of production technologies all can not simply be overlapped in the production of using the bidirectional pre-tensioned concrete railway board of prestressing force, can only be as a reference.And, up to now, do not find to have the precedent of producing bidirectional pre-tensioned concrete prefabricated element in batches as yet.
The utility model content
In view of above background, for overcoming above-mentioned defective of the prior art, the purpose of the utility model is to provide a kind of and is easy to produce in batches, higher, the lower-cost bidirectional pre-tensioned prestressed concrete railway board production method of production efficiency.
For achieving the above object; The utility model proposes a kind of bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain; It comprises one or more production units; Each production unit comprises four symmetrically arranged production areas; Be provided for producing the steel model of track plate in each production area, four limits of each production area are provided for fixedly transverse stretching end carriage and crosswise fixed end carriage and vertically the stretch-draw end carriage and vertically fixed end beam of steel wire respectively, and the transverse stretching mechanism corresponding with the steel model position or vertical stretch-draw mechanism are set between the adjacent edge of each production area.
According to the technique scheme of the utility model, in each production unit, can arrange no more than six steel model symmetrically in the center in the horizontal, can arrange the steel model more than two in the vertical.During work, the stretch-draw mechanism in the middle of can using respectively once accomplishes the stretch-draw operation, thereby can practice thrift cost greatly, and enhances productivity, and is easy to produce in batches.
Post stretching production technology many with operation, that production efficiency is low, need to consume a large amount of ground tackles, cost is high, product quality is difficult for guaranteeing and be inappropriate for large-scale promotion application is compared; The production technology of the bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model is easy; And the cost of member good mechanical performance, particularly member reduces greatly.
More particularly; The utility model can be realized following remarkable beneficial effect: be arranged on the middle part of production line owing to comprise the transverse stretching mechanism and the tensioning system of vertical stretch-draw mechanism; Can make the interior steel wire simultaneous tension of steel model of production line both sides; Thereby practiced thrift a large amount of tensioning systems, the manufacturing cost of production line is reduced greatly; Because single tension polylith steel model is so improved production efficiency; Vertically steel wire is longer between the steel model, and the gap between the horizontal one-sided steel model is less, and laterally only there is less displacement in steel model when loosening steel wire stress, and the track plate is had no damage.
Advantageously; In said transverse stretching mechanism and the said vertical stretch-draw mechanism each comprises the stretch-draw jack; The two ends of said stretch-draw jack are provided with the little end carriage of stretch-draw respectively, and the stretch-draw small end beam at two ends is in transmission connection with the end carriage of adjacent edge of the heteropleural production area of himself place side respectively.
Advantageously, each in said transverse stretching mechanism and the said vertical stretch-draw mechanism is with respect to the paired setting of end carriage and be provided with two groups at least.
Advantageously, said transverse stretching mechanism and said vertical stretch-draw mechanism all are provided with stretching force detecting apparatus and/or self-locking mechanism.
Advantageously, around the said production unit counter force wall is set, fixedly brings in the pulling force that bears compressor wire as compressor wire.
Advantageously, in said four production areas, steel model is set symmetrically, delegation's one row steel model is set in each production area at least.
Advantageously, said steel model around be provided with wiring connector, can further improve production efficiency thus, and can realize demoulding limit, limit go into the silk operation procedure.
Advantageously, the steel model in the said production area is built on stilts to be provided with, and in the downside reservation operations space of steel model, thereby is the conditions that facilitate such as maintenance of equipment, installation.For example; Steel model is built on stilts to be placed on the production line concrete frame; Below steel model, have a space that supplies installation, maintenance, layout pipeline, the residual quarrel of cleaning spillage, simultaneously, this space has increased the thermal capacity of production line; Help flowing of steam or hot gas, thereby improved the maintenance quality of track plate.
Description of drawings
Through below in conjunction with the detailed description of accompanying drawing about the specific embodiment of the utility model, will help clearer, intactly understand further feature, details and the advantage of the utility model.Wherein:
Fig. 1 is the floor plan sketch map of production unit of bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of an example embodiment of the utility model;
Fig. 2 is the horizontal cross-sectional schematic with the production unit shown in Figure 1 shown in the magnification ratio;
Fig. 3 is the vertical cross-sectional schematic with the production unit shown in Figure 1 shown in the magnification ratio.
The specific embodiment
Describe the utility model in detail through example embodiment below.Be pointed out that, those skilled in the art will readily appreciate that following examples only are exemplary, it does not also mean that the utility model is carried out any restriction.
Fig. 1 shows the floor plan sketch map of production unit of bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of an example embodiment of the utility model, and this production line can comprise one or more production units according to actual needs.As shown in the figure; Each production unit comprises four symmetrically arranged production areas 2,3,9,10; Be provided for producing the steel model 8 of track plate in each production area; Be provided for transmitting the wiring connector 7 of reinforcing bar pulling force between the steel model; The transverse stretching end carriage 13 that four limits of each production area are provided for the fixed lateral steel wire respectively and crosswise fixed end carriage 11 and vertically stretch-draw end carriage 6 and vertical fixed end beam 12, are provided with the transverse stretching mechanism 4 corresponding with the steel model position at production area 2, between 3 and production area 9 between 10, production area 2, between 9 and production area 3, the setting vertical stretch-draw mechanism 5 corresponding with the steel model position between 10.
Can find out that from the floor plan sketch map of Fig. 1 transverse stretching mechanism and vertical stretch-draw mechanism are with respect to the paired setting of end carriage and be provided with two groups at least.In this embodiment, each production unit comprises the vertical stretch-draw of many group transverse stretching mechanisms (ten groups of transverse stretching mechanisms have been shown among Fig. 1) and two groups mechanism.Vertically polylith steel model 8 is placed at the center, both sides of stretch-draw mechanism and transverse stretching mechanism symmetrically, and the quantity of the steel model that place the vertical stretch-draw mechanism in the middle part of being positioned at and the both sides of transverse stretching mechanism equates.What need explanation is that the quantity and the arrangement of above-mentioned vertical stretch-draw mechanism and transverse stretching mechanism and steel model can change according to actual needs.Have been found that preferably no more than six steel model is arranged at the center symmetrically in the horizontal, arrange the steel model more than two in the vertical.Under any circumstance, in four production areas, steel model is set symmetrically, delegation's one row steel model is set in each production area at least.
As shown in Figure 1, around the production unit counter force wall 1 and 14 are set, fixedly bring in the pulling force that bears compressor wire as compressor wire.
Further describe the vertical stretch-draw mechanism and the transverse stretching mechanism of the utility model below with reference to Fig. 2, Fig. 3; Wherein Fig. 2 shows the horizontal cross-sectional schematic of production unit with magnification ratio, and Fig. 3 shows the vertical cross-sectional schematic of part of production unit with magnification ratio.
As shown in Figure 2; Each transverse stretching mechanism comprises two transverse stretching jack 18, two transverse stretching small end beams 17, two transverse stretching end carriages 13 and ten six roots of sensation leading screws 15; Wherein single transverse stretching small end beam 17 is connected to form a unit with transverse stretching end carriage 13 by eight rhizoid thick sticks 15; Two unit intersect to be installed, and transverse stretching jack 18 is placed in the framework of being made up of transverse stretching small end beam 17.In addition, the two ends of said transverse stretching jack are provided with the little end carriage of stretch-draw respectively, and the stretch-draw small end beam at two ends is in transmission connection with the end carriage of adjacent edge of the heteropleural production area of himself place side respectively.The transverse stretching jack is provided with stretching force detecting apparatus 16 and self-locking mechanism.When implementing transverse stretching; Carry out synchronously the both sides of production unit; The stiff end of compressor wire hangs on the crosswise fixed end carriage 11 or wiring connector 7 in the production unit outside, and the transverse stretching small end beam 17 of transverse stretching jack 18 pushing tow symmetric arrangement applies prestressing force through leading screw 15,13 pairs of steel wires of transverse stretching end carriage; After reaching the setting value of thrust, the self-locking mechanism on the locking transverse stretching jack.Stretching force detecting apparatus that is provided with on the transverse stretching jack and self-locking mechanism all can adopt existing mature technology to implement, and repeat no more here.
As shown in Figure 3, vertically the composition of stretch-draw mechanism and transverse stretching mechanism is basic identical.As can be seen from Figure 3.Each vertical stretch-draw mechanism comprises the vertical stretch-draw small end beam of two vertical stretch-draw jack 21, two 19, two vertical stretch-draw end carriages 6 and ten six roots of sensation leading screws 22; Wherein single vertical stretch-draw small end beam 19 is connected to form a unit with vertical stretch-draw end carriage 6 by eight rhizoid thick sticks 22; Two unit be symmetrical in the central axis of production unit and vertically stretch-draw end carriage 6 install towards external chiasma, vertically stretch-draw jack 21 is placed in the framework of being made up of vertical stretch-draw small end beam 19.In addition, the two ends of said vertical stretch-draw jack are provided with the little end carriage of stretch-draw respectively, and the stretch-draw small end beam at two ends is in transmission connection with the end carriage of adjacent edge of the heteropleural production area of himself place side respectively.Vertically the stretch-draw jack is provided with stretching force detecting apparatus 20 and self-locking mechanism.When implementing vertical stretch-draw; Carry out synchronously the both sides of production unit; The stiff end of compressor wire hangs on the crosswise fixed end carriage 12 or wiring connector 7 in the production unit outside, and vertically vertical stretch-draw small end beam 19 of stretch-draw jack 21 pushing tow symmetric arrangement applies prestressing force through leading screw 22, vertical 6 pairs of steel wires of stretch-draw end carriage; After reaching the setting value of thrust, lock the self-locking mechanism on vertical stretch-draw jack.Stretching force detecting apparatus that vertically is provided with on the stretch-draw jack and self-locking mechanism all can adopt existing mature technology to implement, and repeat no more here.
In addition, can find out from Fig. 2,3 that for the ease of maintenance, steel model 8 built on stilts being placed on the production line concrete frame are provided with a space 14 that supplies installation, maintenance, layout pipeline, the residual quarrel of cleaning spillage below steel model 8.
See from the production angle; The production technology of the bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model mainly comprises: unclamp rigid support, loosen steel wire stress, cutter wire, unclamp side plate combination locking device, the demoulding, production board transportation, take off side plate and take off that end plate, turnover panel, detection, water are supported, cutting steel bar end, the antirust processing of steel bar end, side plate end plate cleaning combination, wear accessory, steel wires such as a heading, cleaning mould spraying releasing agent, mounting sleeve and incorporate into mould, locking side plate and end plate, installation vertical reinforcement, stretching wire, concrete perfusion, vibration moulding, maintenance etc.; Above process can adopt existing mature technology to implement, and repeats no more at this.
The bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model also has the production efficiency height, invests the incomparable advantages of long-line pedestal method such as low except the various advantages that possess long-line pedestal method, and said advantage mainly comprises:
1. tensioning system is arranged on the center line of table top (be long-surface pedestal the axis of symmetry of direction on) in length and breadth, and steel model is arranged in the both sides of tensioning system.During stretch-draw, the both sides stretching force is active force and reaction force each other, thereby has not only practiced thrift tensioning equipment and counter force wall, and a maximum amount of side-shift of steel model when having reduced to put.
2. around the production line counter force wall is set, can bears the pulling force of compressor wire.
3. jack is arranged on the production line middle part, not only can apply prestressing force to the steel wire in the steel model of both sides simultaneously, and reduce the amount of side-shift of steel model when loosening steel wire stress.
4. be provided with wiring connector around the steel model, can realize that demoulding limit, limit goes into the operation procedure of silk, reach the purpose that increases substantially production efficiency.
5. adopt aerial construction, left adequate space below jack, the steel model, be the condition of providing convenience such as maintenance of equipment, installation.
6. steel model can be put on the Zhang Fangxiang at two and move freely when compressor wire loosened in length and breadth, can after the steel wire cutting, automatically reset simultaneously;
7. solved the problem that pins down of a vertical, horizontal steel wire when putting.
8. has industrial high efficiency rate production in enormous quantities ability under the prerequisite that guarantees high accuracy manufacturing requirement.
In addition, the bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model also can further improve its technique effect through adopting elastic bearing and wire locking system.Specifically, elastic bearing allows steel model when steel wire is put, to move freely, and after the steel wire cutting, automatically resets.The wire locking system guarantees that then any variation does not take place the relative position of compressor wire and steel model in the concrete setting process, thereby avoids reducing the cohesive force between steel wire and the concrete.In addition, when producing, the maximum amount of side-shift in the time of can controlling steel model and put, the side template of steel model is removed after putting simultaneously.Like this, when steel wire was put, the steel model side template can protect track plate top layer concrete by the compressor wire damage, and the problem that pins down each other when overcoming steel wire in length and breadth and putting.
The bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model can be used for the concrete railway board that production has multilayer (especially double-deck) vertical and horizontal compressor wire; Wherein under the situation that is respectively equipped with multilayer longitudinal prestressing steel wire and multilayer transverse prestress steel wire, longitudinal prestressing steel wire and transverse prestress steel wire preferably are arranged in the both sides, cross section of track plate respectively symmetrically.
Facts have proved that the bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain of the utility model can be enhanced productivity greatly, reduce investment.With a length is that 100 meters, the long-surface pedestal of six steel models of lateral arrangement are example, can class's product track plate 108, produce per year above 30,000.
More than combine specific embodiment that the utility model is described in detail.Clearly, more than describe and embodiment illustrated in the accompanying drawings all should be understood that it is exemplary, but not to the restriction of the utility model.To those skilled in the art, be readily appreciated that each characteristic that provides in specification independent assortment or variation as required.And, on the basis of the principle of the utility model and instruction, can under the situation of the spirit that does not break away from the utility model, carry out various modification or modification to it.For example; Though the stretch-draw mechanism of stretch-draw jack form has been shown among the figure; But also can improve or change, perhaps utilize other mechanism as known in the art to replace this stretch-draw jack, as long as it can realize the purpose of the utility model to the structure of this stretch-draw jack.These modification or modification obviously all do not break away from the scope of the utility model.

Claims (10)

1. bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain; It is characterized in that; Comprise one or more production units; Each production unit comprises four symmetrically arranged production areas; Be provided for producing the steel model of track plate in each production area, four limits of each production area are provided for fixedly transverse stretching end carriage and crosswise fixed end carriage and vertically the stretch-draw end carriage and vertically fixed end beam of steel wire respectively, and the transverse stretching mechanism corresponding with the steel model position or vertical stretch-draw mechanism are set between the adjacent edge of each production area.
2. bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain as claimed in claim 1 is characterized in that in each production unit, no more than six steel model is arranged at the center symmetrically in the horizontal, arranges the steel model more than two in the vertical.
3. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain; It is characterized in that; In said transverse stretching mechanism and the said vertical stretch-draw mechanism each comprises the stretch-draw jack; The two ends of said stretch-draw jack are provided with the little end carriage of stretch-draw respectively, and the stretch-draw small end beam at two ends is in transmission connection with the end carriage of adjacent edge of the heteropleural production area of himself place side respectively.
4. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, each in said transverse stretching mechanism and the said vertical stretch-draw mechanism is with respect to the paired setting of end carriage and be provided with two groups at least.
5. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, said transverse stretching mechanism and said vertical stretch-draw mechanism all are provided with stretching force detecting apparatus.
6. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, said transverse stretching mechanism and said vertical stretch-draw mechanism all are provided with self-locking mechanism.
7. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, counter force wall is set around the said production unit, fixedly brings in the pulling force that bears compressor wire as compressor wire.
8. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, in said four production areas, steel model is set symmetrically, and delegation's one row steel model is set in each production area at least.
9. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, is provided with wiring connector around the said steel model.
10. according to claim 1 or claim 2 bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain is characterized in that, the steel model in the said production area is built on stilts to be provided with, in the downside reservation operations space of steel model.
CN2011202393238U 2011-07-01 2011-07-01 Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates Expired - Fee Related CN202114804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202393238U CN202114804U (en) 2011-07-01 2011-07-01 Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202393238U CN202114804U (en) 2011-07-01 2011-07-01 Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates

Publications (1)

Publication Number Publication Date
CN202114804U true CN202114804U (en) 2012-01-18

Family

ID=45455900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202393238U Expired - Fee Related CN202114804U (en) 2011-07-01 2011-07-01 Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates

Country Status (1)

Country Link
CN (1) CN202114804U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785281A (en) * 2012-08-21 2012-11-21 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN105619600A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Synchronous tensioning and releasing control system for pre-tensioned track boards
CN106079068A (en) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 One is first opened precast track plate Synchronous Radio and is opened device and its implementation
CN106079067A (en) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 The tensioning equipment of a kind of precast track plate and method thereof
CN106945170A (en) * 2016-12-27 2017-07-14 山西高行液压股份有限公司 Pre-tensioning system produces the steel bar tensioning device of high speed railway fragments-free track slab
CN108687951A (en) * 2018-04-27 2018-10-23 天津银龙预应力材料股份有限公司 A kind of locking equipment and in groups sleeper tensioning locking equipment
CN115070930A (en) * 2022-07-26 2022-09-20 汤始建华建材(上海)有限公司 Automatic mold entering equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785281A (en) * 2012-08-21 2012-11-21 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN102785281B (en) * 2012-08-21 2014-08-06 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN105619600A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Synchronous tensioning and releasing control system for pre-tensioned track boards
CN106079068A (en) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 One is first opened precast track plate Synchronous Radio and is opened device and its implementation
CN106079067A (en) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 The tensioning equipment of a kind of precast track plate and method thereof
CN106079068B (en) * 2016-08-08 2018-09-14 中国铁道科学研究院铁道建筑研究所 It is a kind of first to open precast track plate Synchronous Radio device and its implementation
CN106945170A (en) * 2016-12-27 2017-07-14 山西高行液压股份有限公司 Pre-tensioning system produces the steel bar tensioning device of high speed railway fragments-free track slab
CN108687951A (en) * 2018-04-27 2018-10-23 天津银龙预应力材料股份有限公司 A kind of locking equipment and in groups sleeper tensioning locking equipment
CN115070930A (en) * 2022-07-26 2022-09-20 汤始建华建材(上海)有限公司 Automatic mold entering equipment

Similar Documents

Publication Publication Date Title
CN102848462B (en) Bidirectional pre-tensioned prestressed concrete railway board long-surface pedestal production chain
CN202114804U (en) Long-surface pedestal production line for bidirectional pretensioned prestressed concrete track plates
CN101380777B (en) Bidirectional pre-tensioned rail plate long-surface pedestal production chain
CN100586682C (en) Advanced tension method bi-directional prestress concrete track board steel model
CN101440604B (en) Cable opposite pulling type pier-side bracket
CN101603281B (en) Integral ballastless track
CN203546626U (en) Suspender replacing device for concrete-filled steel tube arch bridge
CN106836597B (en) A kind of fixed device of cassette ceiling core model and its construction method
CN204174541U (en) Continuous girder bridge suspended casting suspended basket push unit
CN103255718A (en) Pre-tensioning method plate-beam track movable type steel transverse beam integer tensioning device and tensioning technology
CN106541489B (en) Bridge deck prefabricated formwork system
CN201883346U (en) Prestressed concrete track slab of slab-type ballastless track
CN201915299U (en) Pretensioned prestressed concrete track slab of slab ballastless track
CN201279834Y (en) Bidirectional pre-tensioning rail panel long face cabinet leg product line
CN106012834B (en) A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system
CN2933805Y (en) Pretensioned bidirectional prestressing concrete rail plate steel mould
CN203284732U (en) Pre-tensioning plate girder track movable steel beam integral tensioning device
CN203792513U (en) Construction facility for producing prestress hollow slab beams in batches
CN215714703U (en) Anti-pre-compaction device that draws of box girder bracket steel strand wires that waters of hanging
CN106988543A (en) Lower supporting type overhanging unloading platform and construction technology
CN208501463U (en) Wind resistance damping steel pipe arch bridge limiting device
CN203792508U (en) Force transmission column structure of plate-girder stretch-draw table
CN202185976U (en) Prestressed stretching-drawing working bracket for prefabricated beam slab
CN201459522U (en) Integral type ballastless track
CN204748919U (en) Apparatus for producing that is suitable for big gauge track board of severe cold district high -speed railway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20130701