CN202185976U CN 201120324761 CN201120324761U CN202185976U CN 202185976 U CN202185976 U CN 202185976U CN 201120324761 CN201120324761 CN 201120324761 CN 201120324761 U CN201120324761 U CN 201120324761U CN 202185976 U CN202185976 U CN 202185976U
Authority
CN
China
Prior art keywords
support
precast
locomotive
prestressed stretch
working rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120324761
Other languages
Chinese (zh)
Inventor
段绍团
肖聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changda Highway Engineering Co Ltd filed Critical Guangdong Changda Highway Engineering Co Ltd
Priority to CN 201120324761 priority Critical patent/CN202185976U/en
Application granted granted Critical
Publication of CN202185976U publication Critical patent/CN202185976U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a prestressed stretching-drawing working bracket for a prefabricated beam slab, which mainly comprises a first connecting bracket, a second connecting bracket, a third connecting bracket, a transverse moving trolley bracket and a transverse moving trolley which are arranged in sequence from bottom to top, wherein the transverse moving trolley is positioned on the transverse moving trolley bracket; four wheels are arranged at the bottom of the first connecting bracket; a wheel track rail of the transverse moving trolley is arranged at the top of the transverse moving trolley bracket; and the transverse moving trolley comprises moving wheels, a transverse moving trolley cross beam, a transverse moving trolley axle stand pedestal positioned at two ends of the transverse moving trolley cross beam, and a lifting hook hung right under the transverse moving trolley cross beam by a steel wire rope. The prestressed stretching-drawing working bracket for the prefabricated beam slab is formed by assembling a plurality of shaped connecting brackets with different heights, can adapt to the actual working conditions of different beam heights, and is easy to mount, reasonable in design and easy to operate, and has a reasonable design; the transverse moving trolley cross beam bears the load of a jack; and the jack is suspended on the lifting hook and can be guaranteed to be accurately placed in position, so as to quicken thea construction progress.

Description

A kind of prestressed stretch-draw Working rack that is used for precast beam
Technical field
The utility model belongs to science of bridge building Architectural Equipment technical field, relates to a kind of prestressed stretch-draw Working rack that is used for precast beam specifically.
Background technology
At present, in highway bridge post stressed concrete work progress, prestress wire stretch-draw is one critical process, and it directly influences the stretch-draw quality of precast beam.And in the stretching process of precast beam, the meeting accurate in place of jack directly influences the quality and the efficient of stretch-draw, and whether jack is in place accurate, and key is the prestressed stretch-draw support.Prestressed stretch-draw support commonly used at present has three kinds: first kind is to adopt steel pipe to be welded temporarily; Second kind is that an end places the cantilever support on the back; The third is to adopt portal support to build temporarily.Though these prestressed stretch-draw supports can satisfy the stretch-draw demand under certain condition, all there is operation inconvenience, locatees shortcomings such as inaccurate, and be not easy to dismantle, shift and carrying.
Because there is multiple inconvenience in prestressed stretch-draw support of the prior art; Therefore people are attempting the stretch-draw support is improved; Like the patent No. is that 201020158721.2 Chinese utility model patent just discloses a kind of box girder pre-stressed stretch-draw Working rack; Though this support improves prestressed stretch-draw support of the prior art to a certain extent, still there is following deficiency in this support: the one, and this support adopts an end to place the cantilevered fashion of back, needs could shift after the dismounting; The 2nd, this support needs support customized again for the beam slab of differing heights, causes waste of material; The 3rd, horizontal travelling car places and vertically moves on the cart, in practical operation, more difficulty is arranged, particularly for higher beam slab.
The utility model content
The utility model provides a kind of prestressed stretch-draw Working rack that is used for precast beam that shifts and can adapt to different deck-moldings simple in structure, easy to operate, convenient in order to overcome the deficiency that prior art exists.
The utility model is realized through following technical scheme: a kind of prestressed stretch-draw Working rack that is used for precast beam, and it mainly first is connected support, second and connects that support, the 3rd connects support, laterally locomotive support and the horizontal locomotive that is positioned on the said horizontal locomotive support are formed by what set gradually from bottom to top; Bottom at the first connection support is provided with four wheels; Top at horizontal locomotive support is provided with horizontal locomotive wheel rail, and laterally locomotive comprises mobile wheel, horizontal locomotive crossbeam, is positioned at the horizontal locomotive pedestal at horizontal locomotive crossbeam two ends and passes through the suspension hook of wire rope hanging under horizontal locomotive crossbeam.
The said first connection support, the second connection support, the 3rd connection support and horizontal locomotive support are by four standpipes and be arranged at cross-brace pipe and the oblique stay pipe composition between adjacent two standpipes; Be socketed with fixed muffle between two standpipes of next-door neighbour up and down, such structure can guarantee respectively to connect stablizing between the support.
The said first connection support is the first high connection support of 10cm.
The said second connection support is the second high connection support of 20cm.
Said the 3rd connection support is the 3rd a high connection support of 50cm.
Said horizontal locomotive support is the high horizontal locomotive support of 15cm.
Four wheels of the said first connection frame bottom are four universal wheels.
The horizontal locomotive crossbeam of said horizontal locomotive is welded by shaped steel.
Said wheel rail is welded by equilateral channel steel, is respectively arranged with block at the two ends of said wheel rail, is used for stoping horizontal locomotive to skid off.
The said prestressed stretch-draw Working rack that is used for precast beam connects support, the 3rd connection support and a horizontal locomotive support by several first connection supports, second and forms, thereby can adapt to the stretch-draw needs of different deck-moldings.
The beneficial effect of the utility model is: the prestressed stretch-draw Working rack that is used for precast beam of the utility model is compared with prestressed stretch-draw support of the prior art; The utility model is assembled by some connection supports of typing that need not height; So can adapt to the real work situation of different deck-moldings, be very easy to install; Owing to be provided with four universal wheels in the bottom of stretch-draw Working rack, so the prestressed stretch-draw Working rack of the utility model can shift easily and fast; The prestressed stretch-draw Working rack that is used for precast beam of the utility model is reasonable in design; Easy to operate, improved the quality and the efficient of the operation of precast beam prestressed stretch-draw greatly, laterally the locomotive crossbeam bears the load of jack; Jack is suspended on the suspension hook; Can guarantee the accurately in place of jack, thereby guarantee that jack is in place accurately, and then accelerating construction progress.
Description of drawings
Fig. 1 is a kind of Facad structure sketch map that is used for the prestressed stretch-draw Working rack of precast beam of the utility model;
Fig. 2 is a kind of side structure sketch map that is used for the prestressed stretch-draw Working rack of precast beam of the utility model;
Fig. 3 is a kind of top surface structure sketch map that is used for the prestressed stretch-draw Working rack of precast beam of the utility model;
Fig. 4 is a kind of side structure sketch map that is used for the horizontal locomotive of prestressed stretch-draw Working rack of precast beam of the utility model;
Wherein: 1. first connects support; 2. second connects support; 3. the 3rd connects support; 4. horizontal locomotive support; 5. horizontal locomotive; 6. universal wheel; 7. wheel rail; 8. mobile wheel; 9. horizontal locomotive crossbeam; 10. horizontal locomotive pedestal; 11. steel wire rope; 12. suspension hook; 13. standpipe; 14. cross-brace pipe; 15. oblique stay pipe; 16. fixed muffle; 17. block.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is described in detail.
Embodiment 1: extremely shown in Figure 4 like Fig. 1; A kind of prestressed stretch-draw Working rack that is used for precast beam, its mainly by a 10cm who sets gradually from bottom to top high first connect support 1,20cm high second connect support 2,50cm high the 3rd connect support 3, a horizontal locomotive support 4 that 15cm is high and the horizontal locomotive 5 that is positioned on the horizontal locomotive support 4 is formed; Bottom at the first connection support 1 is provided with four universal wheels 6; Be provided with horizontal locomotive wheel rail 7 at the horizontal top of locomotive support 4, said horizontal locomotive 5 comprise mobile wheel 8, laterally locomotive crossbeam 9, be positioned at the horizontal locomotive pedestal 10 at horizontal locomotive crossbeam 9 two ends and be hung on the suspension hook 12 under the horizontal locomotive crossbeam 9 through steel wire rope 11.First connect support 1, second connect support the 2, the 3rd connect support 3 and laterally locomotive support 4 form by four standpipes 13 and the cross-brace pipe 14 and the oblique stay pipe 15 that are arranged between adjacent two standpipes 13; Be socketed with fixed muffle 16 between two standpipes 13 of next-door neighbour up and down; Laterally the horizontal locomotive crossbeam 9 of locomotive 5 is welded by shaped steel; Said wheel rail 7 is welded by equilateral channel steel, is respectively arranged with block 17 at the two ends of wheel rail 7.
Embodiment 2: extremely shown in Figure 4 like Fig. 1; A kind of prestressed stretch-draw Working rack that is used for precast beam; Form by three kinds of setting brackets; 10cm high first connect support 1,20cm high second connect support 2,50cm high the 3rd connect support 3, every kind of setting bracket is made 2~3, makes up according to the actual height of precast beam.Setting bracket mainly is made up of standpipe 13, oblique stay pipe 15 and cross-brace pipe 14.The connection of each adjacent setting bracket is adopted and is close to 16 sockets of standpipe 13 connection fixed muffles up and down.After the installation of stretch-draw support; The high horizontal locomotive support 4 of 15cm is installed again; Its connected mode adopts too and is close to standpipe 13 up and down and connects fixed muffles 16 sockets, laterally on the locomotive support 4 horizontal locomotive wheel rail 7 is being installed, and wheel rail 7 is welded by channel-section steel; At wheel rail 7 two ends block 17 is set; Laterally locomotive 5 is made up of a horizontal locomotive crossbeam 9, two horizontal locomotive pedestals 10 and four mobile wheels 8, and horizontal locomotive crossbeam 9 bears the load of jack, and jack is suspended on the suspension hook 12.
A kind of prestressed stretch-draw Working rack that is used for precast beam of the utility model uses as follows: 1, mounting bracket: universal wheel 6 at first is installed; Select corresponding setting bracket and installation according to the actual height of precast beam again; High laterally locomotive support 4 of 15cm and horizontal locomotive 5 are installed at last; Behind the installation in position, hang over the cucurbit chain on the suspension hook 12 under the horizontal locomotive crossbeam 9.2, jack is in place: because the bottom of the prestressed stretch-draw Working rack that is used for precast beam of the utility model is provided with four universal wheels 6; So can promote whole prestressed stretch-draw Working rack moves; Make jack be positioned at steel strand wires under, through up-down cucurbit chain rising jack, make jack and steel strand wires be in same horizontal level again; Laterally move jack through horizontal locomotive 5 at last, jack is accurately advanced along the direction of steel strand wires.
Should be noted that at last; Above content is only in order to explain the technical scheme of the utility model; But not to the restriction of the utility model protection domain; The simple modification that those of ordinary skill in the art carries out the technical scheme of the utility model perhaps is equal to replacement, does not all break away from the essence and the scope of the utility model technical scheme.

Claims (10)

1. prestressed stretch-draw Working rack that is used for precast beam is characterized in that: the said prestressed stretch-draw Working rack that is used for precast beam mainly first is connected support, second and connects that support, the 3rd connects support, laterally locomotive support and the horizontal locomotive that is positioned on the said horizontal locomotive support are formed by what set gradually from bottom to top; Bottom at the said first connection support is provided with four wheels; Be provided with horizontal locomotive wheel rail at the top of said horizontal locomotive support, said horizontal locomotive comprises mobile wheel, horizontal locomotive crossbeam, is positioned at the horizontal locomotive pedestal at horizontal locomotive crossbeam two ends and passes through the suspension hook of wire rope hanging under said horizontal locomotive crossbeam.
2. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1; It is characterized in that: the said first connection support, the second connection support, the 3rd connection support and horizontal locomotive support are by four standpipes and be arranged at cross-brace pipe and the oblique stay pipe composition between adjacent two standpipes, are socketed with fixed muffle between two standpipes that are close to up and down.
3. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: the said first connection support is the first high connection support of 10cm.
4. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: the said second connection support is the second high connection support of 20cm.
5. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: said the 3rd connection support is the 3rd a high connection support of 50cm.
6. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: said horizontal locomotive support is the high horizontal locomotive support of 15cm.
7. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: four wheels of the said first connection frame bottom are four universal wheels.
8. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: the horizontal locomotive crossbeam of said horizontal locomotive is welded by shaped steel.
9. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2, it is characterized in that: said wheel rail is welded by equilateral channel steel, is respectively arranged with block at the two ends of said wheel rail.
10. the prestressed stretch-draw Working rack that is used for precast beam according to claim 1 and 2 is characterized in that: the said prestressed stretch-draw Working rack that is used for precast beam connects support, the 3rd connection support and a horizontal locomotive support by several first connection supports, second and forms.
CN 201120324761 2011-08-31 2011-08-31 Prestressed stretching-drawing working bracket for prefabricated beam slab Expired - Fee Related CN202185976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120324761 CN202185976U (en) 2011-08-31 2011-08-31 Prestressed stretching-drawing working bracket for prefabricated beam slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120324761 CN202185976U (en) 2011-08-31 2011-08-31 Prestressed stretching-drawing working bracket for prefabricated beam slab

Publications (1)

Publication Number Publication Date
CN202185976U true CN202185976U (en) 2012-04-11

Family

ID=45917445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120324761 Expired - Fee Related CN202185976U (en) 2011-08-31 2011-08-31 Prestressed stretching-drawing working bracket for prefabricated beam slab

Country Status (1)

Country Link
CN (1) CN202185976U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699997A (en) * 2012-06-08 2012-10-03 中铁十九局集团第六工程有限公司 Longitudinal post-tensioned prestressed beam moving system and method
CN103831899A (en) * 2014-03-07 2014-06-04 中铁四局集团第一工程有限公司 Tensioning equipment safety suit application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699997A (en) * 2012-06-08 2012-10-03 中铁十九局集团第六工程有限公司 Longitudinal post-tensioned prestressed beam moving system and method
CN102699997B (en) * 2012-06-08 2014-07-09 中铁十九局集团第六工程有限公司 Longitudinal post-tensioned prestressed beam moving system and method
CN103831899A (en) * 2014-03-07 2014-06-04 中铁四局集团第一工程有限公司 Tensioning equipment safety suit application method
CN103831899B (en) * 2014-03-07 2016-09-28 中铁四局集团第一工程有限公司 A kind of tensioning equipment is set with safely using method

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN202755635U (en) Movable-type basket support
CN112030777B (en) Descending movable formwork support bracket crossing type transfer construction method
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN201850076U (en) Gate-shaped stand rod hoist of contact network
CN202185976U (en) Prestressed stretching-drawing working bracket for prefabricated beam slab
CN202465067U (en) Crane cart traveling mechanism with travel switch
CN201817208U (en) Simple lifting machine
CN202390106U (en) Lifting hook portal crane easy to maintain
CN201556864U (en) Hoisting bracket for 110kV disconnector
CN202440242U (en) Ballastless track cantilever type gantry crane
CN202449757U (en) Motor-driven single-beam suspending crane
CN201933411U (en) Railway erecting-paving machine
CN203624768U (en) Construction hoist capable of carrying climbing formwork
CN202542732U (en) Mechanism for replacing auxiliary hoisting wire rope of four-beam four-rail dual-trolley bridge crane
CN202429913U (en) Movable crane
CN203033681U (en) Dual-purpose travelling crane for object transportation and support assembly in underground coal mine
CN201942466U (en) Hoisting device for indoor prefabricated component
CN202609884U (en) Mobile sit-on-the-fence frame hanging basket suspension mechanism
CN202689494U (en) Elevator shaft template support
CN202449760U (en) Container portal crane with rails
CN201485204U (en) Gas tank hanging device
CN201433051Y (en) Large-scale rack lower boom double-track single-beam lifting crane
CN201174560Y (en) Elevated DC feeding power supplying apparatus
CN203307370U (en) Annular mounting bracket for hoisting smelting converter

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20130831

C17 Cessation of patent right