CN202114249U - Ferroalloy baking and feeding system - Google Patents

Ferroalloy baking and feeding system Download PDF

Info

Publication number
CN202114249U
CN202114249U CN2011202187989U CN201120218798U CN202114249U CN 202114249 U CN202114249 U CN 202114249U CN 2011202187989 U CN2011202187989 U CN 2011202187989U CN 201120218798 U CN201120218798 U CN 201120218798U CN 202114249 U CN202114249 U CN 202114249U
Authority
CN
China
Prior art keywords
baking
weighing
ferroalloy
feeding system
feed bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202187989U
Other languages
Chinese (zh)
Inventor
郑黔
白映林
方颖
刘平
蔡礼银
刘志强
陈杰
曾光明
周英豪
李建宣
何勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Guiyang Special Steel Co Ltd
Original Assignee
Shougang Guiyang Special Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Guiyang Special Steel Co Ltd filed Critical Shougang Guiyang Special Steel Co Ltd
Priority to CN2011202187989U priority Critical patent/CN202114249U/en
Application granted granted Critical
Publication of CN202114249U publication Critical patent/CN202114249U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)
  • Furnace Charging Or Discharging (AREA)

Abstract

The utility model discloses a ferroalloy baking and feeding system, which comprises an overhead feed bin (1). A gas baking nozzle (2) is mounted at the bottom of the overhead feed bin (1) and connected with a gas pipeline, a discharge outlet of the overhead feed bin (1) is connected with a vibration feeder (3), and a weighing cart (4) is arranged below the vibration feeder (3). The ferroalloy baking and feeding system integrates functions of baking, weighing and transporting, and simultaneously, transport cost, electric energy consumption and production cost are reduced, automation level is high, labor intensity of operators is reduced greatly, smelting time is shortened, quality of billet steel is improved and economic benefits are high.

Description

A kind of ferroalloy baking charging system
Technical field
The utility model relates to a kind of ferroalloy baking charging system, belongs to metallurgical technology field.
Background technology
Ferroalloy is one of important source material of steel-making.At present, be earlier alloy to be transported to alloyed region with automobile when using ferroalloy, be transported in the drying room with fork truck again; After the drying room oven dry insulation regular hour; Transport to electric furnace zone, workshop with fork truck again, add in the ladle with driving, its main purpose is to remove the moisture of alloy; Guarantee product quality, avoid producing in the steel billet defectives such as white point, crackle.Following three problems appear in this mode in actual production process: first problem is that will produce continuously about 20 stoves every day because every stove steel capital will add alloy one time, and drying room is far away apart from the production scene, causes cost of transportation higher; Second problem is that the drying room maintenance cost is big, and the drying room capacity is little, frequent switch drying room gate, and the drying room insulation is bad, and power consumption is big; The 3rd problem is that alloy is transported to the scene, workshop with fork truck; Before alloy adds ladle; Alloy after every stove steel capital will carry out will dry with the mode of canned material with driving after the accurate weighing again joins in the ladle, needs the special messenger to operate, not only labor intensive but also prolonged the time of smelting.
The utility model content
The ferroalloy that the utility model technical problem to be solved is to provide a kind of shortens the heat, reduces production costs toasts charging system, thereby overcomes the deficiency of above-mentioned prior art.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: a kind of ferroalloy baking charging system, and its formation comprises high hopper, in the bottom of described high hopper the coal gas roasting nozzle is housed, the coal gas roasting nozzle connects gas piping; The discharging opening of high hopper connects oscillating feeder, the dolly of below oscillating feeder, weighing.
Above-mentioned ferroalloy baking charging system also is equipped with batching position limit switch and unloads the material level limit switch on the orbit of dolly of weighing.
Beneficial effect: compared with prior art, it is integrated that the utility model has realized that alloy baking, alloy weighing, alloy transport, and reduced cost of transportation and power consumption; Reduced production cost; Automaticity is high, has alleviated labor intensity of operating personnel greatly, has shortened the duration of heat; Improved the quality of steel billet, economic benefit is considerable.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is further described.
The specific embodiment
Embodiment 1.As shown in Figure 1, comprise high hopper 1, two high hoppers 1 are set in this example, the volume of each high hopper 1 is 6 cubes.In the bottom of high hopper 1 coal gas roasting nozzle 2 is housed, coal gas roasting nozzle 2 connects gas piping; The discharging opening of two high hoppers 1 connects two oscillating feeders 3 respectively; The dolly 4 of below the material inlet of oscillating feeder 3, weighing; The dolly 4 of weighing moves about on the orbit 5; Be the accurate location of the dolly 4 that guarantees to weigh, a batching position limit switch 6 and one be installed on orbit 5 unload material level limit switch 7.
During use; Alloy adds in the high hopper 1 through hopper, and after toasting through the alloy in 2 pairs of high hoppers of coal gas roasting nozzle 1 of high hopper 1 bottom, is transported to the dolly 4 of weighing by oscillating feeder 3 again; After the dolly 4 accurate weighings of weighing, transportation puts in place and joins in the ladle.Electric furnace is translated into molten steel in the ladle, transports to refining in the smart stove stove by buggy ladle again, and it is integrated so just to have realized that alloy baking, alloy weighing, alloy transport.
The embodiment of the utility model is not limited to the foregoing description, all belongs within the protection domain of the utility model in the various variations of making under the prerequisite that does not break away from the utility model aim.

Claims (2)

1. a ferroalloy baking charging system comprises high hopper (1), and it is characterized in that: in the bottom of said high hopper (1) coal gas roasting nozzle (2) is housed, coal gas roasting nozzle (2) connects gas piping; The discharging opening of high hopper (1) connects oscillating feeder (3), the dolly (4) of weighing in the below of oscillating feeder (3).
2. ferroalloy baking charging system according to claim 1 is characterized in that: batching position limit switch (6) is installed on the orbit (5) of the said dolly of weighing (4) and unloads material level limit switch (7).
CN2011202187989U 2011-06-25 2011-06-25 Ferroalloy baking and feeding system Expired - Fee Related CN202114249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202187989U CN202114249U (en) 2011-06-25 2011-06-25 Ferroalloy baking and feeding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202187989U CN202114249U (en) 2011-06-25 2011-06-25 Ferroalloy baking and feeding system

Publications (1)

Publication Number Publication Date
CN202114249U true CN202114249U (en) 2012-01-18

Family

ID=45455347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202187989U Expired - Fee Related CN202114249U (en) 2011-06-25 2011-06-25 Ferroalloy baking and feeding system

Country Status (1)

Country Link
CN (1) CN202114249U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102853678A (en) * 2012-08-28 2013-01-02 芜湖新兴铸管有限责任公司 Online baking device for alloy feeding trolley
CN102937378A (en) * 2012-10-31 2013-02-20 中冶南方工程技术有限公司 Method and device for automatic loading of roasting alloys in silicon steel production
CN104534881A (en) * 2014-01-13 2015-04-22 中冶南方工程技术有限公司 Automatic iron alloy roasting and feeding structure and method thereof
CN107858486A (en) * 2017-12-20 2018-03-30 中国重型机械研究院股份公司 A kind of online alloy baking feed bin of vacuum refining of liquid steel
CN108034840A (en) * 2017-11-30 2018-05-15 安徽省恒伟铋业有限公司 A kind of thick bismuth automation rectification systems and its operating method
CN109823863A (en) * 2019-02-15 2019-05-31 石家庄钢铁有限责任公司 A kind of steel-smelting alloy and slag charge automatic blanking weighing charging device and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102853678A (en) * 2012-08-28 2013-01-02 芜湖新兴铸管有限责任公司 Online baking device for alloy feeding trolley
CN102853678B (en) * 2012-08-28 2014-06-18 芜湖新兴铸管有限责任公司 Online baking device for alloy feeding trolley
CN102937378A (en) * 2012-10-31 2013-02-20 中冶南方工程技术有限公司 Method and device for automatic loading of roasting alloys in silicon steel production
CN104534881A (en) * 2014-01-13 2015-04-22 中冶南方工程技术有限公司 Automatic iron alloy roasting and feeding structure and method thereof
CN104534881B (en) * 2014-01-13 2017-01-25 中冶南方工程技术有限公司 Automatic iron alloy roasting and feeding structure and method thereof
CN108034840A (en) * 2017-11-30 2018-05-15 安徽省恒伟铋业有限公司 A kind of thick bismuth automation rectification systems and its operating method
CN107858486A (en) * 2017-12-20 2018-03-30 中国重型机械研究院股份公司 A kind of online alloy baking feed bin of vacuum refining of liquid steel
CN109823863A (en) * 2019-02-15 2019-05-31 石家庄钢铁有限责任公司 A kind of steel-smelting alloy and slag charge automatic blanking weighing charging device and method

Similar Documents

Publication Publication Date Title
CN202114249U (en) Ferroalloy baking and feeding system
KR101751075B1 (en) Steel production facility, a steel making method using the same, a method of using an electric energy in the same
CN105522124A (en) Automatic inoculant charging system of casting production line
CN102061360B (en) Method for lowering installation height of Ruhstahl Hausen (RH) vacuum processing device under low rail surface elevation condition
CN204185539U (en) A kind of device of stokehold process titanium slag
CN102853678B (en) Online baking device for alloy feeding trolley
CN203405077U (en) Modularized arc furnace automatic feeding device
CN112195303B (en) Process arrangement structure of steelmaking workshop with horizontal continuous charging electric furnace
CN203593635U (en) Continuously-heating type fused alumina synthesizing device
CN102374786B (en) Hot aggregate bin capable of automatically receiving and feeding materials and hot aggregate tank matched with hot aggregate bin
CN206521505U (en) Pre-reduced pellet direct-furnish electric furnace hot charging system
CN204944168U (en) Casting smelting intermediate frequency furnace
CN219841804U (en) Feeding system of double-shaft type scrap steel preheating electric furnace
CN204944169U (en) Casting smelting intermediate frequency furnace increase part
CN209871784U (en) Material feeding device of feeding system under two blast furnace troughs
CN204661747U (en) A kind of Anti-blockage type blast furnace middle hopper
CN104894326B (en) Novel iron alloy baking system based on converter and technique
CN203061283U (en) Cyclic utilization system for electric furnace wastes
CN204509420U (en) Dry and the e Foerderanlage from sedimentation of flash metallurgy powder
CN102937378A (en) Method and device for automatic loading of roasting alloys in silicon steel production
CN204874694U (en) Nickel is smelted and is arranged sediment device
CN110257629B (en) Full-hot-charging production line and production process for ferromanganese production
CN202562263U (en) Intermediate-frequency induction continuous heating furnace for production of vanadium-nitrogen alloy
CN202853398U (en) On-line baking device of alloy charging car
CN215162891U (en) Converter stove back combination feeding device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20140625

EXPY Termination of patent right or utility model